Design Review Request for Information-1.docxMEMORANDUM
Date:
December 3, 2018
To:
Mike Clugston, Planning Division
From:
JoAnne Zulauf, Engineering Technician
Subject:
PLN201180066–Design Review Highway 99 Zone
Pedestrian Walkway Modification
Doug’s Mazda and Hyundai– 22130 Highway 99
General Engineering Review:
The following comments are provided by the Engineering Technician, JoAnne Zulauf. Please contact JoAnnevia email atJoAnne.Zulauf@edmondswa.govwith any specific questions you may have
regarding his comments.
Frontage Improvements and Access:
Please show all PUD poles and any other utility appurtenance within and along the Highway 99 frontage. If any pole or other appurtenance (hydrants, standpipes, meters etc.) will need
to be moved to accommodate a 5 ft clear pedestrian path, please show current location and the proposed location of this pole or other object.
The CG zone requires 7’ to 10’ sidewalks with street trees along the frontage on Highway 99. In order to attain this requirement, sections of the pedestrian access are shown on private
property. An easement dedicated to the City of Edmonds will be required for those portions of sidewalk.
Show new wsdot compliant curb ramps at each access entrance.