Dick's Drive-In pre-con.pdfCITY OF EDMONDS MT G DATE: _IW-it3 201I PRE -CONSTRUCTION MEETING Commercial TIME- 1.30pin Project Name: Dick's Drive -In Site Address: 10 2129Hi, hway 99 . .. —1 - — Developer/Owner: Dick's Drive -In / Dick S ady en Frazier. -General Mpan ea Contractor: SchuchartK�qrporation 1-C-allsen Arhitect re. Modern Sewer COEP Project Contact/Phone /Fax H.: Ken Frazier 206.634.0300h P lapse, sen 206.382.1679' 2 Permit or Tracking H: bid2011O02L(hlqgllngZRIIRQit sew K),,,,,Kq,�qllo123 (water meter) Right. -of -Way Permit #: N/A City representatives: Planning Division E Building Division H Fire Department Water Division Sewer Division [A Storm Division Edmonds Utilities Consortium mernbers: 0 PUD F-1 Pilchuck/PSE F] VerizonNW❑Comcast ❑ OVWSD Individuals present at meeting; Handouts/Reference matenial lIxovided: Erosion Control standards ❑ Engineering Inspection Information [J Side Sewer In 6o F Water Service Line Spec. [] Notice: Illegal Discharges to Stormwater System (6/28/04) F-1 Water Outage Policy Construction Contractors B,MP's 0 Traffic Control Requirements Street Standards 0 Rockery 0 Other 0 Haul Routes E] Retaining Wall Pre -Con Meeting, Page 1. of 4 5/13/22011, 1:30pin INSPECTIONS: Engineering Inspection Line: 425-771-0220, ext. 1326 Requests for final engineering inspection must be made 48 hours in advance. All other engineering inspection requests must be made prior to 7kim each workday morning to receive an inspection that day. * Contractor/Developer must call for inspections. Leave detailed information oil the inspection request line stating the work planned for the day. The inspector will try to time inspections in conjunction with the construction activity for the day whenever possible. Call the Development Services Department at 425-771-0220 and inform the front desk of inspection cancellations. Do not call the inspection line to cancel an inspection request for that day. * Large development projects are required to call the inspection line daily to keep the inspector informed of the work planned on site for the day, whether an inspection is required or not. * City of Edmonds inspectors will provide inspections as requested and may stop by periodically as deemed necessary. * Special inspections performed by licensed engineers/engincering firms does not eliminate the requirement to have an inspection performed by a City inspector. All test reports created by the special inspector must be provided to the City within one week of testing. * All sections of pipe arc to be inspected after installation and prior to backfill or as determined by inspector on a project specific basis. * All connections (i.e. Joints, Tees, CB's, MEll's, etc.) and thrust blocks must be inspected prior to backfill. Mobilization and Erosion Control City of Edmonds Standard Details: EI,1,EII,I,EI.2,E1.3, Filter fabric fence, quarry spall rock construction entrance, filter socks in CB's, sediment pond, dust control, covering of stockpiles, etc. All erosion and sedimentation control measures are to be implemented at the start of the project and shall be maintained for the duration of the project. Erosion control measures shall remain in place until all exposed soils are vegetated. Exposed soils shall be covered within 2 days during the winter months (Oct. to April) and 7 days during the summer months (April to Oct). Staging of materials, job shack & equipment within the right-of-way (ROW permit required). Inspection for positive flow or slope required per plans, approved material type, proper bedding, etc. Pre -Con Meeting, Page 2 of 4 5/13/201.1, 1:30pin E:1 Footing Drains The footing drain shall not cormect to the storm. detention system. Connection shall be made to the outfall side of the detention control structure. For subdivisions, a stub, to each lot is required. Drainage Detention System Construct per approved plans. Bed in pea gravel or crushed rock to springline. Verification of control structure orifice's required prior to installation. Mudding required inside and out at all pipe connections to CBs and MH's as well as each riser and pick holes. 'El Sanitary Sewer — main extension lateral side sewer Core drill, Romac inserta-tee - inspection required at time of core drill; coupon to be verified. Manhole installation: core -n -seal boots — mudding required on inside of manhole Lip to approximately the middle of the pipe (channel level) and also inside the entire boot. Pressure testing: Air test at 4 PSI for 15 minutes. Channeling TV records El Water System — main extension fire line domestic service line Water Outage Policy (12/12/03) Inspection of trench and valve cluster required by 11:30am the day before the outage, Thrust blocking per City standards — inspection required prior to backfill. Use of water from a hydrant requires a hydrant meter w/ backflow device, to be obtained from City of Edmonds Public Works Department — 425-771-0235. Install jumper off City water main to test new water system prior to connection to City main. Pressure testing: Thrust blocks must be in place a minimum of 3 days prior to testing. Main line: Test at 225 PSI for 2 hours Fire line: Test at 200 PSI for 2 hours Purity testing: Contact Public Works Water Quality Control Specialist —425-771-0235 Backflow prevention: Contact PW Water Quality Control Specialist — 425-771-0235 City crew shall operate all existing valves except in emergency situations. Form Inspections Curb/gutter and sidewalk form inspections required prior to pour. City inspector must give approval of forms before pour. Monolithic pours are not permitted. Pre -Con Meeting, Page 3 off 5/13/2011, 1:30pni Existing failed or damage sections of curb/gutter and sidewalk are to be replaced as deters pined by the City inspector,. Traffic Control flans must be approved for use prior to implementation. approved plan and designated haul route to be followed. Certified daggers required. E] Asbuilts Provide City of Edmonds, with "electronic drawings" of asbuilts. French Patch/Compaction Compaction tests required in City right-of-way, 95% compaction must be met and reports must be submitted to the City prior to paving. CDF is not an approved backfill material. Noise Restrictions Construction hours are M. -F, lam -bpm and. Saturdays, 1Oam-6pm. No work Sundays and. Federal holidays. Engineering Comments: Planning Comments: Public Works Comments: EUCs Comments: Contractor/Developer Comments: Pre -Con Meeting, Page 4 of 4 5/1.3/201.1, 1:3opin