Loading...
Design Review Request for Information-1.docxMEMORANDUM Date: December 3, 2018 To: Mike Clugston, Planning Division From: JoAnne Zulauf, Engineering Technician Subject: PLN201180066–Design Review Highway 99 Zone Pedestrian Walkway Modification Doug’s Mazda and Hyundai– 22130 Highway 99 General Engineering Review: The following comments are provided by the Engineering Technician, JoAnne Zulauf. Please contact JoAnnevia email atJoAnne.Zulauf@edmondswa.govwith any specific questions you may have regarding his comments. Frontage Improvements and Access: Please show all PUD poles and any other utility appurtenance within and along the Highway 99 frontage. If any pole or other appurtenance (hydrants, standpipes, meters etc.) will need to be moved to accommodate a 5 ft clear pedestrian path, please show current location and the proposed location of this pole or other object. The CG zone requires 7’ to 10’ sidewalks with street trees along the frontage on Highway 99. In order to attain this requirement, sections of the pedestrian access are shown on private property. An easement dedicated to the City of Edmonds will be required for those portions of sidewalk. Show new wsdot compliant curb ramps at each access entrance.