Loading...
CRA19970090.PDFCA FILE NO. C� t a!�% OCOCtD • Critical Areas '%Luecklist L.a, 1 `-f -; -------------------------------------------------------------- Site Information (soils/topography/hydrology/vegetation) 1. Site Address/Location: C L `�/� 1 �l ��(�5 ' 1�� 1i 6 A)D S 2. Property Tax Account Number:(; 3. Approximate Site Size (acres or square feet): 4. Is this site currently developed? L/yes; no. If yes; how is site developed? MAY 2 2 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. _ Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a ;, horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: �( i� U ; Approx. Depth: 7. Site contains areas of seasonal standing water: L; Approx. Depth: What season(s) of the year? I- 8. Site is in the floodway�_. floodplain of a water course. 9. Site contains a crq..ek or an area where water flows across the grounds surface? Floes are year-round? k 0 Flows are seasonal? (What time of year? ). 10. Site is primarily: forested ; meadow ; shrubs ; mixed urban landscaped (lawn,shrubs etc) _ 11. Obvious wetland is present on site: --- ----- ------------------------ ---------------For City Staff Use Only ------------ ------------------------- ----- 1. Site is Zoned? 1 .T-~'' ." � - / �•- -., 2. SCS mapped soil type(s)? *-PW 3. Wetland inventory or C.A. map indicates wetland present on site? �a 4. Critical Areas inventoryor C.A. iiiap indicates Critical Area on site? 5. Site withiri designated earth subsidence landslidehazard area? Np 6: Site: designated on the Environmentally Sensitive Areas Map?� . . DETERMINATION STUD. Y REQUIRED CONDITIONAL WAIVER . • ;:: . ` . ;WAIVER :Review6d by: / i/lv ^ca chkdoc; Rev 02/11/97 City of Edmonds �4c. 1 89v The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also subsnit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/ Applicant: NaniW .� Str.vA Address City, State, ZIP Phone Si ature V Date Applicant Representative: Name • Street Address City, State, ZIP Phone - i Signature - Date • • 0 City of Edmonds Critical Areas Determination Applicant: Nelson Determination #: CA-97-90 Project Name: Permit Number: Site Location: 18318 Olympic View Drive Property Tax Acct #: 5656-002- 109-0003 Project Description: non -project specific A site inspection has revealed a site developed with a single family residence, and which slopes down steeply to the west from Olympic View Drive to the Burlington Northern Railroad right -of way which runs along the water of Puget Sound. The steep slopes, particular at the western end of the property appear to be are greater than 40% with a vertical elevation change of more than 20 feet. Based on the above findings, it is determined that there is potentially a steep slope critical area on or adjacent to the site. A Critical Areas Study is required to delineate the boundaries of this potential critical areas, the buffers and setbacks. For the steep slopes, a licensed surveyor must create a topographic map of the site which indicates all areas which slope 40% or more and have a vertical gain of 20 feet or more within the 40% slopes. The map must also show the location of the steep slope buffers and setbacks. . If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located on the site, they may submit their proposal to the Planning Department for review. If the Planning Department finds that the proposed development permit will not adversely impact a Critical Area or its buffers, a conditional waiver may be issued on a project by project basis. John Bissell Name. ature June 19, 1997 Date "'v '{Hax. %as �': o ;y,r l fi tlLt 1VV. z ' : Critical ±Areas Checklist —,Ifi x „__ - ife ormafxon soils f Topography/hydrology/vegetation) R N ire d ess tiori tr,, x. 7 roper cco"u'fi Number d Q . '. .• 3.' x >ApproxiniAteSite Size"(acres `or square` feet): ] , ( 00 4. Is this site currently developed? Vyes; no.V If yes; how is site developed? u Av n A 5. Describe the general site topography. Check all that apply. v PERMIT CQVNTER 7� Flat: less than 5-feet elevation change over entire site. _ Rolling: slopes on site, generally less than 15% (a vertical rise of 10-feet over a ' horizontal distance of 66-feet). Hilly: slopes present on site of more than 15°% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: � ; Approx. Depth: 7. Site contains areas of seasonal standing water: _: Approx. Depth: What season(s) of the year? 8. Site is in the floodway�� floodplain of a water course. 9. Site contains a cr ek or an area where water flows across the grounds surface? Flows are year-round? &0 Flows are seasonal? (What time of year? ). 10. Site is primarily: forested ; meadow ;shrubs ; mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: -----------------------For City Staff Use 1. Site is Zoned? L G :5 -- f - v 2. SCS mapped soil type(s)? _P1W C=w'71— S,,WDy Is - 70'� 3. Wetland inventory or C.A. map .indicates wetland present on site? A -pa 4. Critical Areas inventory or C.A. map indicates Critical Area on site? 5. Site within designated earth subsidence landslide hazard area? 6. Site designated on the Environmentally Sensitive Areas Map? /✓O DETERMINATION STUDYREQUIRED CONDITIONAL WAIVER y.. t •:yP$ 4 A+ t kl a f;� '.a 9''�. y w, k $' i' `t - ,. • Of 111011dS 71 q. w4 iM .Y. -NAM �,�y A '�s'-4 , 'Z '2' All ,}/ h #"l, The Critical Areas Checklist contained z,. J',Ls it; and submit it to the Ci I The City:~ f on this f6iffi is o be filled out by,,any will review the checklist, make a person preparing a Development Permit precursory site visit, and make a Application for the City of Edmonds determination of the subsequent steps prior to his/her submittal of a necessary to complete a development development permit to the City. permit application. