Critical Areas Study Reqd.pdfThe Critical Areas Checklist contained on -ibis form . is to
be filled out by any person preparing a Development
Permit Application. for the City, of Edmonds, prior to
his/her submittal of the application to the City.
The purpose of the Checklist is to enable City staff to
determine whether any potential Ciftal Area's are,,, or
may., -be,present on,thp pubj betpropert `'The inforrhation .
.y
needed to complete the Checklist should be easily
available ftom observations of the site or data available at
City Hall (Critical areas inventories, 'maps, or soil
survey$).
Date Received:—
_C1111ty Receipt
I . . . . . . . . . . . . . . . . ............
- i L
A property owner, or Ms./her authorized representative,
must fill out -the checklist, sign :and date it, and submit it
to the City. -The Citywill review the checklist, make a
precursory site visit and make adete'rm"6n of the
subsequent steps necessary to complete a dev6lopm'ent
permit application..
Please, subtidVa vicinity,map, along with. the signed copy
of this f6nn to assist aty staff m fnding andlocating the
speei.fip piece of property 'described on this form. In
addition, the .applicant shall include other pertinent
Information (e.g. site plan, topography map, etc.) or
studies in conjunction with this Checklist to assistant staff
in completing their prelimhiary assessment of the site.
The undersigned applicant and his/her/its heirs, and assigns, in consideration on the processing of the application agrees
to release,, had emnify,,defend and hold the City of Edmonds harmless from any and all damages, including reasonable,.
attomey's fees, wising from any action or hi action based in whole or part upon false, misleading, inaccurate or
incomplete Information furnished by the applicant, his/her/its agents or employees:
By my signature, I certify that the information and exhibits herewith submitted are true and correct to the -best of my
knowledge and that Tarn �.uthorlzed to file this application on the behalf of the owner'asilisted below.
SIGNATURE Ov APPLICANVAGENT ro PC2
Propeily Owner's Authorizition
By my sigripture, I cer* that I have authorized the above Applicant/Agent to apply for the subject land
use application,
and, grant my pernilssi6n. for the public officials and the staff of the City ofEdmonds enter the subject property for the
purposes of inspection and posthIg attendant to this application.
SIGNATURE OF
Owner/Appli' ant:
Rotary Club of.Lynnwood
Name
PO Box S856
Street Address
Lynriwocid WA'36 856
980
City Zip
Telephone:._..: _m 6 Ia'7 6 - 77 8 6
Email address-.. 1rrpeirce@,ao1.cout.
Applicant Representative.
Bo b Settng
Name*
371.1 91st Street SE
am=
Everett WA9*8208
City state zip
Telephones. (2G6) 399-4668
�Cmail Address:- bob@rasf_Lt_J[�.nc..c(�:)m
Revised on,12118112 1'120 - Crftical*pe�,Y Checklist Page, 00
CA File No:
Critical Areas Checklist
Site Information (soils/topography/hydrology/vegetation)
1. Site Address/ Location:. 8116 206th Street SW Edmonds WA. 98206.
2.'* Property Tax Account Number: 0 0 614 3 0 0 0 0 3 8.0 8 t 3g®7—
3. Approximate Site Size (acres or square feet): 20,594 Square foot
Or
4. Is this site currently developed? r yes; X no.
If yes; how is site developed? However sewer is- on the property
5. Describe the general site topography. Check all that apply.
Flat: less than 5 -feet elevation change over entire site.
X Rolling: slopes on site generally less than 15% (a vertical rise of. 10 -feet over a;horizontal
distance of .66 -feet).
Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10 -feet
over a horizontal distance of 33 to 66 -feet).
Steep: grades of greater. than 30% present on site (a vertical rise of 10 -feet over a horizontal
distance of less than 33 -feet).
Other (please describe):
6. Site contains areas of year-round standing water: NO ; Approx. Depth:
7. Site contains areas of seasonal standing water: NO , ; Approx. Depth
What season(s) of the year?
8. Site is in the floodway NO floodplain NO of a water course.
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year®round?
NO Flows are seasonal? NO (What time of year? ).
10. Site is primarily: forested Yes ; meadow ; shrubs ; mixed
urban landscaped (lawn, shrubs etc)
11. Obvious wetland is present on site: NO
1.
2.
3,
Plan Check dumber, if app
oc
Site is Zoned?
SC8 mapped soil type(s)? '
-__- For City'Staff Use ......
4, Critical Areas inventory or C.A. map indicates Critical Area on site?
