Loading...
CRE Properties Warehouse 2.DOC MEMORANDUM Date:March 25, 2008 To:Building Department From:Mike Smith, Acting Fire Marshal 425-775-7720 Subject:CRE Properties/Office Warehouse 21030 70 the Ave W Permit BLD20080065 The Fire Department has the following comments: 1) Ann Bullis, ABO, did a very thorough review and I will not duplicate her corrections. 2) During the Pre-App you submitted plans for a fully sprinklered building. The plans I am reviewing do not show the building having a sprinkler system. Please refer to John Westfall’s comments regarding fire apparatus access and the 150 foot limitation.(2006 IFC 503.1.1) Either extend the Fire Lane(minimum 20’ width and 13’6” of overhead clearance) to the NE corner of the property and provide more than 2’3’’ of clearance between the fence on the South and West sides of the building (to ladder the building it will require at least 10’ of clear space) or sprinkler the building. 3) If you sprinkler the building please apply for a Fire Connection Permit(see city handout). The Fire Connection Permit is not deferred and must be issued with the building permit. April 7, 2008 After speaking with Mike Spano from CG Engineering the following will pertain: 1) Increase Fire Lane and Turnaround to submitted dimensions. 2) Stripe Fire Lane per City Specification 3) Building will require an Automatic Fire Alarm monitored off site.(deferred submittal). City of Edmonds Fire Department