Loading...
Correction.11.16.11.pdfZulauf, JoAnne NUMM From: Zulauf, JoAnne Sent: Wednesday, November 16, 2011 1:24 PM To: 'Art Feigt' Subject. Site Clean up Art, I just wanted to reiterate what I talked to Shawn about and what we had talked about regarding the clean up necessary. 1. Put diapers around the, area where the temporary asphalt is bleeding oil down to the catch basin. 2. Put a sediment control sock in the catch basin on 230 east of site. Knock on the door of the motor home-[ think they live in it. 3. Bring in quarry spall (2 - 4"1 for construction entrance. Thickness depends on whether it works or not. 4. Clean Highway 99 and 230". 5. Flatten out the temporary asphalt in sidewalk and in curb so water flow in gutter is not blocked. 6. Cover dirt piles on site. th 7. Clean sidewalks, Highway 99 and 230 If these things are not completed tonight, a stop work or fines may be necessary. Also, I have relayed to Alan Catchipool that the routing of the footing drains to the pipe just west of the detention cb is okay and also that the roof drains will be connected there and cannot go to splash: block. The City will need all this shown on the final as-builts. Thank you! JoAnne Zulauf Engineering Division -c. —1, -elftrn -on ci-s-.M—a- , u s 425-771-0220 x-1326