Loading...
Correction Notice.12.16.14-Reinspect.1.5.15.doc CITY OF EDMONDS CORRECTION NOTICE Date: December 16, 2014, Reinspect January 5, 2015 To: Jeremy Ball, TE Briggs Todd Echelbarger, Property Owner From: JoAnne Zulauf Engineering Technician Subject: Shaw Lane Final Inspection-December 15, 2014 The following list of corrections must be addressed prior to the Engineering Division acceptance of the plat construction. Please schedule a re-inspection once all corrections have been addressed. 1. Done. 2. Runoff from the private road appears to puddle at the northeast corner of the turnaround. All road run off shall be directed to the storm vault per plan. 3. Done. 4. Done. 5. Done. 6. Done. 7. Done. 8. Install mailboxes per plan. 9. Install street address sign. 10. Asphalt ramps were not installed per plan. Please review details on Plan Sheet C11 and reconstruct ramps as needed. Areas adjacent to asphalt ramps shall be properly sloped to match existing grades and not exceed 2:1 slope. Final site restoration shall be completed. This includes restoration of that 11. portion of lot one where the detention vault has been installed, area to the west of the rockery wall, and frontage area behind sidewalk. Final asbuilts including any changes necessary as a result of this 12. correction notice shall be required in paper and electronic form prior to final. 13. Done. 14. Done. City of Edmonds Public Works Department Engineering Division