DEMO 75% form.docxThis form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value
of the existing home’s replacement cost, the structure will be required to be rebuilt to the standards of new construction.
Replacement cost of existing home $______________________
How was the value determined? __________________________________________________________
Component
Value of Existing Component
Percentage removed
Replacement cost of removed component
Notes
Foundation
Floor Framing
Floor Insulation
Wall Framing
Wall Insulation
Siding
Roof Framing
Attic Insulation
Windows
Doors
Plumbing
Electrical
HVAC
Drywall
Cabinets
Deck
Other
Total
% of total removed
Percentage of Removed equals ‘Total of Column 4 divided by Full Replacement cost’ equals_________%
Owner_________________________________________________________Date________________
Contractor______________________________________________________Date________________