Loading...
CRA-2010-0010 Erosion.pdfSite Location: 9th 7705 23 Place SW Tax Acct. Number: 00559300003402 Determination: Study Required Determination #: CRA -2010-0010 Applicant: Filco Co. Owner: Steven M. Bawolak 7T-1T4.rfeX-• E During review and inspection of the subject site, it was found that the site contains and/or is adjacent to critical areas, including Geologically Hazardous Areas, pursuant to Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). The subject parcel slopes up gently from the south to north. At the northern edge of the parcel there is a steeper grade up toward the old Interurban trolley/Snohomish County PUD right-of-way. According to the City's LIDAR data, the steepness of this short slope varies from approximately 25% to 35% which qualifies the slope as an erosion hazard. This study applies to the entire subject parcel. Depending on the location and type of project proposed relative to the identified critical areas, certain studies and reports may be required. F—Al IN• I 111=1VIN �� I I ill �; i ii i o lvi 1 q•11 I'l 11 F ..•.• Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.220. Similarly, certain development proposals may be exempt from Critical Areas Requirements (ECDC 23,40.230). If you have any questions about whether your proposed development qualifies as an allowed or exempt activity, please contact a Planner for more information. Critical Areas Reports identify, classify, and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area, the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose to submit the entire study with your specific development application. • Please review the minimum report requirements for all types of Critical Areas that are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). • Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study, and there is an approved list of consultants that you may choose from. You may contact the Planning Division for more information. • General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. STUDY REQUIREMENT — EROSION HAZARD AREA It appears that this property contains or is adjacent to an Erosion Hazard Area. Erosion Hazard Areas include: • Those areas with Alderwood and Everett series soils on slopes of 15 percent or greater. • Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or ground water seepage. • Areas with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. Development within an Erosion Hazard Area must meet additional criteria. • For erosion hazard areas with suitable slope stability, the only critical area study needed is an erosion and sediment control plan prepared in compliance with the requirements set forth in Chapter 18.30 ECDC as part of the construction documents. This option is at the director's discretion, per Edmonds Community Development Code section 20.80.050.G. • In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed Geotechnical Engineer or other qualified professional. Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. • Report requirements are given in ECDC 23.80.050, and more generally in ECDC 23.40.090.D. • Development standards are given in ECDC 23.80.060 and 23.80.070. If you have any questions about this determination, please contact a Planner for more information. UM Signature MORM NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. N