Loading...
CRA20150053 letter with map.pdf'/rc. 189.3 121 5"' Avenue North, Edmonds WA 98020 Phone: 425.771.0220 ® Fax: 425.771.0221 ® Web:rrw a1Crr�ari wt s civ; DEVELOPMENT SERVICES DEPARTMENT ® PLANNING DIVISION Critir:ol Areas /rile Nurr°rber, Deterrninot.ion Site l.oc'ation 'P-r.:rxA4cc(.,)unt lllrarrrber Property Owner Applir.,ant— Criticol A1reos Present. . fte Description C."`RA20 i F1G: 05 '%...rciy Req Dirac 7109.164 Th Street, Edrr°oncLs 0063630000.1200 Wellington Wilie Wellington Geologically is ally Hazarµdous Alr°ea,s N.. Erosion ion llazard Aircrcr.,5 During review and inspection of the subject site, it was found that the site contains and is adjacent to critical areas, including Geologically Hazardous Areas (Erosion Hazard Areas), pursuant to Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at ww-w.t--..dmcandswa.Fp . Your property is located on a western facing slope. This slope varies between areas near level, around the house, to areas on your property where the slope exceeds 15% according to City LiDAR data. Due to the degree of the slope on and adjacent to your property, it was found that the site contains slopes that are steep enough to be considered an Erosion Hazard Area (over 15% slope). Your property also includes the Alderwood USDA soil series types. This type of soil is listed in section 23.80.020 ECDC which identifies soil series that have characteristics leading to possible severe erosion occurrences. Allovved Activities Exempt 1, r o 1 Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.220. Similarly, certain development proposals may be exempt from Critical Areas requirements (ECDC 23.40.230). if you have any questions about whether your proposed development qualifies as an allowed or exempt activity, please contact a Planner for more information. General Report Requirements Critical areas reports identify, classify and delineate areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from specific development proposals. If a specific development proposal results in an alteration to a critical area, the critical areas report must contain a mitigation plan. General mitigation requirements for all critical areas are described in ECDC 23.40.110 through 23.40.140. Critical area reports are most commonly submitted when applying for a building permit or land use development application (although they can be submitted at any time). The minimum requirements for all critical area reports are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study and an approved list of consultants that you may choose from. Please contact the Planning Division for more information. Erosion iAreas Development is regulated within Erosion Hazard Areas and must meet specific criteria. For erosion hazard areas with suitable slope stability, an erosion and sediment control plan prepared in compliance ECDC 18.30 will be considered to meet the critical areas "Study Required" determination. The determination of "suitable slope stability" will be made by both the Planning and Engineering divisions of the City of Edmonds. In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed geotechnical engineer or other qualified professional. Report requirements and development standards for alterations within erosion hazard areas are found in ECDC 23.80.050 through 23.80.070. uu rnation: Required This review applies to the entire subject parcel. Depending on the location and project proposed relative to the identified critical areas, certain studies and reports may be required. Please contact the Planning Division at 42.5.771.0220 if and when you have a specific development proposal far this site in order to discuss the various permits that will be required. June 1, 2015 Sean Conrad, Associate Planner �� �..,.. a, ... Name, Title Signature Date Page � 2