Loading...
DEMO 75% form.pdfAddress: Home Owner: Contractor: Permit # This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. Replacement cost of existing home $ How was the value determined? Component Percentage to Value of remaining Condition Notes remain component Foundation Floor Framing Floor Insulation Wall Framing Wall Insulation Siding Roof Framing Attic Insulation Windows Doors Plumbing Electrical HVAC Drywall Cabinets Deck Other Total Owner Date Address: Home Owner: Contractor: Permit Contractor Date