5: Site within designated earth subsidence landslide hazard area?
.SITE DETEI INA'TION
PDYREQULREP, WAIVER
Revised on 12/18/12 P20 - Critical Areas Checklist Page 2 oft
rhe. 1 Sy"
CITY OF EDMONDS
121 5th Avenue North, Edmonds WA 98020
Phone: 4.25.771.0220 • Fax: 425.771.0221 ® Web: www.bdmondswa.gov
DEVELOPMENT SERVICES DEPARTMENT ® PLANNING DIVISION
C,ritical Areas Reconnaissancei.Report
Site i i
During review and inspection of the subject site, it was found that the site may contain (or be adjacent to) critical
areas, including Geologically Hazardous Areas (Erosion Hazard Area), pursuant to Chapters 23.40.and 23.80 of the
Edmonds Community Development Code (ECDC). Cited sections of the Edmonds Community Development Code
(ECDC) can be found on the City of Edmonds website at www.edmondswa.gov.
The northern portion of the site slopes down (from near the end of the private drive) to the south. Portions of this
slope are between 20 percent and 25 percent, according to City UDAR data. According to information from the US
Natural Resources Conservation Service, soils at the site include Alderwood Gravely sandyloam(8-15 percent
slopes). Due to the steepness of the slope and the type.of.scail, the site.contains and/or is: adjacentto slopes that
are considered Erosion Hazard Areas (over 15 percent slope).
Ile 'ActivitiesProposals
Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.220. Similarly, certain
development proposals may be exempt from Critical Areas requirements (ECDC 23.40.230). if you have any
questions about whether your proposed development qualifies as an allowed or exempt activity, please contact
a Planner for more information.
This review applies to the entire subject parcel. Depending on the location and project proposed relative to the
identified critical areas, certain studies and reports may be required. Please contact the Planning Division at
425.771.0220 if and when you have a specific development proposal for this site in order to discuss the various
permits that will be required. Please note that tree removal on sites containing critical areas may first require a
tree cutting permit, and the illegal removal of trees may result in penalties and steep fines (ECDC 18.45.070,
ordinance #3528).
Kevin Garrett, AICP, Planner May 13, 2014
Name, Title Signature Date
Page 13
Inc. 1890
May 14, 2014
CITY OF EDMONDSDAVE EARLING
MAYOR
121 5th AVENUE NORTH a EDMONDS, WA 98020 ® (425) 771-0220 ® fax (425) 771-0221
www.edmondswa.gov
DEVELOPMENT SERVICES DEPARTMENT
Rotary Club of Lynnwood
PO Box 5856
Lynnwood, WA 98036-5856
Subject: Determination regarding Critical Areas Checklist: CRA20140043
Dear Applicant: -
Enclosed please find a copy of the Critical Areas Checklist you submitted.
The `DETERMINATION" reached by the City is located on the reverse side of the form (bottom of page).
IT IS VERY IMPORTANT FOR YOU TO RETAIN A COPY OF THIS CRITICAL AREAS
"D ETERMI NATION"• YOUR ��
Please'examine this Determination for additional requirements. You may need to submit additional
information such as an Environmental Checklist or Critical Areas Study.
The Determination for the Critical Areas Checklist you submitted is a site-specific determination, not a
project -specific determination.
YOU MUST SUBMIT A_COPY OF THE CRITICAL AREAS CHECKLIST and DETERMINATION WITH
Permit applications include the following:
Building Permits
Conditional Use Permits
Subdivisions
Variances
Applications to the ADB" Land Use Applications
Any other development permit applications.
Thank you,
Planning Secretary
C: Bob Setting
*Architectural Design Board
Enclosure
C:kUsers\Ross\Documents\LFNDA1CRITICAL AREAS CHECKLIST.doc
® Incorporated August 11, 1890
Sister City - Hekinan, Japan
HU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth science
May 20, 201.4.
Mr. Robert Setting
Rotary Club of"Lynnwood
24005 — 74"' Avenue West
Edmonds, WA 98020
Dear Mr.Setting:
RECEIVED
SubJect: Geotectmical Investigation
Onsite Storillwater Disposal N(W 0 (1) 2014
Two Single -Family Residcn.c(-.,s DEVELOPMENI SE110 ' "ES
81 xx ---- 206"' Street SW lit li N I Ei R
E(Jujonds, Washington
L,&A Job No, 14 043
1N,rR0Ducr10N
We understand that the development of two single- ramily residences is proposed by the
Rotary Club of Lynnwood for the subJect property located at (fic above address in
Fdmonds,. Washington. The development is to be accessed by extending (fic south end of
an existing paved driveway off'86"' Street SW southward to the pro ' ject site, we also
till dcrstand Haat onsite disposal of storm runoff collected over impervious sur laces of tile
development is considered for these residences.
