Loading...
D. Bruce Geotech Field Report 12-21-07.pdfti Dennis M. Brum, P.E. M.S.C.E., M.B.A. Geotechnical / Civil Engineer December 21, 2007 City of Edmonds Development Services Division 121 5" Ave. N Edmonds, WA 98020 Subject: Geotechnical Inspections — Field Reports — Summary Hadfieldf New Single -Family Residence 506 a Ave. S, Edmonds, Washington City of -Edmonds No. 2006 0619 SA 8 2008 OUIL0146 CITY ED This engineering report presents the summary of ongoing geotechnical inspections for the Hadfielde new single-family residence at 506 6t' Ave. S, Edmonds, Washington. These inspections were required by City of Edmonds. REFERENCES: • City of Edmonds approved Project Plains Original Geotechnical Report by PanGeo On-site Geotechnical Inspection Reports, photographs and temporary'shoring recommendations by D_ Bruce, P.E. • Photographs INSPECTIONS: This engineer continues to perform geotechnical inspections for the Hadfielde residence, as required by City of Edmonds. City of Edmonds Inspection Items: • Excavation: All excavation for the residence itself has been completed (see photographs). As previously reported, excavation encountered extremely dense native sub - grade sands that were stable throughout the excavation phase and have since been properly backfilled. SOILS • FOUArDATKM • SME DEVELOPMENT' • /NSPECTM • DRAINAGE + DESIGN & PERMIT • LEGAL P.O. Box 55502 • Shoreline, WA 98155 • (206) 548-9217 • FAX (206) 546-8442 "City of Edmonds Development Services Division Re: Hadfielde December 21, 2007 Page 2 NOTE: Future excavation is anticipated in conjunction with the extensive landscaping, which is understood to entail rockeries andlor retaining walls. Inspections continue. • Temporary Shoring: The temporary Eco -Block shoring performed properly with no adverse impacts. All Eco -Block shoring has been successfully backfilled. Foundation Bearing: Previously inspected and approved. • Subsurface Drainage: All subsurface drainage has been properly installed and is approved. NOTE: The future work for this site will entail extensive perimeter stabilization walls (rockeries, keystone blocks, etc.). This engineer will perform inspections to verify the appropriate "drainage zone" is installed in conjunction with the wall. • Rockeries: Not yet. This engineer anticipates extensive perimeter landscaping and rockeries. • Backfill: All backfill for the residence itself has been successfully completed and approved. • Erosion Control — Site Monitoring: Ongoing inspections have verified proper performance of the temporary erosion control measures: rocked construction entrance, confinement of all work within property lines, proper maintenance of siltation fencing, and diligent cleanup. NOTE: A site inspection during the extreme rains of December 3, 2007 verified site stability with no adverse erosional impacts. SUMMARY: • Ongoing geotechnical inspections have verified proper completion of items to date (December 21, 2007). City of Edmonds Development Services Division Re: Hadf€elde December 21, 2007 Page 3 • Geotechnical inspections continue, as required. If there are any questions, do not hesitate to call_ EXPIRES 1. �� DMB:abj cc: K. L. Enterprises r Dennis M. Bruce, P.E. Geotechnical / Civil Engineer