Loading...
Dayton St - 628_SFR_BLD20080172 Cornell 2.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 2008-0172 May 23, 2008 Project Name/Address: Cornell SFR 628 Dayton St Contact Person/Address/Fax: Paul Van Slyck Fax: 425-303-8056___ Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1.Done. 2.Done. 3.Sidewalk Replacement Requirements:  Done.  Done.  Okay. *5/23/08 Clarify if intending to construct sidewalk with full panels to curbline as currently exist or if adding landscape strip as adjoining properties frontage. 4.Grading: *5/23/08 Grading is still unclear. Contours do not tie in to existing topo lines, some just end, at one point a 98’ line just connects up with a 100’ line. On the west side of the house is a 98’ circle then around it is area shown as 95’. Please clarify and revise plan so all proposed contours tie in to existing contours or labeled walls or other barriers are shown to explain changes.  Please provide large size grading plan. Show existing and proposed topo lines in different line types for clarity. Show grading in alley too, if any.  A site visit showed rear garage with relatively level floor. Plans appear to show a slope in that area, please clarify.  Site visit also showed a considerable amount of grading would need to be done to bring the yard level or near level with garage area and alley. Please revisit grading calculations for accuracy.  Please note bottom of footing(BOF) elevation on site plan so grading calculations can be verified. 5.5/23/08 Not Done. Please show where proposed driveway entrance from alley begins and ends. Please note actual width. (A driveway entrance to a single home can be a minimum of 10ft wide to a maximum of 12ft wide per Edmonds Community Development Code.) DATE FAXED/E-MAILED 6/30/2017 PAGE ___ OF __ 12 ***There now appears to be retaining walls on either side of the driveway? If so, please label on plans and provide top and toe elevation of walls at each end and at every 2ft of change. If not, please clarify what the lines are intending to show. 6.Done. 7.Done. 8.Done. 9.Done. 10.Done. 11.Done. 12.5/23/08 Not Done. 6” sewer clean out is required at the property line with locking lamphole cover and 4- 6” clean out is required at house. 13.5/23/08 Not Done. (See our Traffic Control Handout for guidance) Provide Traffic Control plan for temporary alley closure for sewer/grading or other work. (provide drawing) 14.5/23/08 Not Done. (See our Traffic Control Handout for guidance) Provide a Traffic Control plan for temporary lane diversion for work on Dayton St. (The driveway cut removal and the sidewalk replacement will require the shoulder to be closed at the very least. Please provide traffic control plan (drawing) for this possibility) 15.Done. Storm Engineering Review 16.Done. 17.Done. 18.Done. 19.Done. 20.Done. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 6/30/2017 PAGE ___ OF __ 22