At your request, we have completed a geotechnical investigation for file propose(I
development. The pl-Wr)0se of this investigation is to characterize the SUbsurface
conditions ofthe proJect site and present, our geotechnical recommendations of onsite
19213 Kenlake Place NE - Kennoore, Washington 98028
Phone (425) 483-9,134 - Fax (4-25) 486-2746
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 2
stormwater disposal for this development project. Presented in this report are our
findings of the surface conditions and our recommendations of onsite storinwater disposal
for the development.
Our proposed scope of services for the geotechnical investigation comprises specifically
the following.
1. Review geologic and soil conditions at and in the vicinity of the subject project site
based on a published geologic map.
2. Explore subsurface conditions with backhoe test pits on the site to depths where an
infiltratable soil stratum is encountered or to the maximum depth (about 10 feet)
capable by the backhoe used in test pit excavation, whichever occurs first.
3. Conduct two in-situ infiltration tests in accordance with the procedure outlined in
Appendix C — Approved Methods for Obtaining Design Infiltration Rates of the
City of Edmonds Stormwater Code.
4. Prepare a written report to present our findings, conclusions, and recommendations.
A geotechnical staff from our office was on site to direct the subsurface exploration
program, examine the soil and geologic conditions encountered, and maintain logs of the
test pits.
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 3
The general location of the project site is shown on Plate I — Vicinity Map. It is situated
on a gentle, westerly declining plain. As shown on Plate 2, the project site is an
irregularly-shaped parcel of land, elongated in the north -south direction. It lies off the
south end of a long, private, joint -use, paved driveway, and is adjoined by residential
developments to its south, east and west. Within the site, the ground generally slopes
down southward from its north end and westward from its cast side at about 20% to 25%
grade for about 6 to 8 feet of drop, then trends from there westerly very gently. .
The site is currently vacant with only a couple of storage sheds on it. It is dotted by tall
mature evergreen trees with few younger deciduous trees mixed in between. The site is
partly clear and graded, with a dirt driveway constructed of fill entering at its northwest
corner.
0""IM13''K11117"i �21 M
The Geologic Mar) of the Edmonds East and Part of the Edmonds West Quadrangles
Washington, by James P. Minard, published by U. S. Geological Survey in 1983, was
referenced for the geologic and soil conditions at the residence site. According to this
publication, the surficial soil unit at and in the vicinity of the project site is mapped as a
Vashon Till (Qv1) deposits.
LILT & ASSOCIATES, INC.
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 4
The geology of the Puget Sound Lowland has been modified by the advance and retreat of
several glaciers in the past and subsequent deposits and erosion. The latest glacier
advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser
Glaciation, which has occurred during the later stages of the Pleistocene Epoch and
retreated from the region some 12,500 years ago.
The deposits of the Vashon till soil unit were plowed directly under glacial ice during the
most recent glacial period as the glacier advanced over an eroded, irregular surface of
older formations and sediments. This soil unit is composed of a mixture of unsorted clay,
silt, sand, gravel, and scattered cobbles and boulders. The Vashon till soil over the top
two to three feet is normally weathered to a medium -dense state, and is moderately
permeable and compressible. The underlying fresh till soil, commonly referred to as
"hard pan", is very dense and weakly cemented. The fresh till soil possesses a
compressive strength comparable to that of low-grade concrete and can remain stable on
steep natural slopes or man -make cuts for a long period. It can provide excellent
foundation support with little or no settlement. The fresh till deposits are of extremely
low permeability and would be only allow ston-nwater to seep through very slowly.
SOIL CONDITION
Subsurface conditions of the project site were explored with four test pits. These test pits
were excavated on May 13, 2014, with a rubber -tracked backhoe, to depths from 6.0 to
8.0 feet. The approximate locations of the test pits are shown on Plate 2 - Site and
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 5
Exploration Location Plan. The test pits were located with either a tape measure or by
visual reference to existing topographic features in the field and on the topographic
survey map, and their locations should be considered only as accurate to the measuring
method used.
