Loading...
Design Review with attachments.pdf`11c. 18y1J To: From: Date: Subject: CITY OF EDMONDS 1215 th Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 # Web: www.edmondswa. ov DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION ADMINISTRATIVE DESIGN REVIEW Street file for 22617 76th Ave. W. (Factory Direct Tire) Sean Conrad, AICP, Associate Planner December 8, 2015 Staff Decision for BLD20151455 (Carport) Project Proposal Construct a 1,560 square foot carport on the north side of an existing building currently occupied by Factory Direct Tires. The proposed carport will provide covering for existing parking spaces used for tire repair and replacement. Figure 1: View of the north side of the existing Factory Direct Tires warehouse. The proposed carport will be located between the middle garage door and the garage door on the far right in the photo below. Page 1 of 3 Property Owner/Applicant Nash Alibhai 2261776 th Avenue West Edmonds, WA 98026 Design Review Process As part of the City's review of the building permit referenced above, design review is required pursuant to ECDC 20.10. The project is located in the General Commercial "CG" zone and is therefore subject to district -based design review applying the design standards found in ECDC 16.60.030 and the policies contained in the specific section of the Comprehensive Plan addressing the Highway 99 Corridor. Since the carport is less than 60 feet in height, design will be conducted by staff as a Type I decision. Findings & Conclusions 1. Scope. According to ECDC 20.10.020, design review is intended to apply to all development including any improvement to real property open to exterior view, including but not limited to buildings, structures, fixtures, landscaping, site screening, signs, and parking lots. Since the carport is proposed on an existing developed site, design review is focused on site design and layout. 2. Environment. The project is exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3) because the carport is less than 4,000 square feet in size. 3. ECDC 16.60 CG Zone Compliance. Site Development Standards (ECDC 16.60.020). There is a required 4' landscaped street setback area along 76th Avenue West. The carport will be located on the north side of the existing warehouse building on the property, towards the east end of the site. This location meets the required setbacks. The maximum allowed height is 60'; the carport is approximately 16' tall. b. Design Standards (ECDC 16.60.030). The carport is a basic structure, with several supporting columns and a roof (Attachment 1). The carport will be located on the north side of the existing warehouse building, located on the east side of the property. There is an office building located between the proposed carport location and the adjacent street, 76th Avenue (Attachment 2). The existing office building provides sufficient screening of the carport from the street. 4. Comprehensive Plan. The site is within the "Highway 99 Corridor" in the City's comprehensive plan and associated land use map. The proposed project shows an effort towards the following Comprehensive Plan policy for the Highway 99 Corridor: Page 2 of 3 C.2 New development should be allowed and encouraged to develop to the fullest extent possible while assuring that the design quality and amenities provided contribute to the overall character and quality of the corridor. Where intense development adjoins residential areas, site design (including buffers, landscaping, and the arrangement of uses) and building design should be used to minimize adverse impacts on residentially -zoned properties The proposed project is consistent with the above policy of the comprehensive plan. The proposed carport will contribute to the on-going needs of the existing tire company while its location is tucked behind an office building, away from the adjacent street and not visible from Highway 99. Decision Staff finds that the proposal is consistent with site development standards and design criteria in ECDC 16.60 and in the Comprehensive Plan. Therefore, the design of the carport in permit BLD20151455 is APPROVED. I have reviewed the application for compliance with the Edmonds Community Development Code. Sean Conrad Appeals December 8, 2015 Date Design review decisions by staff are only appealable to the extent that the applicable building permit or development approval is an appealable decision under the provisions of the ECDC. Design review by staff is not in itself an appealable decision. Page 3 of 3 � � 2 � 3 m � � ami mmm,/am &GVUS9. ¥ Lam &m2@n msj F) k _ w / k / 2 w / g g a zm e UJ \ z F) k _ w / k / 2 w / g g a zm e x�«—BFF c�a axuxe eels; am 'sMwm Sn 3tINNrtl pxYf51 ppb SW31S,S JNIQIIne 13315 VIdWA10 ' L &JOO S1NM N3ANI VHSA1tY My arrvxaparoxe 'YMw Ly a g a ul C3 � ydy ve w r d re .i w y ^ry S— ,..._...,.—,....� �... w.,_.._...................._ p II � f I I I I I I I L I ! IC V V I I I I Im I J m ryNry ANN Z < qW I Ip LL II 4'� 'D000 gpV�p p 1�1 it w I I y E.�,r C� 06.Y f I l I � I I� I I I I I I M I I � ! I I I n W ,�h-✓JOOC�k _ _ ,�' # www QI �0« Wd 1,4 4 N M" q ' L &JOO S1NM N3ANI VHSA1tY My arrvxaparoxe 'YMw Ly a g a ul C3 � ydy ve w r d re .i w y ^ry S— ,..._...,.—,....� �... w.,_.._...................._ p II � f I I I I I I I L I ! IC V V I I I I Im I J m ryNry Z < qW I Ip LL II gpV�p Z 1�1 it w I I y f I l I � I I� I I I I I I M I I � ! I I I "1 �U i���-'�. , � f uil �! l°