Loading...
CU-2009-24 Staff Report with attachments.pdf 515515515 515515515515 514 515 515515515515515515 BD-2 507 515515515515515515515 525 529 531 533 535 545 553 509 515515515515515 515515515515 H ol ly D r 556 550 524 542 514 504 550 510 528 Project Site 504504504 504504504 RS-6 538 520 540 BD-3 518 548 533 548 537 539554 545 551 555 610 515 523 531 511 564 614 Homeland Dr 706 616 510 UNKNOWN 560 538 546 720 530 UNKNOWN 550 516 524 609 622 726 527 541 630630 613 630630 543 555561 565 630630 RM 1.5 630630 521 535 630630 630630 630630 H em lo ck Wa y 630630 630630 621 520 530 550 560 570 580 590 654654 H 05010015020025 Zoning and Vicinity Map Feet Homeland Drive Tree Cutting CU-2009-24 Attachment 1 Page 1 of 1 Attachment 2 Page 1 of 7 Attachment 2 Page 2 of 7 Attachment 2 Page 3 of 7 Attachment 2 Page 4 of 7 Attachment 2 Page 5 of 7 Attachment 2 Page 6 of 7 of 7 7 Page 2 Attachment MEMORANDUM Date: May 20, 2009 To: Kernen Lien, Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20090024, Tree Cutting Compliance 515 Homeland Drive Engineering has reviewed and approved the subject application with the following condition to be noted in the staff report. Consistent with the April 6, 2009 memo prepared by Group Four, erosion control measures for tree planting shall include: Plant using shovels; no machinery · Excavate the minimum area necessary to plant the tree · Backfill with as much native soil material as possible · Place 4” of hog fuel mulch in plant pits · Thank you. City of Edmonds Attachment 3 Page 1 of 1 Attachment 4 Page 1 of 1 Attachment 5 Page 1 of 1 Attachment 6 Page 1 of 2 Attachment 6 Page 2 of 2