A geotechnical staff from our office was present during subsurface exploration, examined
the soil and geologic conditions encountered, and completed logs of the test pits. Soil
samples obtained from each soil layer in the test pits were visually classified in general
accordance with United Soil Classification System, a copy of which is presented on Plate
3. Detailed descriptions of soil layers encountered during site exploration are presented
in test pit logs on Plates 4 and 5.
Loose fill of 10 inches and 2.0 feet thick were encountered by Test Pits I and 4,
respectively, located on the west side and near the southwest corner of the site. The fill is
underlain by a layer of relic topsoil about 1.5 to 1.7 feet thick. Test Pits 2 and 3
encountered about 10 inches of topsoil mantling the site. Under the topsoil and relic
topsoil to about 4.0 to 5.5 feet deep is layer or layers of weathered soil of loose to
medium -dense,, silty fine sand, with various amount of gravel and occasional cobble. The
weathered soil is underlain to the depths explored by a Vashon till deposit of light -gray,
very -dense, cemented, gravelly, silty fine sand with occasional cobble.
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 6
Groundwater was not encountered by any of the four test pits excavated on the site. The
very -dense, cemented, fresh till deposit underlying the site at shallow depth is of
extremely low permeability and would only allow storinwater to seep through very slowly.
In the wet winter season, stonnwater infiltrating into the more permeable surficial soils
would perch on the till deposit. The amount of and the depth to the near -surface perched
groundwater may fluctuate seasonally depending on precipitation, vegetation cover, site
utilization, etc. It may dry up completely during the dryer summer months and
accumulate and rise in the wet winter months.
Landslide Hazard
The site is generally gently sloped with local moderately steep slopes and is underlain at
shallow depth by a very -dense till deposit. This deposit is of very -high shear strength and
is highly resistant against slope failure. Therefore, the potential for deep-seated
landslides to occur on the site should be minimal.
Erosion Hazard
The surficial fill, topsoil, and weathered soil are of low resistance against erosion, while
the underlying very -dense till deposit is highly resistive against erosion. The weak
surficial soils over the steeper portion of the site may be eroded if they are devoid of
vegetation cover and saturated. Prolonged erosion may result in surficial mudslides in the
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 7
steeper portion of the site. To mitigate such erosion hazard, vegetation outside of
construction limits should be preserved and maintained. Unpaved exposed finished
ground within the site resulted from construction activities should be re -seeded and re -
vegetated as soon as possible. Concentrated storrawater should not be discharged
uncontrolled onto the ground within or adjacent to the site. Stormwater over impervious
Ii
surfaces, such as roofs and paved driveway, should be captured by an underground drain
line system connected to roof downspouts or by catch basins installed in the paved
driveway. Water collected by these drain line systems should be tightlined to discharge
into a storm sewer or suitable stormwater disposal facilities, such as infiltration trenches.
The Puget Sound region is in an active seismic zone. The site is moderately steep to very
gently sloped and is underlain at shallow depth by very -dense till deposits of very -high
shear strength. Therefore, the potential for seismic hazards, such as landslides,
liquefaction, lateral soil spreading, to occur on the site should be minimal. The proposed
residences, however, should be designed for seismic forces induced by strong earthquakes.
Based on the soil conditions encountered by the test pits, it is our opinion that Seismic
Use Group I and id Site Class D should be used in the seismic design of the proposed
residences in accordance with the 2009 International Building Code (IBC),
ZZHI;11� '111� I i
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 8
The site is underlain at shallow depth by very -dense cemented till soil. The installation in
the gently -sloped, southwestern portion of the site should not have an adverse impact on
site stability provided the recommendations in this report are fully implemented and
observed. Based on the two in-situ infiltration tests conducted in the weathered soil
underlying the site, infiltration trenches may be used to dispose storinwater collected over
impervious surfaces of the development.
0 11301IL111,11
In-situ Infiltration Tests
We performed two in-situ infiltration tests on May 13, 2014, on the gently -sloped
southwest portion of the project site. The locations of the infiltration tests, IT- I and IT -2,
are shown on Plate 2. The sizes of test pits were 5 ft - 10 in by 5 ft - 7 in by 2 ft - 8 in
deep for IT- I and 5 ft - I in by 5 ft - 3 in by 2 ft - 9 in deep for TT -2. The soil at bottom
of both infiltration test pits was a deposit of light -brown to light -gray, medium -dense,
silty fine sand with trace gravel. Groundwater was not encountered by the infiltration test
pits.
