Loading...
Critical Area Notice of Decision.pdfCity of Edmonds Critical Area Notice of Decision Applicant: - 'Property ty Oynen Critical AreaFile'##: C-, O n 0 Permit Number: C� 2 V i Site Location: Parcel Number: i Project Description: � -- Conditional Waiver. No critical area report is required for the project described above. 1. There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.020, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. ❑ Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. ❑ Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40:160: 1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any, alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and „o , 6. The proposal is consistent with other applicable regulations and standards. ❑ Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. ly tvorable Critical Area Decision. The proposed project as described above and as shown on the ttachen site plan meets or is; exempt from the critotia iat ECDC- 23.40.160, Review Criteria; and complies with the applicableprovisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal 'shall void this decision pending re-review of the proposal. Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). ❑ Notice on Title. Critical area notice on title recorded under AFN r,�),JJLS J'201 4- , 1"I:Ale Reviewer Signature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 11/29/2016 da two IW WA- cL X3 A VV2 uz, Ch mho-rT B -�z m C*14' LA da two IW WA- cL X3 A VV2 uz, Ch mho-rT B -�z m C*14' k1ft"y pp OWNS '60,