Loading...
Drainage Plan.pdf`,� • MWISMIN for Christopher & Merin Mione 19011 Olympic View Dr. Edmonds, WA 98020 SITE LOCATION: 19011 Olympic View Dr. Edmonds, WA 98020 Tax Parcel: 00434600007800 Prepared by: Philip D. Mann, E.I.T. Checked by: Joseph M, Smeby, RE, Job No: 14-0608 July, 2014 M4 6 00191 TABLEOF CONTENTS.....................................................................................................1 LISTOF FIGURES.............................................................................................................2 1. INTRODUCTION & SITE CLASSIFICATION..............................................................3 2. STORMWATER SITE PLAN .................................................... ,.............................4 3, SWPPP NARRATIVE..................................................................................................4 A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT....................................5 B. SWPPP MINIMUM ELEMENTS.................................................................................5 4. WATER POLLUTION SOURCE CONTROL...............................................................7 5. PRESERVATION OF NATURAL DRAINAGE SYSTEM..............................................7 6. ON-SITE STORMWATER MANAGEMENT................................................................7 7. RUN-OFF TREATMENT.............................................................................................8 8. FLOW CONTROL.......................................................................................................8 9. WETLANDS PROTECTION........................................................................................8 10. OPERATIONS AND MAINTENANCE MANUAL...........................................................9 11. OFFSITE ANALYSIS AND MITIGATION......................................................................9 12. FINANCIAL LIABILITY. ................................................................................................ 9 APPENDIX A - STORMWATER CALLS, SOILS, PHOTOS, M&O APPENDIX B - GEOTECH REPORT Mione 2 Lot Short Plat 14-0608 July, 2014 Page 11 ITEM PAGE FIGUREVICINITY MAP ....................................... ..................... ...... .................. 1O FIGURE EXISTING DRAINAGE BASIN MAP ...................................................... 11 FIGURE DEVELOPED DRAINAGE BASIN MAP ................................................. 12 13 FIGURE SNDH(}M|SHCOUNTY 80LGK�AP—'.—..---.—.------~.FIGURE 5 UP STREAM/DOWN STREAM TRIBUTARY AREA MAP ........................ 14 Mione 2Lot Short Plat 14-000 ju|y.2O14 Page This document is intended to provide engineering information necessary to support the building permit application submittal to the City of Edmonds for the new SFR and driveway for this short plat. The current parcel is approximately 1.23 acres. The existing site consists of an asphalt driveway, house, pool, pool house and covered parking area.. No existing impervious structures will be removed or replaced for this project. The western parcel will total approximately 15,000 sf and approximately 57% of the new parcel will be cleared/graded to construct the proposed improvements. Access to the site will be from the existing roadway, Olympic View Dr., to the west along the western property line. The total area of disturbance including clearing and grading does not exceed 3/4 acres and the new total impervious surfaces does not exceed 5,000 sf. Therefore, this project is classified as a Category 1 Small Site Project. This classification was completed using figure 2-1 of the 2010 Storm water Code Supplement to Edmonds Community Development Code Chaper 18.30. Due to the existing soil conditions, on-site infiltration shall be used for this project. As a result only minimum requirements 1-5, 7-9, and 11 will be required to be reviewed and addressed if applicable. This proposed project will create approximately 4,534 sf of new impervious surfaces including the proposed SFR and driveway. No impervious surfaces will be considered removed or replaced for this project. All of the new impervious surfaces, will be mitigated using on-site stormwater management BMPs including dry wells and amended soils; both LID techniques. The site is located at 19011 Olympic View Dr, Edmonds, WA 98020, and in Section 13, Township 27N, Range 3E, Willamette Meridian, See Figure 1 - Vicinity Map.. Mione 2 Lot Short Plat 14-0608 July, 2014 Page 3 APR1L2010 Figure 2-1: Project Classification Start' Does the project involve 1- acre or more of land- disturbing anddisturbing activity? Is the project part of a larger common plan of development or sale where the total disturbed area for the entire plan will total 1 -acre or more of land -disturbing activity? Does the Project involve one or more of the following: 2,000 square feet or more of new impervious surface, replaced impervious surface or new plus replaced impervious surface? OR 7,000 square feet of land -disturbing activity? OR 50 cubic yards or more of either grading, fill, or excavation as defined in Chapter 18.40.000 ECDC? � P< Minor Site Project: Read Chapter 3 and see Chapter 6 for requirements Large Site Project: Read Chapter 3 and see Chapter 4 for requirements Does the project create or add 5,000 square feet of new impervious surface, replaced impervious surface or new plus replaced impervious surface? OR es Convert'/ acre or more of native vegetation to lawn or landscaped area OR Through a combination of creating effective impervious surface and converted pervious surfaces, causes an increase of 0.1 cubic feet per second in the 100 -year flow frequency from a threshold discharge area as estimated using an approved model? No Category 1 Small Site Project: Read Chapter 3 and see Chapter 5 for requirements r Assumes the project in question meets applicability requirements of ECDC18,30,030. d/ ;08-U41d0-ODU enmards tmmrnvYersupp/anent flnaG doo Category 2 Small Site Project: Read Chapter 3 and see Chapter 5 for requirements 2,0 CLASSIFYING PROJECTS 6 As noted in Section 1 of this report this project is classified as a Category 1 Small Site Project. Therefore, this drainage design has been prepared to address the requirements contained in the City of Edmonds Stormwater Supplement and applicable handouts. This document is intended to provide the supporting information to justify the BMPs used and to detail how the design of the selected BMPs meet the required standards. For this project some LID techniques were used to aid in minimizing the projects impacts to the neighboring properties and downstream system. The new NPGIS runoff will be infiltrated on-site and the soils within the proposed areas of disturbance will be amended to landscaping conditions as per BMP T5.13 out of the 2005 DOE Manual. This is done to reduce the stormwater runoff generated by the proposed impervious surfaces. Clearing, grading, and temporary erosion and sediment control plans have been prepared as part of the drainage plan drawings. However, since a construction site is dynamic it will be necessary to reassess the erosion control BMP's during construction and install additional measures when necessary. Proposed temporary measures possible for this project will include the following BMP's: ® Installation of stabilized construction entrance. ® Retention of Existing Vegetation ® Straw mulch, hydroseed or other mulching and planting method to stabilized unworked areas, ® Silt fencing if necessary Permanent measures to reduce or eliminate erosion or water quality degradation will include the following BMPs: ® Paving all traffic areas (concrete) ® Permanent landscaping in pervious areas. ® Limiting cut and fill slopes to 2:1 maximum and 3:1 maximum where exposed to standing water. ® Routine maintenance and inspection of the grounds and response to developing problems. The listed erosion control BMP's will be engineered for anticipated conditions in compliance with Snohomish County and DOE guidelines, With proper installation, maintenance and inspection the proposed BMP's should result in minimal impact to the surrounding environment. The County retains the authority by code to require additional measures should the existing measures prove insufficient. Mione 2 Lot Short Plat 14-0608 July, 2014 Page 4 Area proposed to be cleared/worked: 8495 sf = 0.20 acres Average slope for the site (w/in the area of disturbance): 18% Erosion Hazard of Soil Moderate Critical Areas downslope No Site is upstream of an ESA Stream No Based on the above information and the fact that the site will retain so much existing vegetation and construction site runoff will filter through the soil, and that if site conditions warrant, additional BMP's can be implemented as corrective measures the Risk Category for this site is Low Risk. k 1: Mark Clearing Limits The first step in the "Construction Sequence" included on the clearing and grading plan sheets is for the limits of clearing to be flagged and to have construction fencing placed along the limits prior to any other construction activity. 2: Establish Construction Access The SWPPP calls for the proposed construction entrance to be installed as the second step after the staking of clearing limits. A detail is provided on the plans. 3: Control Flow Rates This project is below the thresholds requiring flow control for the project. 4: Install Sediment Controls This site and SWPPP proposes to construct/maintain a construction entrance, retained vegetation and silt fencing. These features are intended to minimize the opportunity for sediment to leave the site via stormwater or on vehicles. The construction of these features is one of the first items required in the "Construction Sequence". Mulch will also be used on the exposed soil as necessary to limit erosion. 