Loading...
CRA2000007204l18l20@0 09:54 2063437559 IIII III • ` �� *R211-2M 12: S4 1 TY 09 w City of Edmonds Develvw,W 8avka maxudnj vmWoo Roes• 4".771.6=0 Fax: 425.7 LOWW SEATTLE SUN SYSTEMS farfttosTAreea File Critical ArentheeWist Fee: City Receipt No:. 15s V Date Mailed to Applicant: PAGE 02 4 JS771 r1221 -02/ 03 CRITICAL AREAS CHECKLIST The Critical Arena Checklist contained on this form is to be filled out by any person preparing a Development Permit Application fbt the City Of Edmonds Prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potattial Critical Areas am, or may be, present on the subject property. The information needed to complete the Cheddist should be easily available $om observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it w tht City. The City will review the checklist, make a precursory site visit, and make a determinotion of the subsequent steps necessary to complete a development permit application. Please submit a vicini �`ntaPp�' along with the signed copy of this form to assist�ity staff in finding and locating the specific piem of property described on this form. In addition the applicant shall include other pertinent information (e.g., site Wan" to Mg, etc.) or studies in conjunction witi� thj to assist staff in completing their preliminary assessment of the site. I have completed the attached. Critical Areas Checklist and attest that the answers provided are factual, to the best of my knwwb dp (fit! out the approptiste column below). owner Apptka/o�t/ O Name sVW,w 7 M o ,� �✓s, &/ City State Zip �;..Z,7 Telephone -Joe--) Sigtutetu+e Dawat�..�, 00 Applicant Representative: Name 9trert Address City State z Zip Telephone Date RECEIVED ED RW.A"4 -Wj - 00 MAY 0 1 2000 DEVELOPMENT SERVICES 04/18/20g0 09:54 2063437559 SEATTLE SUN SYSTEMS PAGE 03 • APR-11-2�0 12: SS CITY OF ECh`1YOS Critical Areas Checklist L°O° ° Z W-r-fir -.fir rr-...+--rr-r --. Site Information (soilehopogrnphy/hydrology/vegepttio,st)/ 1. S lu Addresall o at3on: _ _ �,3oZS g/,oic„y/e &-j _•b e Q Property Talc Aaw w Numbs. _ i �31-1 3 1.. 4, DO w Approximate Sits Size (k es orsgmtaj'm): d. is title site currently ftvt:kgW „✓ya; __� no. If yes; how is Cite devetoped7 _y, ldgJ ele F / or Describe the gamol site topopaphy. Check all that apply. Flat. less $0 3-fm Omuta change over 611dre Ike. Roiling: slopes on site VAMIly Ion than 15% (a vertical rise of 10-feet over a - hotitorttel dittutee of 66.fiet). Hilly: slopes present on she of more thou I S% and less then 30'Y. (a vertical rise of 10-fw over a horitmW distance of 33 to 66-feat)_ Steep' Vida of Seater this 30% present an site (a vertical rise of 10-feet bWzoMal distam of teat stun 33-"). other (Please desatibe): 5j' t c R Pe, 1-� i� VHF j J �j ►.1 U �� S D �n�}) .......... _........ _.,..... :.....:,:, .,r.. l :.:1..`I.H`::... d3 �✓' F-e_. r . Cam' p rev C t✓Gvta. r `mot SR'A rs p per,+ F I- r �ktAV . f COUP-J(�b(.C_ S l40v--� F- City of Edmonds Critical Areas Determination Applicant: Ron Clyborne Determination #: CA-2000-0072 Project Name: Permit Number: Site Location: 9325 Olympic View Drive Property Tax Acct #: 1327 031 026 00 Project Description: Non -Project Specific Determination: Study Required: During review and inspection of the subject site, it was found that the site appears to contain and/or is adjacent to a Steep Slope Hazard Area pursuant to Chapter 20.15B of the Edmonds Community Development Code (ECDC). To determine if a Steep Slope Hazard Area does exist, a topographic survey prepared by a Licensed Land Surveyor delineating Steep Slope Hazard Areas must be completed. Any slope of 40% or more with at least 20 feet of rise will be classified as a Steep Slope Hazard Area. A 50-foot buffer is required from both the top and toe of the slope. A 15-foot building setback is required from the 50-foot buffer. For development of any kind which is proposed within the critical area, 50-foot buffer or 15-foot building setback, it must be shown that the development will not adversely impact the Critical Area or its buffer, by doing one or possibly both of the following depending on the outcome of the study: For development proposals which will occur within the 50-foot buffer, but no closer than 10 feet from the top or toe of the slope, the 50-foot buffer requirement may be reduced to 10 feet if a study is completed by a licensed geologist or geotechnical engineer which clearly demonstrates that the proposed buffer alteration will have no adverse impact upon the site, the public or any private party. All Critical Area Studies must be completed by a licensed Geotechnical Engineer (as defined in ECDC 20.15B.020.Y) or under a three party contract where the City hires the professional required, and the applicant pays for the study (pursuant to ECDC Section 20.15B.140). 2. If development must occur within the critical area, buffer, and/or buffer setback, and is not identified as an exception per ECDC Chapter 20.1513, a Reasonable Use Exception and Variance must be obtained pursuant to ECDC 20.15B.170A and 20.15B.040C. The site is also in an area designated on the Critical Areas inventory as Slopes with Erosion Potential. All proposed development must have an erosion control plan approved by the City of Edmonds Engineering Department. 1 If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located on the site, they may submit their proposal to the Planning Department for review. If the Planning Department finds that the proposed development permit will not adversely impact a Critical Areas or its buffers, a conditional waiver may be issued on a project by project basis. well Name Date 2