Correction Notice, 9.13.16.pdf
From:Lambert, Jennifer
To:"cllishof@yahoo.com"
Subject:BLD20160673 - 8730 Main St
Date:Wednesday, September 14, 2016 11:18:48 AM
Chris, as discussed, during an inspection of the stormwater facility, the following items need to be
corrected.
nd
The 2 gravelless chamber that was meant to be used for the overflow of the required
stormwater management system was not installed per plans. It appears that if the system
fails it could cause flooding of the garage. Please install an overflow path/system such that
there is no flooding of a building, erosion or downstream sedimentation or slope failure.
Install an observation well for the gravelless chambers. – needs to be verified by City
inspector prior to backfill.
Install landscape fabric on the sides and top of the gravelless chamber. – needs to be
verified by City inspector prior to backfill.
Please let me know if you have any questions.
Jennifer Lambert
Engineering Technician
City of Edmonds
425-771-0220 ext 1321
jennifer.lambert@edmondswa.gov