The two in-situ infiltration tests were conducted in accordance with the procedure
outlined in Appendix C — Approved Methods for Obtaining Design Infiltration Rates of
the City of Edmonds Stormwater Code. The test pits were filled with water for hours
initially until the amount of water infiltrating into bottom of the pits reached a steady state
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 9
(i.e., the volume of water infiltrating into the ground through bottom of the pits was about
the same as volume of water discharged into the pits while water in the pits was kept at a
constant level). Clear tap water was used in the tests. The infiltration rates into the test
pits was then determined by the constant head method with the volumes of water
discharged into the pits measured with a flow meter attached to the hose conveying water
from the faucet into the pits for a period of 30 minutes. The volumes of water discharged
into the test pits during the 30 -minute period were measured in U.S. gallons. The
volumes of water were then converted into cubic feet and divided by the bottom areas of
the test pits to derive the infiltration rate in inches per hour (iph) for each infiltration test.
A correction factor of 4.0 is used to come up with the design infiltration rate of the target
soil layer. The results of the infiltration tests are presented as follows:
* With a correction factor of 4.0.
Volume of Water
Elapsed
Infiltration
Design
Test
Test Pit
Discharged into Test Pit
Time
Rate
Infiltration
Bottom
No.
Gallons
Cubic Feet
Hour
iph
Rate, iph
Area
5'-10" x
IT -1
58.00
6.59
0.5
4.86
1.22
51-71f
51-111 x 5'-
H
51.00
5.80
0.5
5.21
1.30
j
Y
* With a correction factor of 4.0.
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 10
Design Infiltration Rate
'The design infiltration rates of the weathered soil of silty fine sand with trace gravel,
determined from the in-situ infiltration test results, with a correction factor of 4.0. to be
1.22 and 1.30 iph for IT -1 and IT -2, respectively. We recommend a design infiltration
rate not to exceed 1.20 iph be used for design of the infiltration trenches to be constructed
in the southwest portion of the site, near the locations of ITA and IT -2, for onsite
storrnwater disposal.
Emu
The infiltration trenches should be installed in the vicinity of Infiltration Test IT- I and IT -
2, and should be set back at least 5 feet from property lines, 8 feet from nearby building
foundations or utility trenches, and 20 feet from the top of steep slopes of 40% grade or
more. The trenches should be about 3 feet deep and cut at least 6 inches into the
underlying weathered soil. The soil unit at bottom of infiltration trenches should be
verified by a geotechnical engineer. The stability of the trench cut banks should also be
verified by a geotechnical engineer during excavation. Cut banks more than 4 feet deep
should be no steeper than IHAV to maintain stability and to prevent sloughing into
bottom of the trenches and contaminate the target soils. For safety, trenches should be
shored by trench blocks for vertical cut banks are more 4 feet deep.
The infiltration trenches should be at least 24 inches wide. The side walls of the trenches
should be lined with a layer of non -woven filter fabric, such as MIRAFI 140NS. The
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 11
trenches are then filled with clean washed 3/4 to 1-1/2 inch gravel or crushed rock to
within about 10 inches of the finish grade. The dispersion pipes should be constructed of
4 -inch rigid PVC pipes and laid level in the gravel or crushed rock filled trenches at about
16 inches below the top of trenches. The top of the gravel or crushed rock fill should also
be covered with the filter fabric liner. The remaining trenches should then be backfilled
with compacted onsite clean soils. The gravel or crushed rock fill should be placed in
lifts no more than 10 inches thick in loose state, with each lift compacted to a non -
yielding state with a vibratory mechanical compactor. Stormwater captured over paved
driveway should be routed into a catch basin equipped with an oil -water separator before
being released into the infiltration trenches.
The subject site is underlain at shallow depth by very -dense till deposits. These basal
soils are of high shear strength and the site should be quite stable. Proper and adequate
erosion mitigation and surface and groundwater drainage control are key to maintain site
stability during and after completion of construction. Construction of the infiltration
trenches should be in compliance with the recommendations in this report.
'f1iis report has been prepared for the specific application to this project for the exclusive
use by Rotary Club of Lynnwood and its associates, representatives, consultants and
contractors. We recommend that this report, in its entirety, be included in the project
LIU & ASSOCIATES, INC.
May 20, 2014
Two Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 12
contract documents for the information of the prospective contractors for their estimating
and bidding purposes and for compliance with the recornmendations in this report during
construction. The conclusions and interpretations in this report, however, should not be
construed as a warranty of the subsurface conditions. The scope of this investigation does
not include services related to construction safety precautions and our recommendations
are not intended to direct the contractor's methods, techniques, sequences or procedures,
except as specifically described in this report for design considerations. Geotechnical
construction of the subject project should be monitored and inspected by a geotechnical
engineer to assure compliance with the recommendations in this report.
