Loading...
Drainage Assessment 8.25.16.pdfE S rou R1a ft I„ IDI " �T err( or-PEMNO INSIGHT ENGINEERING CO. . Applicant: Echelbarger Investments, LLC 4001 198th St. SW, Suite 2 Lynnwood, WA 98036 (425) 673-1100 Drainage Assessment For Paradise Lane SFR Prepared for City of Edmonds 121 5th Ave North Edmonds, WA 98020 425.771.0220 Project Site Location: 523 Paradise Lane Edmonds, WA 98020 Tax Id: 00646500000300 'IECO Project: 16-0768 Preparation Date: August 22, 2016 Report created by: Jacob Mealey Approximate Construction Date: October 1, 2016 Contact: IECO P.O. Box 1478 Everett, WA 98206 425-303-9363 P.O Box 1478 • Everett, WA 98206 • P: 425.303.9363 F: 425.303.9362 • info@insightengineering.net r Iz ` 7eiol 08/23/2016 Project Summary The proposed project Paradise Lane is located at 523 Paradise Ln, Washington. More generally, the site is located in Section 25, Township 27 North, and Range 3 East of the Willamette Meridian in Snohomish County, Washington. The project is considered a Category 1 Small Site Project per handout #E72 B. The project is located within the Willow Creek watershed basin. The project is exempt from water quality and flow control. A 12 -ft diameter drywell per handout #E72 B will provide onsite stormwater management for the site. Refer to the following pages for the minimum requirements summary and the drainage calculations. Minimum Requirements Summary MR: Minimum Requirement SWPPP: Stormwater Pollution Prevention Plan MR #1 Preparation of a Stormwater Site Plan: The Stormwater Site Plan preparation follows the City of Edmonds requirements. MR #2 Erosion and Sediment Control Plan: Refer to the Grading and TESC Plan. MR #3 Source Control of Pollution: No source control pollutants pertains to the proposed project, therefore no BMP's are required after construction. MR #4 Preservation of Natural Drainage Systems and Outfalls: Infiltration is proposed therefore the project will not negatively affect the downstream path. MR #5 On-site Stormwater Management/Low Impact Development Techniques: A 12 -ft diameter drywell per handout #E72 B will provide onsite stormwater management for the site. BMP T5.13 Post -Construction Soil Quality and Depth is proposed for additional stormwater management for the site. MR #6 Runoff Treatment: N/A. Water quality is exempt because the PGIS is 574 SF which is less than the threshold area of 5,000 SF. MR #7 Flow Control: N/A. The project results in creating less than 5,000 SF of impervious surfaces therefore flow control is exempt for the project. MR #8 Wetlands Protection: N/A. There are no wetlands located on the site. MR #9 Operations and Maintenance: Refer to the attached pages for the Operations and Maintenance Manual. MR #10 Offsite Analysis and Mitigation: All the runoff from the site will be infiltrated onsite therefore a detailed downstream analysis was not performed. MR #11 Financial Liability: This will be provided to the city upon approval. Drywell Sizin Impervious Areas: Roof = 2,394 SF (0.06 Acres) Parkina and Sidewalk = 962 SF (0.02 Acres) Total Impervious = 3,356 SF (0.08 Acres) A 12 -ft dia. drywell that is 4 -ft deep is proposed for the site. The drywell was sized using Table 5. of handout #E72 B. With an infiltration rate of 2 iph a sizing factor of 3% was applied: Drywell Area (square feet) = Impervious Area (square feet) x Sizing Factor (%)/100 Drywell Area (square feet) = 3,356 SF x 0.03 = 100.68 SF FLAD= D _ rua�.t,sr _ 11.32' 12 -ft diameter drywell is proposed