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, " must fill out the checklist, sign and date With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/ Applicant: Nam Str Address City, State, ZIP Phone Si ature Date Applicant Representative: Name Street Address City, State, ZIP Phone Signature Date • City of Edmonds Critical Areas Determination Applicant: Nelson Determination #: ICA-97-90 Project Name: Permit Number: Site Location: 18318 Olympic View Drive Property Tax Acct #: �-002-009-0003 Project Description: non -project specific A site inspection has revealed a site developed with a single family residence, and which slopes down steeply to the west from Olympic View Drive to the Burlington Northern Railroad right -of way which runs along the water of Puget Sound. The steep slopes, particular at the western end of the property appear to be are greater than 40% with a vertical elevation change of more than 20 feet. Based on the above findings, it is determined that there is potentially a steep slope critical area on or adjacent to the site. A'Critical Areas Study is required to delineate the boundaries of this potential critical areas, the buffers and setbacks. For the steep slopes, a licensed surveyor must create a topographic map of the site which indicates all areas which slope 40% or more and have a vertical gain of 20 feet or more within the 40% slopes. The map must also show the location of the steep slope buffers and setbacks. If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located on the site, they may submit their proposal to the Planning Department for review. If the Planning Department finds that the proposed development permit will not adversely impact a Critical Area or its buffers, a conditional waiver may be issued on a project by project basis. John Bissell Name, Signature June 19, 1997 Date CSt. 189' • • Date: To: Subject: Transmitting CITY OF EDMONDS BARBARAFAHEY 250 5TH AVENUE NORTH • EDMONDS, WA 98020 • (206) 771.0220 • FAX (206) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works • Planning • Parks and Recreation • Engineering Letter of Transmittal June 19, 1997 Elizabeth Nelson Critical Areas Checklist Copy of the completed Critical Areas Checklist For Your Information: XX As you requested: For your. file: XX Comment: This completed Critical Areas Checklist is a site specific determination, not a project specific determination. You must bring in a copy of the completed critical areas checklist with any permit application, or your application will be rejected. Permit applications include Building permits, Conditional Use Permits, Subdivisions, Variances, Applications to the ADB land use applications, or any other development permit applications. Note attachments: Sincerely, Diane M. Cunningham, Planning Secretary • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan s GEOTECHNICAL ENGINEERING STUDY PROPOSED SINGLE FAMILY RESIDENCE 18318 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON G-0907 Prepared for Ms. Elizabeth Nelson c/o Mr. Galen D. Holmquist Paradise Construction, Inc. 23632 Highway 99, F-11 Edmonds, WA 98026 May 28, 1998 Geo Group Northwest, Inc. 13240 NE 20th Street, Suite 12 Bellevue, WA 98005 Phone: (425) 649-8757 RECEIVED SEP 2 9 2000 PERMIT COUNTER r R' Geotechnical Engineers, Geologists Group Northwest, Inc. &Environmental Scientists �ay 28, 1998 G-0907 Ms. Elizabeth Nelson c% Mr. Galen D. Holmquist Paradise Construction, Inc. 23632 Highway 99, F-11 Edmonds, WA 98026 SUBJECT: Geotechnical Engineering Study Proposed Single Family -Residence 18318 Olympic View Drive Edmonds, Washington Dear Mr. Holmquist: We are pleased to submit the report entitled "Geotechnical Engineering Study, Proposed Single Family Residence, 18318 Olympic View Drive, Edmonds, Washington." This report presents the results of our site exploration, engineering analyses and our conclusions and recommendations for steep slope setbacks, earthwork, drainage, foundations and retaining wall design parameters. We understand that the existing one storyhouse with a daylight basement at 18318 Olympic View YmP Drive, Edmonds, WA will be demolished and replaced with a two story house. At the time of this study. We were provided with an approximate footprint for the new house, as shown on Plate 2 - Site Plan. The subject site was explored with three borings on April 7, 1998 in accordance with our proposal dated March' 9, 1998. The subsurface soils encountered in B-1 and B-3 near the east side of the existing house consists of 2.5 to 4.5 feet of medium dense SAND with gravel, below which is a very dense gravelly SAND with pebbles and silt. The soils encountered in boring B-2 on the west side of the existing house consists of 7 feet of loose to medium dense soil which is underlain by dense to very dense gravelly SAND with pebbles and some silt. Groundwater was not encountered during drilling. Based on the results of our study, it is our opinion that the proposed single family residence foundations can be supported on conventional spread footing bearing on the very dense native soil. Due to the existence of loose soils up to 7 feet encountered in B-2, the western half of the proposed 13240 NE 20th Street, Suite 12 • Bellevue, washington 98005 Phone 425/649-8757 9 FAX 425/649-8758 i c 1 May 28, 1998 G-0907 Proposed Single Family Residence Page ii house be supported on a foundation system consisting of augered reinforced concrete piles bearing on the very dense native soil. As an alternative, the entire house could be supported on augered concrete piles. The proposed construction will present a minimal risk of instability to the site during and after the construction, provided the recommendations contained in this report are implemented. If you have any questions, please call. Sincerely, GEO GROUP NORTHWEST, INC. William Chang, PE. Principal y1NM C� .� 20114 Cl'Sron,Al. 1 EXPIRES Z/ 191 ZOVO Geo Group Northwest, Inc. r 7 1 i TABLE OF CONTENTS • JOB NO. G-0907 page 1.0 INTRODUCTION .... I 1.1 Project Description .................................................. 1 1.2 Scope of Services ................................. . 2.0 SITE CONDITIONS 2.1 Surface Condition .................. 2 2.2 Subsurface Conditions ............................ 3 2.3 Groundwater ................................... 3.0 SEISMICITY 3 3.1 Seismic History ................................... 4 3.2 Soil Liquefaction Potential ................................ . 4 4.0 BUILDING SETBACK AND BUFFS .. • • • .... 5.0 SLOPE STABILITY EVALUATION ...... • ........... AND RECOMN ENDATIONS 6.0 CONCLUSIONS 6 .6.1 General .............................................. 6 6.2 Site Preparation and General Earthwork ................. 7 6.3 Spread Footing Foundations ................... • • • . • ::::.. 8 6.4 Augered Concrete Piles ................... : : :::.:: .. 10 6.5 .... Slab -on -Grade Floors . 10 6.6 Permanent Basement & Conventional Retaining Walls ... • • • . .... _ ' ' ' 12 6.7 Excavations and Slopes ....................................................13 6.8 Drainage ........... .....•..••......................... 13 6.8.1 Surface Drainage ..................... • • • • • • ' ' ' 13 6.8.2 Footing and Wall Drains ..................... . ...... ....... 14 6.9 Driveway Area .................................. . 7.0 LIMITATIONS .......................................... . 