Correction Notice Jenna Lane.pdfRivera, Chris
From: Rivera, Chris
Sent: Friday, April 24, 2015 3:11 PM
To: ' LUAYJ @ M E.CO M'
Subject: City of Edmonds, Correction Notice - Jenna Lane 8508 240th St SW
Way,
Below is the list of corrections to be made prior to final approval.
1. Mail boxes need to be installed.
2. Per Olympic View Water & Sewer District, the 6" sewer cleanout nearest 2401h St in the landscape area needs to be
reduced in size and set within a sewer cleanout box. The 6" cleanout at the furthest south along the driveway within the
landscaped area needs to be set within a sewer cleanout box.
3. A letter verifying the approval of the detention system installed has not been received. Per a discussion between a
city inspector and the contractor on duty, a letter of approval from the engineer of record was to be provided for the
installation of 42' of detention vs the site plan approved 42.5'.
If you have any questions, please feel free to contact me.
Thank you,
Chris B. Rivera
Engineering Technkian
City of Edmonds
1215 1h Ave. N.
Edmonds, WA 98020
425.771.0220 ext. 1339
Chris.Rivera@edmondswa.gov