Loading...
Correction Response 3 - Transportation.docxNovember 14, 2019JoAnne Zulauf, Engineering TechnicianCity of Edmonds Development Services Dept. 121 5th Ave. NEdmonds, WA98020RE:Plan Review Comments for Plan Check #BLD2018-1622 New 192-Unit Multi-Family Building at 23400 Highway 99Engineering Review CorrectionResponse #3 Please find below our responses to your Planning Review Comments dated September 03, 2019. The original text of each item has been included verbatim with any omissions clearly noted. Our responses are included in blue italics. Transportation Engineer Review What type of bike racks are being proposed in the Bike Fitness Amenity room and totalnumber? A cutsheet for a product bike rack has been provided. Please see Fresli Wall Bike Rack. The total number of bike racks provided for the project is 116 stalls. Provide AUTOTURN layout of vehicles coming out parking stalls shown in red box (while pulling out / Attachment #3). This movement looks difficult to complete.  There was no attachment #3 included in the comments we received from the City of Edmonds. Autoturn has been provided for trash truck maneuvering which occurs outside of the building. If required, Autoturn can be provided by email once the design team is notified of the stalls in question. Please feel free to give me a call if you have any questions or need more information to complete your review. Regards, Lucas Branham, AIA Studio Meng Strazzara