CU-2009-24 Staff Report with attachments.pdf
515515515
515515515515
514
515
515515515515515515
BD-2
507
515515515515515515515
525
529
531
533
535
545
553
509
515515515515515
515515515515
H
ol
ly
D
r
556
550
524
542
514
504
550
510
528
Project Site
504504504
504504504
RS-6
538
520
540
BD-3
518
548
533
548
537
539554
545
551
555
610
515
523
531
511
564
614
Homeland Dr
706
616
510
UNKNOWN
560
538
546
720
530
UNKNOWN
550
516
524
609
622
726
527
541
630630
613
630630
543
555561
565
630630
RM 1.5
630630
521
535
630630
630630
630630
H
em
lo
ck
Wa
y
630630
630630
621
520
530
550
560
570
580
590
654654
H
05010015020025
Zoning and Vicinity Map
Feet
Homeland Drive Tree Cutting
CU-2009-24
Attachment 1 Page 1 of 1
Attachment 2 Page 1 of 7
Attachment 2 Page 2 of 7
Attachment 2 Page 3 of 7
Attachment 2 Page 4 of 7
Attachment 2 Page 5 of 7
Attachment 2 Page 6 of 7
of 7
7
Page
2
Attachment
MEMORANDUM
Date:
May 20, 2009
To:
Kernen Lien, Planner
From:
Jeanie McConnell, Engineering Program Manager
Subject:
PLN20090024, Tree Cutting Compliance
515 Homeland Drive
Engineering has reviewed and approved the subject application with the following condition
to be noted in the staff report.
Consistent with the April 6, 2009 memo prepared by Group Four, erosion control measures
for tree planting shall include:
Plant using shovels; no machinery
·
Excavate the minimum area necessary to plant the tree
·
Backfill with as much native soil material as possible
·
Place 4 of hog fuel mulch in plant pits
·
Thank you.
City of Edmonds
Attachment 3 Page 1 of 1
Attachment 4 Page 1 of 1
Attachment 5 Page 1 of 1
Attachment 6 Page 1 of 2
Attachment 6 Page 2 of 2