Correction Notice - Maintenance Bond Inspection, Steichen Short Plat.pdf CITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov th February 92017PLN20080041 DATE:PERMIT NUMBER: OWNER:Acme HomesLLC.SITE CONTACT:Chris Eddy th ADDRESS:23419 84Ave W TYPE OF INSPECTION:MAINTENEANCE BOND RELEASE INSPECTION WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASEOF WORK IS STARTED. RECALL FOR INSPECTION REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1.The correctionslisted below will require a Right of way permit(please find attached a Right of Way permit application). A traffic control plan will need to be submitted with the ROW application. 2.Asphalt joints need to be re-sealed for the 2’ asphalt cutsand patches (midway frontage and th across 84Ave West). 3.Asphalt crackingat the north side of the frontage improvements within the right of way where the 2’ asphalt cut ends will need to be sealed. 4.Due to joint tack placement,striping will need to be redone(fogline and center lines). 5.A section of the concrete approach curb/gutter will need to be replaced. Please see image below forlimits to be replaced within red.Inspections will need to be scheduled with the obtained Right of Way permit.Concrete removal shall have a clean saw cut along all 4 sides of the gutter. Inspector will inspect cuts to determine approval for concrete pour. 6.Per Olympic ViewWater & Sewer District (OVWSD), the sewer cleanouts for the site at the right of way will need to be brought to grade and set to specification. Please see attached detail drawing S-3. Page 2of 3 7.Asphalt walkway has settled around the water main valves. The section of asphalt walkway will need to be repaved for a consistent slope.Inspections for replacement to be scheduled through right of way permit. The actions or corrections indicated above are required to be corrected prior to Maintenance Bond release. Page 3of 3