5: Stabilize Soils The "Construction Sequence" calls for the stabilization of soils that remain unworked for certain lengths of time based on the time of year. Stabilization techniques may include but not limited to mulching, plastic sheeting or hydroseeding, notes have been added to the plan regarding protection for the stock pile area if necessary. A stockpile area has been identified on the SWPPP and is setback a minimum of 100 -feet from any down slope property line. 6: Protect Slopes All disturbed slopes on site during construction are required to be protected with mulch or other means as specified in the construction sequence. No concentrated runoff or significant amounts of sheet flow will be directed to new cut or fill slopes during construction Mione 2 Lot Short Plat 14-0608 July, 2014 Page 5 7: Protect Drain Inlets No new or existing culverts are proposed or affected by this project. 8: Stabilize Channels and Outlets No new channels or outlets are proposed for this site. 9: Control Pollutants No outside chemicals are expected to be necessary for the construction of this project. All vehicles working on and around the site would need to meet the State requirements for emissions. 10: Control DeWatering DeWatering will not be necessary for this project. However, the existing vegetation retained on site would be available to spread any water from construction for disposal. 11: Maintain BMPs The construction supervisor will be responsible for maintaining all BMPs during construction and working with the City to relocate or add BMPs as necessary as site conditions change. 12: Manage the Project It will: be the responsibility of the Contractor and Developer to manage this project and coordinate with the City Inspector and Engineer. Inspection and Monitoring: Site inspections shall be done by a person who is knowledgeable in the principles and practices of erosion and sediment control. The person must have skills to first assess the site conditions and construction activities that could impact the quality of stormwater, and second assess the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. Maintaining an Updated Construction SWPPP: The construction SWPPP shall be retained on-site or within reasonable access to the site. The SWPPP shall be modified whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the state. The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified, Revisions to the SWPPP shall be completed within seven days following inspection. Mione 2 Lot Short Plat 14-0608 July, 2014 Page 6 The City of Edmonds Stormwater Supplement and DOE Drainage manual was reviewed to determine if the proposed land -use for this project required any site specific source control BMPs to be constructed. SFR projects are not listed as a proposed use that requires source control. Therefore, no site/development specific source control BMPs are required for this project. The runoff from the on-site basin drains to the west towards the western property line and the right-of-way of Olympic View Dr. It was determined that the runoff from the site improvements will be both infiltrated and dispersed on-site. The proposed driveway will disperse flows over amended soils first, followed by undisturbed soils. This will allow the maximum amount of runoff to be treated and naturally infiltrate into the on-site soils. By not grading or compacting the majority of the pervious surfaces to remain after construction in the area of disturbance a maximum amount of site runoff from the developed project will be absorbed and infiltrated into the existing on-site soils. The on-site soils for this project were verified by Andrew Glandon and Jamey Battermann of South Fork Geosciences, The on-site soils were found to be fill material on top of Vashon Advance Outwash. The depth to the top of the Vashon till layer is between 0-9 feet below the existing grade. Refer to the Geotechnical report, soil logs and locations of the soil logs within Appendix `A'. The soils were also identified with the USDA Web Soil Survey, The Soil survey shows the on-site soils within the proposed area of disturbance to be Alderwood Gravely Sandy Loam. The soil unit is gravelly ashy sandy loam. Refer to Figure 4 to view Soils map. This project proposes to construct approximately 1,872 sf of new plus replaced roof surfaces, The geotech recommends that infiltration of the stormwater roof runoff should be infiltrated on-site. This will be done by the installation of drywells. The drywells have been designed as per section 3.1,1 of the 2005 DOE Manual, The proposed NPGIS will be infiltrated by the use of 2 dry wells and each dry well will be limited to a maximum of 1,000 sf of impervious surfaces. The dry wells will be located to the west of the proposed SFR. A total of approximately 2,662 sf of PGIS is proposed for this project. The runoff generated by the impervious driveway surfaces will be dispersed on-site via amended soils along the length of the downhill edge of the proposed driveway. Dispersed flows will have a minimum 25 foot vegetated flow path before flows leave the project parcel. All future pervious surfaces will be amended