Our recommendations and conclusions are based on the geologic and soil conditions
encountered in the test pits, results of our infiltration tests, and our experience and
engineering judgment. The conclusions and recommendations are professional opinions
derived in a manner consistent with the level of care and skill ordinarily exercised by
other members of the profession currently practicing under similar conditions in this area.
No warranty, expressed or implied, is made.
The actual subsurface conditions of the site may vary from those encountered by the test
pits. The nature and extent of such variations may not become evident until construction
starts. If variations appear then, we should be retained to re-evaluate the
recornmendations of this report, and to verify or modify them in writing prior to
proceeding further with the construction of the proposed development.
May 20, 2014.
,rwo Residences — Rotary Club of Lynnwood
L&A Job No. 14-043
Page 13
CLOSURE
We are pleased to be oll'service to you on this pro.ject, Please -reel h°ee to contact Lis if you
have any questions regarding this report or need further consultation.
Five plates attached
Yours very truly,
1.,1U ASSOCIAJ,
1, S, (Julian) L,iu, PhD,, PF-
ConsultingGeotechnical Engineer
LTU & ASSOCIA,rES, INC.
i 011111110#-1, -, I I PL SW 1 �i it st 5_w
u
�'t i ✓x2� ST SSI :: 3� � 8;
188TH � I ST SW ,
189TH S1 SW 3 ��_ �v� r�
uW m oco
WAVER,rST B 1kE PL 190 H ST Sr! 190TH ST SW 1E
- P
'a `� % of {
' �� Ni{IetsT- \� p� �� s7ER sA
/ CfIERR ST 91ST _ST
a e rn
Z�9600
/2� jj 2ND S
1117 o z 19 �ST _-W W�
eon{ a
SIJ''
FORESi" (� e y „ . o
?\
I N
Pt SN R
EXCELSIOR 9`�,"(N: p( 3�SNT1 y P�=Tru.-.� �j1I:TN 3� ^x P9 T}i
f19
Gfi -1 c TSF et m sr sN 19P
rn S k
196TH 196TH ST IN
PUGET PUGET '� a �! DR sr SW
j/ MELODY LT! 14y r°tyrn} �t a 14E
_ j7APLEYl00f z a 9� 3
1
BR 100 - LN_ VILWLAND �WY �IIEG PA�J STHSu�li98P�i
00
DR 6POOY�1ERE Si >�I - _.z) I9yTifi` ,.�tcn Q�.F�?o�PtSW �I srs
�! 0 15
SPE ST VIL1("�ORI ----i ---. �� i �.n<�p` pt S4 >�j ¢
L v�u {TA{e L { VISA WY
I' �``,GILPIER Ul VISTA C _, "i �yy'ij 200TH ; ST SW
WER L.1 ; PL vl �R o ul }—
77S / t / 1 ALOHA WY ALOH1 '� �2 o -o Q' v z CASU E � 2OIST L{ oil ti
{ < F
CAROL SIERRA , 202ND >� a
N,G /,z�iCARO> ST U W} _ f W ] �W - .z
¢ g 1 RL G ° 9 [020 D N
/ $$T o
WY
GLEN 1ST + 0 ScRRA) sT at<, �i Z30-1 3y ST I I°
"� _ - QL-i - ,LU �S 3{ L Sli 203RD PL �-_SW
��
DALEY1 i3Pt ST.z;.. al PROEJECT moi, �Lz kTn sN�
IVIC o sW co 'tzearu
CTR
RA31�_ _ hI. St ` {� F l a SN
fir a �{ a
DG
PO 3/ E F t; MILL PK i ,T a �` 20618
o�a -
r cr�ST
L
BELSLa
/O7
f zoo
PL
S{ i OPji._-i2Jc t PLS col
NVQ
STes ' DAYTON i IY�A I tl A`'t _.'r_ 5T r S, J w, a - z� `54 °o PL pi
ro �RCU YOST'. ' .� "-d 209TH PL 77, J I sw
IQAPI r ST _ _ I S6! 0 5
i
_ MEIr,ORIAL - 3
L E;2 v > v) 3fco
z, n ALDER T ST PARK
< z , u,
ST J'z� �'
¢, - } ; - - 1
cn tpj WALNUT! �� ST.< �� �� of
- �'�� LCFy.! �o� �. rs 1 T ° I
Hui CR H
[ CEDAR ST PL ✓�� R Q,��.