8.0 ADDITIONAL SERVICES ................................... . Geo Group Northwest, Inc. • • u ILLUSTRATIONS Plate 1 - Vicinity Map Plate 2 - Site Plan Plate 3 - Steep Slope Cross Section Plate 4 - Soil Legend Plate 5 - through 7 Boring Log Plate 8 - Typical Basement Wall Backfill & Drainage Details Plate 9 - Typical Footing Subdrain Geo Group Northwest, Inc. N • GEOTECHNICAL ENGINEERING STUDY PROPOSED SINGLE FAMILY RESIDENCE 18318 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON G-0907 1.0 INTRODUCTION 1.1 Project Description and Understanding The proposed single family residence is located at 18318 Olympic View Drive, Edmonds, Washington, as shown on Plate 1 - Vicinity Map. Based on our site visits and discussions with you and Ms. Elizabeth Nelson, it is our understanding that the existing one story single family residence with a daylight basement at the subject site will be demolished and replaced by a two story residence at the subject site. • We also understand that the City of Edmonds requires a geotechnical study prior to issuing a building permit due to the steep slope and building setback issues. Therefore, the purpose of the geotechnical engineering study is to define the subsurface soil conditions in order to address slope stability, setbacks from steep slopes, foundation support, lateral earth pressures, drainage and earthwork considerations. U At the time of this study, the detail of the new house plan was not available. 1.2 Scope of Services Our scope of the work is outlined in our proposal dated. March 9, 1998, and they are: 1. Perform a subsurface investigation by drilling 2 soil borings, one at the east and one at the west side of the proposed house. The borings will be drilled to a depth of 15 to 30 feet, and soil samples taken every 2.5 feet to detect any zones of weakness in the subsurface soils. The borings will be drilled using a portable drill rig; Geo Group Northwest, Inc. • May 28, 1998 G-0907 Proposed Single Family Residence Page 2 2. Collect soil samples to perform laboratory tests and prepare boring logs; 3. Perform engineering analysis to evaluate slope stability, foundations and retaining wall design requirements; 4. Prepare a geotechnical report with the results of the analysis and prepare conclusions and recommendations for steep slope setbacks, earthwork, drainage, foundations and retaining wall design parameters. 2.0 SITE CONDITIONS 2.1 Surface Condition The subject property is rectangular in shape and approximately 14,000 square feet in size. It is •bordered to the east by Olympic View Drive, to the west by the Puget Sound and by two railway lines at the bottom of a steep slope, to the north and south by single family houses. According to the topographic site plan and our site observation, a steep slope with an average inclination of 46 degrees (103 percent slope) and a topographic relief of 100 feet is situated on the west half of the subject property. The backyard and the proposed building area are relatively flat with an average inclination of 7 degrees (12.5 percent slope). Chain link fences were observed at the top of the steep slope and along both sides of the property line on the north and south. The existing one story single family house with a daylight basement is located on the east half of the property with a detached one car garage at the southeast corner of the property at the street level. 2.2 Subsurface Conditions According to the geologic map for the area, the site is underlain by Transitional Beds (Qtb) which in turn underlain by Olympia Gravel (Qog). Transitional Beds were deposited during the Fraser Glaciation to Pre -Fraser Glaciation, the glacial and non -glacial deposits consist mostly of massive, • thick or thin beds and laminae of medium to dark gray clay, silt, and fine to very fine sand. Geo Group Northwest, Inc. • May 28, 1998 G-0907• Proposed Single Family Residence Page 3 Olympia Gravel was deposited during the Pre -Fraser Glaciation and consist of stratified, fluvial sand and gravel. Gravel is mostly pebble size and is locally oxidized.and weakly cemented so that it stands vertically in fresh exposure. The subsurface investigation was conducted by drilling three exploratory soil borings (B-1, B-2, and B-3) on April 7, 1998. The borings were drilled using portable, low -profile hollow -stem auger equipment to a maximum depth of 13.5 feet below ground surface (bgs). The locations of three soil borings are shown on Plate 2 - Site Plan. We estimated the location of our exploration by using a measuring tape from the existing house. A geotechnical engineer logged the borings and collected soil samples for further examination and testing at our office. The subsurface soils encountered in B-1 and B-3 consist of medium dense brown SAND with gravel and a trace of silt from 2.5 to 4.5 feet below the ground surface. The medium dense SAND was underlain by very dense gravelly SAND with pebbles and silt. Both borings were only drilled to 6.5 feet below the ground surface due to the difficulty to drill through the gravel. • Boring B-2 was drilled on the west side of the house in the lawn area. The soils encountered in boring B-2 consists of 7 feet of loose to medium dense soil underlain by dense to very dense gravelly SAND with pebbles and some silt. The soils encountered in the borings at the site match those for the Olympia Gravel (Qog) on the geologic map. 2.3 Groundwater Groundwater was not encountered during drilling. However, the ground water table can fluctuate seasonally, depending on rainfall, surface runoff and other factors. 3.0 SEISMICITY 3.1 Seismic History • The project site is located on a bluff facing the Puget Sound and about 10 miles north of Seattle. Geo Group Northwest, Inc. 0 � 0 *May 28, 1998 G-0907 Proposed Single Family Residence Page 4 The greater Seattle area has experienced a number of small to moderate earthquakes and occasionally strong shocks during the brief 155-year historical record in the Pacific Northwest. The major earthquakes in the region are believed to be associated with deep-seated plate tectonic activity. Major faults within the region have not been active in the Holocene Age (geologic period dating since the last glacial retreat 14,000 years ago), consequently, they are not known to be associated with historical seismicity. Historical records for the region indicate that the Olympia earthquake of April 13, 1949, with a Richter magnitude of 7.1, produced ground -shaking of intensity VIH near its epicenter; and the Seattle -Tacoma earthquake of April 29, 1965, with a Richter magnitude of 6.5, produced a ground -shaking of intensity IV to VIII on the Modified Mercalli Scale near its epicenter. This level of ground -shaking is estimated to be the maximum that has occurred in the region during the 155 years of historic record. 