as required by the City standards. Therefore, all dispersed flows will pass over the amended soils prior to being collected and discharged offsite. Mione 2 Lot Short Plat 14-0608 July, 2014 Page 7 This project proposes to construct less than 5,000 sf of new PGIS and is therefore exempt from any run-off treatment. For this project LID methods will be used to address the runoff impacts from the proposed improvements. In order to protect the downstream systems to the west it is necessary to use an LID methods designed for this site. The NPGIS will be infiltrated on-site via 2 dry wells and the disturbed soils will be amended as per BMP T5.13 out of the 2005 DOE Manual By maximizing the use of the LID methods and preparing a site plan that provides the space necessary on this lot, the over all drainage impacts to the downstream system and surrounding area can be reduced. Therefore, this design has been laid out to provide an opportunity for site runoff to be absorbed back into the soil layer to aid in attenuating flows and providing some groundwater recharge while protecting the existing neighboring properties from flooding or erosive impacts. . .: .. • -.. __ G This project will not impact any wetland on-site or downstream of the project site. Mione 2 Lot Short Plat 14-0608 July, 2014 Page 8 i •' .- �; Y The Property Owner will be responsible for maintaining the stormwater and landscaping facilities within this development. Included in this manual are checklists for each feature specific to this project. Copies should be made of the checklists as necessary during routine inspections and required maintenance, Specific problems can be recorded along with the appropriate action taken. These checklists are a guide for inspections and maintenance, The frequency of the inspections/maintenance is identified in the left hand column with the following abbreviations: A = Annual (March or April preferred) M = Monthly S = After Major Storms (Use 1 -inch in 24 hours as a guideline) Routine inspections and maintenance will improve the long-term performance of the stormwater facilities. If at any time you are unsure if a problem exists or how to address a specific problem contact a Professional Engineer. Refer to Appendix A for a list of each facility to be maintained and the appropriate maintenance checklist. Runoff from the proposed disturbance area of the project parcel sheet flows to the west over moderately sloped to steep landscaping and leaves the site over the western property line. The runoff enters the right -of way of Olympic View Drive and is captured by a catch basin opposite of the adjacent parcel to the north, and is part of the City of Edmonds stormwater conveyance system, This catch basin directs runoff north to a series of catch basins and pipes. The outfall of the conveyance system could not be verified in the field, but it is expected that the receiving water body is the Puget Sound. See Figure 5 for a depiction of the project basin and downstream path. Since this is a single-family residential project and it does not fall within a Critical Area, per the City of Edmonds Stormwater Supplement no bonds or other financial guarantees are required. Mione 2 Lot Short Plat 14-0608 July, 2014 Page 9 Mr � .. � �- ADDITIONAL STUDIES; CALCS & SITE PHOTOS S1 TE VICINITY MAP- N SCALE: V = 2,000' OME4GA ENGINEERING, INC. 2829 Rockefeller Ave. Everest WA 98201 (o)42087.3820 (f) 425.259.1958 VICINITY MAP MIONE 2 LOT SHORT PLAT DATE � JOB NO. � SCALE SHEET FEET 7/7/2014 114-0608 1" = 2000' 1 1 OF 1 7711 �7 EX. HOUSE 60' �� I i I I \� \ 1 1 ' ' / ' ' • I • EX: FOOL 27' Err EX POOL HOUSE EX m V COVERED PARKING 180 ti 53,412 SO. FT. 1.226 ACRES TOTAL ti X CL n v J4\ ----- 190th PL SW H nOMEIGA EXISTING BASIN MAP ENGINEERING, INC. MIONE 2 LOT SHORT -PLAT 2829 Rockefeller Ave. DATE JOB NO. SCALE SHEET e Evee WA 98201 7/7/2014 � 14-0608 1" = 50P 1 OF 1 (0)425 387.3820 (f) 425.259.1gs8 PROP. l 6ARACEO,� ^ �Y �� 1 / J , _ p `\ DRY Wj V I I \ ✓SE� ELL ETAIL / 5' G EX. HOUSE 1 E%. POOL I ~ \\ 1 (tI LAND, AP N WA t< DSI \ ^ y \ , • ,5;.t t.'y ti.: t}, .': t 51 wiY'?{I t.; , I r ."� I ) §11�i r' EX. POOL HOUSE FLOW �ll'r P . �, EX. \ C.WREO ` PARKING CONTRACTOfl TO CgAO� 1 PROP.! DRWEW Y TO EE fL W LANOSCAPI O L RUNOFF ONiO STHHE AOJppCEtFT y E GN BY 0 ERS _\ \.. tANosdaPlrJc FbR TryE 1 t 1 p t80 ` LENGTtfY1K'dliEyoRl fAY._.--. — -i-�- 1t„�1.....__.�,•, 1\ • ; - _ •� `�ti SOL 3 PG t4 170 �(L Iii. •.,>J� ��_ _.. of L7_-- ... ( r ..._� ,,.. J•/ l l 11 :� 1f � + � \ I \ �`��, ` yrs � i 1 -- — �-'—� ..-�_�___. �_ '~ � •�� � � / `� l y --f `_ ��,>,`( •rel p 190th PL, 5W j s I ft FIG. DEVELOPED BASIN MAP ENGINEERING, INC. MIONE 2 LOT SHORT PLAT 2029 Rockefeller Ave. DATE JOB NO,SCALE SHEET Evere#t WA 90201 (0)425. 87.3820 (f) 425.259.1950 ' 7/7/2014 14-0608 1" — 503 1 OF 1 ,zz ZZT 3 »»z*ZZT [ ( * # a . a +<s ORL+ OOZL6ZS OEZZ6ZS o + OTZL6ZS OOZZ G 06TL6ZS me m+s ec :�n ,s=ue ){ ( . ( f & a . C § �\ \\ 0 $ 2/§ $ y ) . @ 7 e G @ ® [ } � / r 2 !