Loading...
DEA Vault Review Invoice.9.22.17 (2).pdfW O DAVID EVANS ANDASSOCIATES INC. SEP 2 8 2017 NGINEERING GIVISI01 Jeanie McConnell 406830 City of Edmonds September 22, 2017 121 Fifth Avenue North Edmonds, WA 98020 1 of 2 Work Beginning 08/13/2017 through 09/09/2017 Project: COED0000-0011: On Call 2017 Civil and Struc Svcs for City of Edmonds Services provided included reviewed calculation and plans for Prospect Lane storm detention vault, and returned them to the City with review comments on, 7/31/17 and 9/5/17. PROFESSIONAL SERVICES Contract Previously Total Invoice Amount Billed To -Date Due This Invoice Prospect Lane Storm Detention Vault 2,500.00 0.00 2,487.23 2,487.23 SUBTOTAL Invoice Total $ 2,500.00 $ 0.00 $ 2,487.23 $ 2,487.23 M`TTUU.�. 2.487.23 Total Previous TOTAL This Unpaid NOW Invoice Invoices DUE 2,487.23 0.00 2,487.23 14432 SE Eastgate Way, Suite 400, Bellevue, WA 98007 Phone: 519.519.6500 Facsimile: 425.519.5361 Invoice Number 406830 Invoice Date September 22, 2017 PO Number Project COED0000-0011: On Call 2017 Civil and Struc Svcs for City of Edmonds Current Current Hours Rate Amount Contract Work Performed Administrative Assistant Mary Jo Reynolds 0.50 98.28 49.14 Administrative Assistant Setheny How 0.10 84.20 8.42 Bridge Engineer Anne Petrich 4.00 94.17 376.68 Engineering Manager Kirk A. Harris 0.50 224.51 112.26 Project Administrator Jessica A. Taylor 1.00 104.27 104.27 Project Administrator Vickie L. Elwell 0.30 111.10 33.33 Senior Bridge Engineer Mark C. Frymoyer 12.50 144.25 1,803.13 Subtotal Contract Work Performed 18.90 2,487.23 Invoice Total Invoiced by: Kirk A. Harris $2,487.23 14432 SE Eastqate Way, Suite 400 Bellevue WA 98007 Phone: 425.519.6500 Facsimile: 425.519.5361 Submit payment to: Dept LA 24340 Pasadena CA 91185-4340