3.2 Soil Liquefaction Potential • Although there may be subsurface variations from point to point, we expect the native soil Y underlying the subject site consists of dense gravelly SAND. Groundwater was not encountered during subsurface investigation. Due to the dense nature of the native soil, it is our opinion that the subsurface soils at the site are not susceptible to liquefaction. 4.0 BUILDING SETBACK & BUFFERS The City of Edmonds, Edmonds Community Development Code (ECDC), Section 20.15B, dated August, 1996, sets restrictions on the development of sites with steep slopes (40 percent or more). The ECDC 20.15B requires a total building setback of 65 feet from the top of a steep slope which includes 50 feet of buffer setback and 15 feet of building setback. The total building setback may be reduced to 25 feet (10 foot nondisturbance vegetative buffer plus 15 foot building setback) if there is a special geotechnical study. Smaller setbacks, or construction on steep slopes requires an exception from a public hearing pursuant to ECDC 20.1000.010 from City of Edmonds. • Based on the review of the site plan provided to us, the current plans place the proposed two- Geo Group Northwest, Inc. • • I G-0907 May , Proposed Single Family Residence Page 5 story house at least 25 feet east of top of the steep slope which is in agreement with our recommended 25 foot total building setback (10 foot buffer plus 15 foot building setback), as shown in Plate 2 - Site Plan. For the purposes of this report, provided that the recommendations herein are adhered to, it is our opinion that the proposed single family house can be located closer than the required 65 feet from the top of the steep slope. Building near the top of any steeply sloped hillside always has, some inherent risk. However, the risk can be minimized by incorporating a reasonable building setback from the top of the slope, preventing concentrated surface water runoff from eroding the slope, minimizing disturbance to the slope, and maintaining the native vegetation both on the slope and above the slope. To mitigate landslide and erosion hazards, we recommend incorporating all these items into the design of the subject project. 5.0 SLOPE STABILITY EVALUATION The subject lot is considered to be a geologic hazard area due to the existence of a greater than 40 percent steep slope with a topographic relief of 100 feet as shown in Plate 3 - Steep Slope Cross Section. Based on the subsurface investigation, the undisturbed native soil on the top of the steep slope is dense gravelly SAND with some pebbles and silt and in our opinion they are not susceptible to deep seated sliding. However, the surficial loose soil or fill may be susceptible to erosion on steep slopes, especially where vegetation is removed. It is our professional opinion that the subject lot is currently stable and will be stable after the subject construction. The proposed single family house will present a minimal risk of instability to the adjacent property during or after the construction, provided the recommendations contained herein are implemented. Geo Group Northwest, Inc. 1..' .1 0 9 I• May 28, 1998 G-0907 Proposed Single Family Residence Page 6 6.0 CONCLUSIONS AND RECOMMENDATIONS 6.1 General Based on the results of our study, it is our professional opinion that the site is geotechnically suitable for the development of the proposed single family house, and that the proposed house can be supported on conventional spread footing bearing on the very dense native soil. Due to the 7 feet of loose soils encountered in B-2, the western half of the proposed house should be supported on a foundation system consisting of augered reinforced concrete piles bearing on the dense native soils. As an alternative, the entire house could be supported on.augered concrete piles. Specific recommendations regarding the site development are presented in the following sections. 6.2 Site Preparation and General Earthwork • The proposed structure area should be stripped and cleared of surface vegetation and debris from the demolition of the existing house. Disturbance to the site should be kept to a minimum to prevent erosion. Silt fences should be installed around areas disturbed by construction activity to prevent sediment -laden surface runoff from being discharged off -site. All structural fill material used to achieve design site elevations below slabs, sidewalks, driveways, etc. should meet the requirements for structural fill. During wet weather, material to be used as structural fill should have the following specifications: 1. Be free draining, granular material, which contains no more than five (5) percent fines (silt and clay -size particles passing the No. 200 mesh sieve); 2. Be free of organic and other deleterious substances; 3. Have a maximum size of three (3) inches. All fill material should be placed at or near the optimum moisture content. The optimum moisture 4 content is the water content in soil that enables the soil to be compacted to the highest dry density Geo Group Northwest, Inc. May 28, 1998 G-0907 Proposed Single Family Residence Page 7 for a given compaction effort. Due to its silt content, some of the existing loose fill soils are -considered to be moisture sensitive and should not be used as fill material during wet weather conditions. During dry weather, any compactable non -organic soil meeting the above maximum size criteria may be used as structural fill, provided the material is near the optimum moisture content for compaction purposes. Structural fill should be placed in thin horizontal lifts not exceeding ten inches in loose thickness. Structural fill under driveways, patios and sidewalks should be compacted to at least 90 percent of maximum density, with the exception of the upper twelve (12) inches. • The top twelve (12) inches should be compacted to at least 95 percent maximum density, as determined by ASTM Test Designation D-1557-91 (Modified Proctor). We recommend that Geo Group Northwest, Inc. be retained to evaluate the suitability of structural fill material and to monitor the compaction requirement during construction for quality assurance of the earthwork. * 6.3 Spread Footing Foundations It is our