_ \ « $} co A; u$ ( \ % ( 9 o = \ �@ _ )/ ,»z — & yr SOUTH FORK GEOSCIENCES PO Box 1275 NORTH BEND, WA 98045 (425) 831-2023 AGLAN DONCOCOM CAST. NET April 1, 2014 Project #: 14012 Subsurface Exploration, Geologic Hazards, and Preliminary Geotechnical Engineering Report Parcel # 00434600007800 19011 Olympic View Driyl3i Edmonds, Washington Introduction The purpose of this study was to gain subsurface information to be utilized in the feasibility and permitting of a short plat subdivision of the subject property. It is our understanding that Chris and Merin Mione intend to subdivide the property to create a new lot suitable for construction of a single family residence on the western portion of the property. Authorization to proceed with this study was provided by Chris Mione via e-mail on March 15, 2014. This report was prepared for Mr. and Mrs. Mione and their agents for specific use in support of this project. The location of the subject property is shown in the attached Vicinity Map. An excerpt of the site survey prepared by Greene Land Surveying and the approximate locations of the subsurface explorations logged for this study are shown on the attached Site and Exploration Plan. The subject property was located at 19011 Olympic View Drive in Edmonds, Washington. The property was irregularly shaped and was approximately 300 feet in the east -west direction and ranged from approximately 150 to 200 feet in the north -south direction. Based on information from the Snohomish County Assessor website, the property was 1.23 acres in size. The property sloped gently to moderately from the east down to the west. Based on a review of the site survey, the slope on the west portion of the property was on the order of 2.5H:1 V (Horizontal:Vertical)to6H:IV. The slope immediately adjacent to Olympic View Drive was on the order of IH:lV to 1.5H:1 V, but this slope was obviously created by the road construction. Based on the surveyed elevations, there is approximately 65 feet of total relief on the property. The property was bordered on the west by Olympic View Drive, and to the north, south, and east by residential properties. SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (4-25) 831-2023 The eastern portion of the property has an existing residence which is to remain on the site. The western portion of the property where the new lot will be created will be the area of focus of this report. A significant part of the western portion of the property had been cleared and was covered with grass. There were some large Douglas fir trees and native forest vegetation near the in the southwest corner of the property. We did not observe any signs of accelerated soil erosion or soil movement during our site reconnaissance. Subsurface Conditions Subsurface conditions on the property were inferred from a visual reconnaissance of the property, a review of the referenced geologic map (Minard, 1983) and three hand auger boring explorations performed on the property. The explorations were logged by the undersigned licensed engineering geologist and were immediately backfilled. The approximate locations of the subsurface explorations are shown in the Site and Exploration Plan and the exploration logs are attached to this report. Our interpretation of the native soils as Vashon advance outwash is in agreement with the referenced geologic map. We also used subsurface information from a prior study on the adjacent property to the south in our interpretation of the site geology (Johnson Residence, SFG, Jan, 2014). Stratigraphy Fill Soils Fill soils were not encountered in the subsurface explorations performed for this study, but we know that there are some existing fill soils associated with the sewer pipe and the water service that extend up to the existing residence from Olympic View Drive. Based on the topography, there also appears to be some fill soils in the area marked as "old road" on the site survey. We have marked the approximate areas on the Site and Exploration Plan. Since the placement and compaction of the fill soils is unknown, proposed structures should not be founded on existing fill soils. The following section titled "Site Preparation and Site Grading" explains how to deal with existing fill soils when encountered during construction. Vashon Advance Outwash Vashon advance outwash sediments were encountered in all of the hand auger borings logged for this study from the ground surface to the total depth explored. The advance outwash sediments generally consisted of medium dense to dense, fine to medium sand with gravel with varying amounts of silt. Vashon advance outwash sediments are alluvial and fluvial sediments that were deposited by meltwater streams and channels from the advancing Vashon glacial ice sheet. As the glacial ice advanced, the advance outwash sediments were overridden and consolidated by the glacial ice. As such, the advance outwash sediments are typically dense, relatively permeable, and moisture insensitive due to the past glacial consolidation and the small amount of silt and clay present. Due to their relatively coarse grain size distribution, the advance outwash sediments are moderately resistant to erosion, except when subjected to concentrated water flows. 