—_
LL Wf v .y r ,v a seF rei_ RAID �� P,2 ST
�� SW �e
_r -
SPRUCE ST j/i/ a ¢
f
St_RO E F. C 1 Q1(}E:Ef s t0 •0 213TH ST
n
ST ,. q� Fi
u{'. r � � �Aut.EF ( �'� �_ � , � eIt 214TH PL SN�� sw
EdLOL{ ¢l 'N t `s. "z 4 __ - 214TH PL SAH_
Y -
ER5e PS�jo��-rREt r L1�14 SO
Li4�H ��S !_ dl I A 213TH ST 215TH ST SW
SEAa„} If �„ ; I i _.._ .� PL W i 215TH `aL �.. SW
��
{ !n~ t t t ,,( ! �' z 5 F� �a 21511 PL
T PIidE i -ST stn l x u� 216Th S� - St- -
" i r 6p s5SEfi ... i — i 7 216T i P - _ — - ---� - d 3
t F9RSYTHj �� �� ¢� Z �� A I 217TH �i SW�2s�rri sr Ns� i
Pifl n LN v j ¢ ^i �iF-
17TH P( SW �: OP
Ljf-IR F'L1 FTR .. _ „' - 10 H - - T K SW ------._.--
F
_ - �-
STi _ 2 _ _
�� 18TH, S
<1
i
51 SW - r; �. �' � _s !- �- 219TH
' - = S71 j�
EL'I
- -
w.
ST ; Et��9 ST 220TH ', ; '�`:_s r A'" °i _� a , sw w .
,
s Q
,
nl �
R 22IST r 0
BIR ii
f31R(Hi PL z
I s r 2231F0-
P1
Z RD _ €s
VICINITY MAP
LILT & ASSOCIATES, INC® TWO SINGLE-FAMILY RESIDENCES
01 XX - 206TH STREET SW
Geotechnical Engineering •Engineering Geology • Earth Science EDMONDS, WASHINGTON
JOB NO, 14-043 DATE 5/16/2014 1 PLATE 1
I
r"i t8' I I ( wt„o-cao-ca�cm
I I
I I
a I I
71
I I � 4
I i
1
\ APPURTENNtT PRIVATE FUAO PER A. F.'N0.
7RM28028 (MAINTENANCE AGREPIEN
UNUER AF. NO. 9 70 2 2 4 0690) 1
�Ya(N u �: pr tta. Oi vG'#.A veil
Hi I
3904
N
% EnAucaxa msn*.�cn
l A r iv, na mra.zefn3a S
97r3ri-w
X01
!NZ11F.S11 EGRESS
\U U I'
U L
A- - SAA R
1 Saco--"--� 0041,4000000500
N 8917'30• ,fly377.40'
- ®.507 $4`i
ti I�
i
ti I
T"T y - s-sszs
M N Q�
•Y.� -.r 595820 :V
0 � O as i7
ry
004 4
C)
ICC�-73_, ,
f i
tip
w _ •�
•c»i saw \
i
l �v •�. 1 OG'}i40 OGO-007-7
�. 12XOR Sq Ft
i
r �
J�x /
y /
8918'20'
SITE AND EXPLORATION LOCATION PLAN
LIU & ASSOCIATES, INC. TWO SINGLE-FAMILY RESIDENCES
81XX - 206TH STREET SW
Geotechnical Engineering - Engineering Geology • Earth Science EDMONDS, WASHINGTON
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS
GROUP
GROUP NAME
SYMBOL
GRAVEL
CLEAN
GW
WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL
COARSE-
MORE THAN 50% OF
GRAVEL
GP
1 POORLY -GRADED GRAVEL
GRAINED
COARSE FRACTION
GRAVEL WITH
GM
SILTY GRAVEL
SOILS
RETAINED ON NO, 4 SIEVE
FINES
GC:::
CLAYEY GRAVEL
SAND
CLEAN
SW
WELL -GRADED SAND, FINE TO COARSE SAND
MORE THAN 50%
MORE THAN 50% OF
SAND
SP
POORLY -GRADED SAND
RETAINED ON THE
COARSE FRACTION
SAND WITH
SM
SILTY SAND
NO. 200 SIEVE
PASSING NO. 4 SIEVE
FINES
SC
CLAYEY SAND
FINE-
SILT AND CLAY
INORGANIC
ML
SILT
GRAINED
LIQUID LIMIT
CL
CLAY
SOILS
LESS THAN 50%
ORGANIC
OL
ORGANIC SILT, ORGANIC CLAY
MORE THAN 50%
SILTY AND CLAY
INORGANIC
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
PASSING ON THE
LIQUID LIMIT
CH
CLAY OF HIGH PLASTICITY, FAT CLAY
NO. 200 SIEVE
50% OR MORE
ORGANIC
OH
ORGANIC SILT, ORGANIC SILT
HIGHLY ORGANIC SOILS
PT
PEAT AND OTHER HIGHLY ORGANIC SOILS
NOTES: SOIL MOISTURE MODIFIERS:
1. FIELD CLASSIFICATION IS BASED ON VISUAL EXAMINATION DRY - ABSENCE OF MOISTURE, DUSTY, DRY TO
OF SOIL IN GENERAL ACCORDANCE WITH ASTM D2488-83, THE TOUCH
2. SOIL CLASSIFICATION USING LABORATORY TESTS IS BASED SLIGHTLY MOIST - TRACE MOISTURE, NOT DUSTY
ON ASTM D2487-83.
