Loading...
CRA20110054_18524-73rdAveW#A.pdf CITY OF EDMONDS th 121 5Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DEVELOPMENT SERVICESDEPARTMENT •PLANNING DIVISION Critical Areas Reconnaissance Report Critical Areas File NumberCRA20110051 DeterminationStudy Required Site Location18524 73 rd Avenue West #A, Edmonds Tax Account Number 00477500007700 Property Owner Julian Reyes Applicant Same Critical Areas Present Geologically Hazardous Areas Erosion Hazard Areas Landslide Hazard Areas Site Description During review and inspection of the subject site, it was found that the site may contain (or be adjacent to) critical areas, specifically a Geologically Hazardous (Landslide Hazard) Area, pursuant to Chapter 23.40 of the Edmonds Community Development Code (ECDC). Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other geological events. They pose a threat to the health and safety of citizens when incompatible development is sited in areas of significant hazard. Such incompatible development may not only place itself at risk, but also may increase the hazard to surrounding development and use. Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. The LiDAR map (inset) indicates a steep slope (60%) just north of the house (18’/30’). Soils on the property are identified as Alderwood gravelly sandy loam series, which classifies the site as a potential erosion hazard. These slopes qualify as potential “geologically hazardous areas.” Projects proposed further than 65’ from the top or toe of the slope (50’ buffer + 15’ setback from the critical area) require a geotechnical report to address critical areas may not issues (of course, other departments may require a report to address their codes). Allowed Activities & Exempt Proposals Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.220. Similarly, certain development proposals may be exempt from Critical Areas requirements (ECDC 23.40.230). If you have any questions about whether your proposed development qualifies as an allowed or exempt activity, please contact a Planner for more information. General Report Requirements Critical Areas Reports identify, classifyand delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas which are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study and an approved list of consultants that you may choose from. You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. Landslide Hazard Areas Development is restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other geological events. They pose a threat to the health and safety of citizens when incompatible development is sited in areas of significant hazard. Such incompatible development may not only place itself at risk, but also may increase the hazard to surrounding development and use. The criteria that are applied depend on the amount that the buffer is reduced. The buffer can be reduced to a minimum of ten (10) feet (with an additional 15’ building setback per ECDC 23.40.280) if a report is prepared that meets the standards listed in ECDC 23.80.050). The alteration must also meet the requirements listed ECDC 23.80.060. In addition, proposals to reduce the buffer to less than ten (10) feet must comply with the design standards listed in ECDC 23.80.070.A.3. Development is restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. Determination: Study Required This review applies to the entire subject parcel. Depending on the location and project proposed relative to the identified critical areas, certain studies and reports may be required. Please contact the Planning Division at 425.771.0220 if and when you have a specific development proposal for this site in order to discuss the various permits that will be required. Please note that tree removal on sites containing critical areas may first require a tree cutting permit, and the illegal removal of trees may result in penalties and steep fines (ECDC 18.45.070, ordinance #3828). Gina Coccia, Associate Planner June 30, 2011 Name, Title Signature Date Page | 2