Loading...
CRA19980122�Y :.,.1; , kkoNj qqkolz 2 Critical Areas Checklist _-------------------------------------------------------------- Site Information (soils/topogrraphy//hydrology/vegetation) 1. Site Address/Location: -1 3�zz l661 lM�� C (� 1 re �c�� 2. Property Tax Account Number: i J Vk� 0V 6) �1 3. Approximate Site Size (acres or square feet): -Z3 eL L" S 4. Is this site currently developed? _yes; no. If yes; how is site developed? t40 m `C 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. _ Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: !-� d ; Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? b Flows are seasonal? (What time of year? ). 10. Site is primarily: forested ; meadow ; shrubs ; mixed urban landscaped (lawn,shrubs etc) _I_S 11. Obvious wetland is present on site: _ (�-1 D 5;. Site within designated:earth subsidence landslide. hazard area? 6,."­. Site des}giatecl on the >ynviioiirnentalI Sensitive :Areas Nlap? DETERMINATION ^m_ ehk.doe; Rev 10/03/97 o 6,z C)0-4E)7- 300Z City of Edmonds QV- cc� sS CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: GuAnw be Name Street Address City State Zip Telephone Signature Applicant Representative: Name , o2-i l6L) ?L S(, Street Address City State Zip 2/2 s - 7 q z - / y,6 `-{ Telephone S igna e . Date Date (over) c:reception\jana\cacl.doc City of Edmonds Critical Areas Determination Applicant: Johansen Construction I Determination #: CA-98-122 Project Name: Permit Number: Site Location: 9309 Olympic View Drive Property Tax Acct #: 1327-031-022-00-03 Project Description: Non -Project Specific Determination: Study Required: During review and inspection of the subject site on May 20, 1998, it was found that the site contains a Steep Slope Hazard Area along the western portion of the property pursuant to Chapter 20.15B of the Edmonds Community Development Code (ECDC). Based on these findings, prior to submission of any development permit, the requirements of ECDC 20.15B must be satisfied by completing the following: Before any permit application may be submitted, submit to the Planning Department a topographic survey prepared by a Licensed Land Surveyor delineating Steep Slope Hazard Areas. Any slope of 40% or more with at least 20 feet of rise will be classified as a Steep Slope Hazard Area. A 50 foot buffer is required from both the top and toe of the slope. A 15 foot building setback is required from the 50 foot buffer. For development of any kind which is proposed within the critical area, 50 foot buffer or 15 foot buffer setback, it must be shown that the development will not adversely impact the Critical Area or its buffer, by doing one or possibly both of the following depending on the outcome of the study: 1. For development proposals which will occur within the 50 foot buffer, but no closer than 25 feet from the top or toe or the slope, the 50 foot buffer requirement may be reduced to 10 feet if a study is completed by a licensed geologist or geotechnical engineer which clearly demonstrates that the proposed buffer alteration will have no adverse impact upon the site, the public or any private party. All Critical Area Studies, except those done by a licensed geotechnical engineer, must be completed under a three party contract where the City hires the professional required, and the applicant pays for the study (pursuant to ECDC Section 20.15B.150). 2. If development must occur within the critical area, buffer, and/or buffer setback, and is not identified as an exception per ECDC Chapter 20.15B, a Reasonable Use Exception and Variance must be obtained pursuant to ECDC 20.15B.170A and 20.15B.040C). All proposed development of the subject lot must meet the requirements of Chapter 19.05 of the Edmonds Community Development Code. If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located on the site, they may submit their proposal to the Planning Department for review. If the Planning Department finds that the proposed development permit will not adversely impact a Critical Areas or its buffers, a conditional waiver may be issued on a project by project basis. Name Signature Date MEMORANDUM TO: Pc-98-144 FROM: Jason Tourtellot, Code Enforcement Specialist RE: 9309 Olympic View Drive DATE: ' 5/22/98 The Critical Area Checklist applicant submitted a site plan to me regarding his latest proposal for review as a potential Conditional Waiver. In response to the applicant's request, on May 20, 1998, I made a site inspection at the subject property. During my inspection, I was able to determine whether or not a proposed project would affect a critical area identified on the site. It is my opinion, that the specific proposal for a single car garage, located on the east portion of the site, will not affect the steep slope critical area located on the west portion of the property. Therefore, I am granting a Conditional Waiver from the requirements of a Critical Areas Study for the construction of that single car garage. I,- # - I— — — - o f —4 T I �-: 6- u-�r- .<---- 170-- F—,K t IOD ` Q V �-- �'U�Cw`� CAV Calk"f tam ;.,, �d ► aIris • 2rJ� fit ii#ir�a Qotyl. tioc�S�E. !i' Pr p, �C w � t; orl Cam! +ctIF, M W1Ax, I tz-;�.25 5C AL- , I r 2d City of Edmonds Critical Areas Conditional Waiver Applicant: Paul Stromm Determination #: CA-1998-122 Project Name: Permit Number: Plan Check 02-190 Site Location: 9309 Olympic View Dr. Property Tax Acct #: 1327-031-022-00 Project Description: Demolition of an in -ground swimming pool and backfill Waiver Criteria (all criteria must be found to apply): X There will be no alteration of the Critical Area or its required buffers; X The development proposal will not impact the Critical Area in a manner contrary to the goals, purposes, objectives and requirements of the Critical Areas ordinance; X The development proposal meets the minimum standards of the Critical Areas ordinance; X The above findings are based on the following conditions of approval: 1. This conditional waiver is only for the removal of the existing pool, the backfilling of that immediate area and any associated landscaping. 2. This Conditional Waiver is granted with the understanding that the existing pool is located on the opposite side of the house and more than the required buffer from the Steep Slope Critical Area. 3. All required building permit must be obtained. Based on the above findings and conditions, the requirement for a Critical Areas Study associated with this developmen Chapter 20.15B.040 (A)(1) of th Steve Bullock Name ed, as authorized by Code. April 29, 2002 Date 62�CEfVED APR 2 6 2002 PERMIT COUNTER