opinion that the eastern half of the house can be supported by conventional spread footings bearing on the dense undisturbed native soils or compacted structural fill bearing on the dense undisturbed native soils. The conventional spread footing foundations can be designed as follows: - Allowable bearing pressure, including all dead and live loads on undisturbed dense gravelly sand = 2,000 psf on compacted structural fill = 2,000 psf - Minimum depth to bottom of perimeter footing below adjacent final exterior grade = 18 inches - Minimum depth to bottom of interior footings below top of floor slab = 18 inches Geo Group Northwest, Inc. May 28, 1998 G-0907 Proposed Single Family Residence Page 8 - Minimum width of wall footings = 16 inches - Minimum lateral dimension of column footings = 24 inches -.Estimated post -construction settlement = 1/4 inch - Estimated post -construction differential settlement; across building width = 1/4 inch A one-third increase in the above allowable bearing pressures can be used when considering short- term transitory wind or seismic loads. Lateral loads can also be resisted by friction between the foundation and the supporting compacted fill subgrade or by passive earth pressure acting on the buried portions of the foundations. For the latter, the foundations must be poured "neat" against the existing undisturbed soil or backfilled with a compacted fill meeting the requirements of structural fill. Structural fill requirements can be found in Section 6.2 - Site Preparation and General Earthwork. It is our professional opinion that the following parameters can be used: - Passive pressure - Coefficient of friction 6.4 Augered Concrete Piles = 300 pcf equivalent fluid weight = 0.30 We recommend that the western half of the proposed house be supported on a foundation system consisting of augered concrete piles. This recommendation is based on the loose soil conditions encountered in Boring B-2 down to a depth of 7 feet below the ground surface. The pile foundation should penetrate through the loose to. medium dense zones, with a minimum embedment of five feet into the very dense gravelly SAND below. We estimate that the total length of each pile to be about 12 feet below the ground surface. We recommend that the diameter of the augered hole have a minimum diameter of 14 inches. For augered reinforced concrete piles of 14 and 16 inches in diameter embedded into very dense Geo Group Northwest, Inc. May 28, 1998 G-0907 Proposed Single Family Residence Page 9 gravelly SAND with a minimum of 5 feet embedment, the following allowable bearing capacities may be used: Pile Diameter Inches(Feet) Pile Embedment Allowable Bearing Tons Allowable Uplift Tons 14 5 10 5 16 5 12 6 Note: Pile Embedment Length based on the embedment depth below the top of the very. dense gravelly SAND. No reduction in pile capacities is required if the pile spacing is at least. three times the pile diameter. A one-third increase in the above allowable pile capacities can be used when considering short-term transitory wind or seismic loads. Lateral loads can also be resisted by using battered piles or by the passive earth pressures acting on grade beams. To fully mobilize the passive pressure resistance, the grade beams must be poured "neat" against compacted fill. Our recommended allowable passive soil pressure for lateral resistance is 300 pcf equivalent fluid weight. A coefficient of friction of 0.30 may be used between the subgrade and the grade beam. We estimate that the maximum total post -construction settlement should be one -quarter (1/4) inch or less, and the differential settlement across the building width should be one -quarter (1/4) inch or less. The performance of piles depends on how and to what bearing stratum the piles are installed. Since a completed pile in the ground cannot be observed, it is critical that judgement and experience be used as a basis for determining the embedment length and acceptability of a pile. Therefore, we recommend that Geo Group Northwest, Inc. be retained to monitor the pile installation operation, collect and interpret installation data and verify suitable bearing stratum. We also suggest that the contractor's equipment and installation procedure be reviewed by Geo Group Northwest, Inc. prior to pile installation to help mitigate problems which may delay work progress. A structural engineer should be retained to design the reinforced augered concrete Geo Group Northwest, Inc. May 28, 1998 G-0901 • Proposed Single Family Residence Page 10 piles. 6.5 Slab -on -Grade Floors Based on the encountered site conditions, we°anticipate that the house will have supported floors, if slab on -grade floors are used, the slab -on -grade floors may bear on the dense undisturbed soil below the site, or on compacted structural fill; placed above the dense natural soils; compacted as specified in Section 6.2 - Site Preparation and General Earthwork of this report. All loose soil should be removed, or replaced with engineered structural fill. To avoid moisture build-up on the subgrade, slab -on -grade floors should be placed on a capillary break, which is in turn placed on the prepared subgrade. The capillary break can consist of a minimum of six (6) inches thick layer of free -draining gravel containing no more than five (5) percent finer than No. 4 sieve. A vapor barrier, such as a 6-mil plastic membrane, is recommended to be placed over the capillary break beneath the slab to reduce water vapor • transmission through the slab. Two to four inches of sand may be placed over the barrier membrane for protection during construction. In preparing the subgrade, native soils disturbed by construction activity should either be recompacted, or excavated and replaced with compacted, well -draining, structural fill or crushed rock. Prior to placing the capillary break, the barrier membrane and the concrete for slabs -on - grade, we recommend the subgrade be proof; rolled with a piece of heavy construction equipment, such as a fully loaded dump truck. Any soft spots or disturbed areas thus detected should be recompacted or excavated, replaced and compacted as described above. If groundwater seepage is encountered in the foundation slab area, we recommend that a geotextile fabric, such as Mirafi 500X, or equivalent, be placed on the wet subgrade, above which a minimum six (6) inchlayer of one and a half (1.5) inch minus gravel, or 2-inch crushed rock, no fines, be used as a capillary break. This will also eliminate the need for the 6-mil plastic membrane. 