MOIST - DAMP, BUT NO VISIBLE WATER
3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY ARE VERY MOIST - VERY DAMP, MOISTURE FELT TO THE TOUCH
BASED ON INTERPRETATION OF BLOW -COUNT DATA, VISUAL WET - VISIBLE FREE WATER OR SATURATED,
APPEARANCE OF SOILS, AND/OR TEST DATA. USUALLY SOIL IS OBTAINED FROM BELOW
WATER TABLE
LIU & ASSOCIATES, INC.
UNIFIED SOIL CLASSIFICATION SYSTEM
Geotechnical Engineering Engineering Geology - Earth Science
PLATE 3
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology
August 18, 2014
Mr. Robert Setting
Rotary Club of Lynnwood
24005 — '74`x' Avenue West
Edmonds, WA 98020
Dear Mr. Setting:
Subject: Footing Drain Discharge
Two Single -Family Residences
8 1 xx — 206'h Street SW
Edmonds, Washington
L&A Job No. 14-043
Earth Science
We previously performed a geotechnical investigation of onsite storrnwater disposal for
the subject project, with our findings of the subsurface conditions of the site and our
geotechnical recommendations presented in our report titled "Geotechnical Investigation,
Onsite Stormwater Disposal, Two Single -Family Residences, 81xx — 206"' Street SW,
Edmonds, Washington," dated May 20, 2014. The subsurface conditions of the site were
explored by four backhoe test pits excavated trom. 6.0 to 8.0 feet deep. Very -dense,
cemented, glacial till deposit was encountered by these test pits at depths froth 4.0 to 5.6
feet below existing ground surface. The till deposit was overlain by layers of topsoil,
loose to medium -dense silty fine sand, and slightly silty fine -to -coarse sand soils.
Groundwater was not encountered by any of the four test pits excavated on the site.
19213 Kenlake Place NE - Kenmore, Washington 980
Phone (425) 483-9134 - Fax (425) 486-21
August 18, 201.4
Two Residences -- Rotary Club of 1-yraiwood
L&A Job No. 14-043
Page 2
Based on the subsurface condition encountered by the test pits, it is our opinion that the
amount of groundwater, if any, to be collected into looting drains of the proposed
residences will be insignificant. Therefore, it is our opinion that fbotilig drains
discharged into drywells will be adequate and acceptable to dispose water in footing
drains.
Drywells should be set back at least 5 F( --,et from property lines and 8 Leet from mtjaceritl
building Foundations. Drymells should be constructed of minimuni 3 -foot by 3 -Riot deep
round or square pits. The pit walls Should be lined with a layer oft -ton -woven filter Eabric,
such as Mirafi HONS. The pits should then bc- filled with 1-112 to 3 -Inch, (,,,]call, washed
gravel to within about 9 to 10 inches offinish grade. 'The lop of the gravel fill ShOL11d also
be covered with the same filter -fabric liner and topped with (.]call soil to the finish grade.
Footing drains should be tightlined at mininium 7.5% grade to discharge into dry -wells.
Please contact LIS if you have qLICStiOnS.
Yours very truly,
1AU & ASSOCIATES, INC.
Jrya (Ju ian) Liu, Ph.D., P.E.
Consulting Geolechnical l",righ-Leer