6.6 Permanent Basement and Conventional Retaining Walls • Permanent basement walls restrained horizontally on top are considered unyielding and should be Geo Group Northwest, Inc. May 28, 1998 G-0907 Proposed Single Family Residence - Page 11 designed for a lateral soil pressure under the at -rest condition; while conventional reinforced concrete walls free to rotate on top should be designed for a active lateral soil pressure. Active Earth Pressure Conventional reinforced concrete walls that are designed to yield an amount equal to 0.002 times the wall height, should be designed to resist the lateral earth pressure imposed by an equivalent fluid with a unit weight of: • 35 pcf for level backfill behind yielding retaining walls; At -Rest Earth Pressure Walls supported horizontally by floor slabs are considered unyielding and should be designed for lateral soil pressure under the at -rest condition. The design lateral soil pressure should have an equivalent fluid pressure of. • 60 pcf for level ground behind permanent unyielding retaining walls; Passive Earth Pressure and Base Friction The available passive earth pressure that can be mobilized to resist lateral forces may be assumed to be equal to 300 pcf equivalent fluid weight for both undisturbed soils and engineered structural backfill. The base friction that can be generated between concrete and undisturbed bearing soils or engineered structural backfill may be based on an assumed 0.30 friction coefficient. We recommend that a vertical drain mat, Miradrain 6000 or equivalent, be used to facilitate drainage behind permanent concrete basement or conventional retaining walls. The drain mat core is placed against the basement wall with the filter fabric side facing the backfill. The drain mat extends from the finished surface grade, down to the footing drain pipe. A minimum of 18 inches of clean, free -draining, washed rock, crushed rock, or pea gravel should be placed in the bottom of the footing trench. With the above exceptions, perimeter foundation drainage recommendations and installation procedures are in the - Footing and Wall Drains section of this report. Please also refer to Plate 8 - Typical Basement Wall Backfill and Drainage Details. If vertical drain mats are incorporated into the design, we recommend using the existing native Geo Group Northwest, Inc. M May 28, 1998 G-0907 Proposed Single Family Residence Page 12 soils as structural backfill behind the walls, provided the native material can achieve the specified compaction. If the native, soil cannot achieve the specified compaction, then we recommend placing a free draining granular backfill material. Alternatively, to prevent buildup of hydrostatic pressure behind permanent concrete basement or conventional retaining walls, a granular, free draining structural backfill material can be placed within a horizontal distance of 18 inches of the wall, in place of vertical drain mats. We recommend using a clean, granular, free -draining, structural fill material; free of organic or other deleterious substances, such as pea gravel, or washed rock, containing no more than five percent fines passing the No. 200 sieve based on the fraction of material passing the No. 4 sieve. The free -draining granular material should surround the wall subdrain system as described in the footing drain section of this report. The top twelve (12) inches of the fill should consist of compacted and relatively impermeable soil. This cap material can be separated from the underlying more granular drainage material by a layer of building paper or visqueen. The surface should be sloped to drain away from the building wall. Alternatively; the surface can be sealed with asphalt or concrete paving. Where backfill material behind permanent concrete basement or conventional retaining walls is not supporting slabs, or structural loads, the backfill should be compacted to 90 percent of the maximum dry density determined by ASTM D 1557-91 (Modified Proctor Method). The top 12- inches should be compacted to 95 percent of the maximum dry density. The backfill in areas adjacent to basement or conventional retaining walls should be compacted with hand held equipment or a hoepack. Heavy compacting machines.should not be allowed within a horizontal distance to the wall equivalent to one half the wall height, unless the walls are designed with the added surcharge. 6.7 Excavations and Slopes Under no circumstances should temporary excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts greater than four feet in height should be sloped at an inclination no steeper than 1H:1 V (Horizontal Vertical). A geotechnical engineer or geologist should determine the type of soil encountered in the excavation and determine the safe inclination of the excavation. Geo Group Northwest, Inc. May 28, 1998 G-0967 Proposed Single Family Residence Page 13 Surface runoff should not be allowed to flow uncontrolled over the top of slopes into the excavated area. During wet weather exposed cut slopes should be covered with plastic sheets during construction to minimize erosion. To improve the surficial stability of the slope especially when doing excavation, we recommend that the existing slope vegetation be maintained. Waste debris, such as lawn clippings and tree limbs should not be discarded on the slope. All permanently exposed slopes should be planted with an appropriate species of vegetation to reduce erosion and improve the stability of the surficial layer of soil. Geo Group Northwest, Inc. should be consulted if changes to the above plans are contemplated. 6.8 Drainage 6.8.1 Surface Drainage • The finished ground of the site should be graded such that surface water is directed away from the structure and off the site. Water should not be allowed to stand in any area where footings, slabs, parking lot or pavements are to be constructed. During construction, loose surfaces should be sealed at night by compacting the surface to reduce the potential for moisture infiltration into the soils. Final site grades should allow drainage away from buildings. We suggest that the ground be sloped at a gradient of three (3) percent for a distance of at least ten feet away from buildings except in areas that are to be paved. • 6.8.2 Footing and Wall Drains We recommend that drains be installed around the foundation perimeters and behind concrete retaining walls. The drains should consist of a four (4) inch minimum diameter, perforated or slotted, rigid drain pipe laid at or just below the invert of the footing with a gradient sufficient to generate flow (see, Plate 9 - Typical Footing Subdrain). The drain line should be bedded on, surrounded by, and covered with a free -draining rock, pea gravel, or other free -draining granular material. Geo Group Northwest, Inc. 0 May 28, 1998 G-09Q7 Proposed Single Family Residence Page 14 Once the drains are installed, the excavation behind foundation walls should be backfilled with a compacted structural fill material. For structural backfill criteria behind walls, please refer to Section 6.5 - Permanent Basement and Conventional Retaining Walls. The surface should be sloped to drain away from the building wall or sealed with asphalt or concrete paving. Under no circumstances should roof downspout drain lines be connected directly to the footing drain system. All roof downspouts must be separately tightlined to discharge into the storm water collection system. We recommend that sufficient cleanouts be installed at strategic locations to allow for periodic maintenance of the footing drains and downspout tightline systems. 6.9 Driveway Area It is anticipated that the driveway area is to support passenger cars and light trucks only, we recommend the pavement design to consist of the following: Two inches of Asphalt Concrete (AC) over four inches of Crushed Rock base (CRB) material, The adequacy of site pavements is strictly related to the condition of the underlying subgrade. If this is inadequate, no matter what pavement section is constructed, settlement or movement of the subgrade will be reflected up through the paving. In order to avoid this situation, we recommend the subgrade be treated and prepared as described in Section 6.2 - Site Preparation and General Earthwork of this report. At least the top twelve (12) inches of the subgrade should be compacted to 95 percent of the maximum dry density (per ASTM D-1557-91). It is possible that some localized areas of soft, wet or unstable subgrade may still exist after this process. If so, they may require overexcavation of the unsuitable materials and their replacement with a compacted structural fill or a crushed rock. 7.0 LIMITATIONS This project has been prepared for the specific application tothis site for the exclusive use of Ms. Elizabeth Nelson, and her representatives. We recommend that this report in its entirety be included in the project contract documents for use by the contractor. Geo Group Northwest, Inc. '• May 28, 1998 G-0907 Proposed Single Family Residence Page 15 iOur findings, conclusions and recommendations stated herein are based on site observations, subsurface conditions encountered in our field exploration, our experience and engineering judgement. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied is made. Soil and groundwater conditions described herein may vary from those actually encountered during construction. The nature and extent of such variations may not become evident until construction. If variations appear then, Geo Group Northwest, Inc. should be requested to re- evaluate the recommendations in this report and to verify or modify them in writing prior to proceeding with construction. 8.0 ADDITIONAL SERVICES R We recommend that Geo Group Northwest, Inc. be retained to perform a general review of the final design. This is to verify that our recommendations included herein are properly interpreted and implemented in the design and in the construction documents. We also recommend that Geo Group Northwest, Inc. be retained to provide monitoring and testing services for geotechnically related work during construction. This is to observe compliance with the design concepts, specifications or recommendations and to allow design changes in the event subsurface conditions differ from those anticipated prior to and during the construction. Geo Group Northwest, Inc. t May 28, 1998 G-0907 . Proposed Single Family Residence Page 16 Respectfully submitted. GEO GROUP NORTHWEST, INC. ti1P c M4111q wAS Linjung "Steve" Hou, P.E. a4 �'o� C Geotechnical Engineer 20114� ;� _ S10NAL E%PIHEE 21 i9� 2p William Chang, P.E. Principal Geo Group Northwest, Inc. Group Northwest, Inc. Geotechnical Engineers, Geologists, 3 Environmental Scientists VICINITY MAP ELIZABETH NELSON RESIDENCE 18318 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON 'Sh Q) 6 60 ��,°5(TYP):: OO.F.P CHAIN LINK FENCE, ItK Co Aj C, PROPOSED NEW H"USE' rV o o Q EXIST. o /0 A? SFR EXIST. Q) Q) 4- GAR. 0 < 70 4Crj 0 EWE (0 / e-z 0 01 00 AP "7 0 X[STING Q) (S &J S LEGEND B-1 11-0 indicates the approximate location of.borings GAR. cross section A -A' approximate new house footprint (! roupNorthwestInc. ELG1831 Site plan was adapted from Dunaway Surveying. Geotechnical EngineersGeologists, & ED ZOP Environmental Scientists SCALE 20. DATE 5/6/98 MADE SH C11KD WC LEGEND OF A CLASSIFICATION AND PENEATION TEST 1 1 UNIFIED SOIL"CLASSIFICATION SYSTEM (USCS) _ LABORATORY GROUP MAJOR DIVISION TYPICAL DESCRIPTION CLASSIFICATION SYMBOL CRITERIA WELL GRADED GRAVELS, GRAVEL -SAND Cu = (D60I D10) greater than 4 CLEAN GW MIXTURE, LITTLE OR NO FINES DETERMINE Cc = (D30D30I D101 D60) between i and 3 GRAVELS PERCENTAGES GP POORLY GRADED GRAVELS, AND GRAVEL -SAND POORLY NOT MEETING ABOVE REQUIREMENTS GRAVELS Pitt$e or no OF GRAVEL AND fines) LITTLE OR NO FINES SAND FROM (More Than Half GRAIN SIZE ATTER13ERG LIMITS BELOW Coarse Grains DISTRIBUTION COARSE Larger Than No. DIRTY GM SILTY GRAVELS, GRAVEL -SAND -SILT MIXTURES CURVE. CONTENT 'A' LINE. GRAINED 4 Sieve) GRAVELS OF FINES or P.I. LESS THAN-4 ATTERBERG LIMITS ABOVE SOILS COARSE GRAINED EXCEEDS (with some GC CLAYEY GRAVELS, GRAVELSAND-CL.AY SOILS ARE 12% "A"LINE. fines) MIXTURES CLASSIFIED AS or P.I. MORE THAN 7 FOLLOWS: WELL GRADED SANDS, GRAVELLY SANDS, Cu = (D60 / D10) greater than 6 More Than Half CLEAN SW LITTLE OR NO FINES < 5% Fine Grained: Cc = (D30. 0301010 / D60) between 1 and 3 by Weight SANDS GW, GP, SW, SP SP POORLY GRADED SANDS, GRAVELLY SANDS, NOT MEETING ABOVE REQUIREMENTS Larger Than No. 20D Sieve SANDS pittle a no > 12% Fine (More Than Hall fines) LITTLE OR NO FINES Grained: Coarse Grains GM, GC, SM. SC, ATTERBERG LIMITS BELOW Smaller Than OIRTY SM SILTY SANDS, SAND -SILT MIXTURES CONTENT •A• LINE No. 4 Sieve) SANDS 5 to Fine OF FINES with P.I. LESS THAN 4 Grained: use dual : symbols. EXCEEDS ATTERBERG LIMITS ABOVE (with someSOe SC CLAYEY SANDS, SAND -CLAY MIXTURES 12% 'A' LINE fines) with P.I. MORE THAN 7 SILTS Liquid Limit INORGANIC SILTS, ROCK FLOUR, SANDY SILTS (Below A•Line ML OF SLIGHT PLASTICITY 60 on Plasticity PLASTICITY CHART A•Line Liquid Limit INORGANIC SILTS, MICACEOUS OR Chart, Negligible FOR SOIL PASSING FINE-GRAINED Caganic) > 50% MH DIATOMACEOUS. FINE SANDY OR SILTY SOIL I NO, 40 SIEVE SOILS e ( ...- C or OL i INORGANIC CLAYS OF LOW PLASTICITY. X -b i CLAYS l Liquid Limit ' CL GRAVELLY, SANDY, OR SILTY CLAYS. CLEAN lU O I • (Above A•Line on < 30% ' CLAYS Z Plasticty Chart, F — ---- More Than Hall Negligible I Liquid Limit I CH INORGANIC CLAYS OF HIGH PLASTICITY, FAT I L or L Organic) > 509b CLAYS U t by Weight y 20 —7 Smaller Than QQ No 200 Sieve ORGANIC Liquid Limit ORGANIC SILTS AND ORGANIC SILTY CLAYS OF aJ H or DH SILTS 8 CLAYS < 50% OL LOW PLASTICITY I 10 I ' —t-- (Below A•Line 4 OL r on Plasticity Liquid Limit OH ORGANIC CLAYS OF HIGH PLASTICITY I 0 Chart) , 50% 0 10 10 30 40 50 60 70 80 90 100 LIQUID LIMIT (%) HIGHLY ORGANIC SOILS Pt PEAT AND OTHER HIGHLY ORGANIC SOILS SOIL PARTICLE SIZE GENERAL GUIDANCE OF SOIL ENGINEERING PROPERTIES FROM STANDARD PENETRATION TEST (SPT) U.S. STANDARD SIEVE Passing Retained SANDY SOILS SILTY & CLAYEY SOILS SleVe Size Sieve Size Blow Relative Friction Blow Unconfined FRACTION (mm) (MM) Counts N Density % Angle 0, degree Description Counts N Strength qu, tsf Description SILT I CLAY M200 0.075 : SAND 0. 4 0.15 Very Loose < 2 < 0.25 Very soft FINE 040 0.425 0200 0.075 4-10 15.35 26. 30 Loose 2.4 0.25.0 50 Soft MEDIUM 010 0 940 0.425 10. 30 35.65 28. 35 Medium Dense 4.8 0.50. 1.00 Medium Stiff COURSE W 4.75 010 2 30. 50 > 50 65.85 85. 100 35.42 38 - 48 Dense Very Dense 8 - 15 15 - 30 1.00.2.00 2.00. 4.00 Stiff Very Stiff GRAVEL I FINE 19 1K4 4.75 > 30 > 4.00 Hard Group Northwest, Inc. COURSE 78 19 COBBLES 76mmto203mm - BOULDERS > 203 mm Geotechnical Engineers, Geologists, & Environmental Scientists ROCK > 78 mm FRAGMENTS 13240 NE 20th Street, Suite 12 Bellevue. WA 98005 Phone (206) 649.8757 Fax (206) 649-8758 PLATE 4 ROCK >0 76 cubic meter in volume BO ING NO. B-1 ELogged SH Date Drilled: 4/7/98 Surface Elev. 189 feetDepth SAMPI� SPT Blows SPT (f) Blows Water Content Other Tests b Soil Description per per % Comments Type No. 6-inches foot Brown SAND with gravel and trace of silt, medium dense, moist T S 1 2,5,7 12 7.8 SM Dritl rig stuck ® 2.5 feet due to rock, added water in hole to ease drilling 1 T 1 S2 10,11,35 .46 5.9 Brown/gray gravelly SAND with pebble and trace of silt, very dense, damp 5 SP/ to moist SM S3 30,32,33 65 5.9 10 Note: Total depth = 6.5 feet. There was no water seepage encountered. 15 20 25 30 35 40 Using 6"0.D portable rig, standard 140 lbs Ihammer and 2"O.D. split- sampler BORING LOG Group Northwest, Inc. EL17ABETH NELSON RESIDENCE �� 18318 OLYMPIC VEIW DRIVE --0, Geotechnical Engineers, Geologists, a EDMONDS, WASHINGTON Environmental Scientists DATE 4/22/98 1 JOB NO. G-0907 PLATE 5 BOMNG NO. B-2 gged By: SH Date Drilled: 4n 1998 ih USCS Soil Description 1 SM Brown SAND with some sih and gravel, loose, moist (Fill) Drilling gets slower at 4.5 feet 5 SM/ Light brown SAND with some gravel and sih, medium dense, moist SP at 7 to 8 feet, drill rig gets stuck, added water to ease drilling ---- --------------------------------------------- Sp/ Brown gravelly SAND with pebble and trace of sift, dense to very dense, 10 sM moist 15 Note: Total depth = 13.5 feet. There was no water seepage encountered. 25 30 35 40 Using 6"0.D portable rig, standard 140 lbs jtatntner and 2"O.D. split- sampler roup Northwest, Inc. Geotechnical Engineers, Geologists, 3 Environmental Scientists DATE Surface Elev. 180 feet +/- SPT SPT (N) Water SAMPLE Blows Blows Content Other Tests 3 per 6-inches per foot % Comments Type No. ISi 11.9 IS2 1,2,1 3 16.0 IS3 3,4,10 14 8.7 IS4 15,21,24 45 11.5 I35 13,13,17 30 16.4 IS6 15,50/3" 50/3" 12.6 BORING LOG ELIZABETH NELSON RESIDENCE 18318 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON 4/22/98 1 JOB NO. G-0907 PLATE 6 ft. 5 10 15 25 30 35 40 BORING NO. B-3 d By: SH Date Drilled: 4/7/98 Surface Elev. 189 feet uses Soil Description SAMPLE SPT Blows SPT N Blows Water Content Other Tests d per per % Comments Type No. 6. inches foot IS1 4,7,5 12 no SP, Brown SAND with gravel and trace of silt, medium dense, moist recover to drill ®2 feet due to rock. ISM S2 9,9,11 20 9.9 ._ SP/ _.- _.. _... — -_.. -....-_....,..... — .......... — — . _ . Light brown gravelly SAND with pebble and trace of sih, very dense, damp SM to moist I S3 14,17,39 56 11.1 Note: Total depth = 6.5 feet. There was no water seepage encountered. 6"0.D portable rig, standard 140 lbs :r and 2"O.D. split- sampler (� roup o wes , nc. �- Geotechnical Engineers, Geologists, 3 Environmental Scientists BORING LOG ELIZABETH NELSON RESIDENCE 18318 OLYMPIC VEIW DRIVE EDMONDS, WASHINGTON DATE 4/22/99 JOB NO. G-0907 PLATE 7 e Relative Impermeable Free draining material, (Washed rock or Crushed rock) Geotextile (mirafr 140 NL: or equal) 4 or 6 inch diameter slotted or perforated PVC pipe Basement Wall Slope to drain ' Vertical Drain Mat (Miradrain 6000 or equal) COMPACTED ONSTPB BACKFLLL MATERIAL (IF USABLE) - .: i .... xoorvc: . NOT TO SCALE NOTES: 1.) Do not replace rigid PVC pipe with flexible corrugated plastic pipe. 2.) Perforated or slotted PVC pipe should be tight jointed and laid with perforations or slots down, with positive gradient to discharge. 3.) Do not connect roof downspout drains into the footing drain lines. 4.) Backfill should be compacted to 90% of maximum dry density based on Modified Proctor. The top one foot should be compacted to 95% of maximum dry density if backfill is to support sidewalks, driveway, etc. Group Northwest, Inc. Geotechnical Engineers, Geologists, d Environmental Scientists TYPICAL BASEMENT WALL BACKFILL AND DRAINAGE DETAIL SCALE NONE I DATE 5/7/98 I MADE SH I CHKD WC I JOB NO. G-907 I PLATE 8 BACKFILL WTTH COMPACTED NATIVE, RELATIVE IMPERMEABLE SOIL GEOTEXTILE FILTER FABRIC, MU AFI 140 NL, AMOCO 4535, 4545, OR EQUAL FREE DRAINING BACKFILL CONSISTING OF WASHED ROCK OR CRUSHED ROCK MINIMUM 4 INCH DIAMETER PERFORATED PVC PIPE WTTH POSITIVE GRADIENT TO DISCHARGE NOT TO SCALE NOTES: 1.) Do not replace rigid PVC pipe with flexible corrugated plastic pipe. 2.) Perforated 'or slotted PVC pipe should be tight jointed and laid with perforations or slots down, with positive gradient to discharge. 3.) Do not connect roof downspout drains into the footing drain lines. TYPICAL FOOTING DRAIN Group Northwest, Inc. Geolechnical Engineers. Geologists, d Environmental Scientists SCALE NONE I DATE 5/7/98 I MADE SH I CHKD WC I JOB NO. G-0907 I PLATE 9