2 SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023 Hydrology There was no groundwater seepage observed in any of the explorations performed for this study. Soil conditions observed were generally dry for the time of year, which is indicative of permeable soils. Also, there were no signs of ponding water or flowing water observed. Groundwater conditions are subject to change depending on seasonal weather conditions, but based on the permeable advance outwash soils observed, we do not anticipate encountering adverse groundwater conditions during construction. The following discussion of potential geologic hazards is based on the visual reconnaissance of the site, the subsurface explorations, reviews of aerial photographs and regional topographic and geologic maps of the area, and review of the applicable City of Edmonds Municipal Code and maps that are available online. Based on our comparison of the City of Edmonds Municipal Code to the topographic and geologic features of the subject property, the property does not fulfill the criteria for an erosion hazard area, landslide hazard area, or a seismic hazard area. The following two sections of this report will set forth some basic erosion control best management practices for use in construction and will address general seismic risks and design parameters associated with a seismic event. Erosion Concerns Though special mitigations are not necessary, a temporary erosion and sediment control (TESC) plan should be created and implemented during site construction. It is our opinion that implementation of a relatively basic erosion control plan will prevent off site sediment transport. The proper use of "best management practices" (BMPs) should be utilized during earthwork activities to reduce the potential for erosion and sediment transport off of the property. The following is a partial list of BMPs that should be implemented: ® Phasing and scheduling earthwork activities during dry conditions ® Rock construction entrances ® Straw mulch ® Plastic sheeting ® Silt fence ® Keeping exposed soils and stockpiles covered when not actively worked ® Establish temporary/permanent vegetation as soon as possible after foundation and utility installation Implementation of a TESC plan will likely be a requirement of the clearing and grading or building permit. South Fork Geosciences is available to design the TESC plan and to provide any required inspections during construction. 3 SOUTH FORK GEOSCIENCES, PO BOX 1275, NORTH BEND, WA 98045, (425) 831-2023 Seismic Concerns Generally, there are four types of potential geologic hazards associated with large seismic events: 1) ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground motion. The potential for each of these to impact the site is discussed below. Ground Rupture Most large earthquakes in the Puget Sound area are sub -crustal events with epicenters ranging from 50 to 70 kilometers in depth. The subject property is approximately 5 to 6 miles south of the Southern Whidbey Island Fault Zone (SWIFZ). Though the subject property is near the SWIFZ, to our knowledge, there are no signs of past ground rupture in the immediate vicinity of the subject property. Based on the location of the subject property to the south of the known fault zone and the lack of sufficient information to infer a recurrence interval for earthquakes on the SWIFZ (Johnson, et al., 2004), it is our opinion that the probability of ground surface rupture impacting the subject property is low, and no mitigations are necessary. Seismically Induced Landslides Due the topography and absence of steep slopes on the subject property, it is our opinion that the potential for seismically induced slope failures on the site is low and no mitigations are necessary. Liquefaction Liquefaction is a condition where loose, saturated, fine sandy soils lose their shear strength due to rapid pore pressure build-up when subjected to high intensity cyclic loads, such as occur during earthquakes. Due to the medium dense, well -graded, native soils encountered in the subsurface explorations and the absence of adverse ground water conditions, the liquefaction potential of this site is very low, and no mitigations are necessary. Ground Motion Seismic hazards that will affect the structure would likely be due to the intensity and duration of the ground shaking. The structural design of the project should be consistent with 2009 International Building Code (2009 IBC) guidelines (Section 1613). Based on the results of our subsurface explorations and our estimation of soil properties at depth utilizing available geologic data, Site Class "C" as defined by Table 1613.5.2 of the IBC may be used for the design of the proj ect. ' •� i �• �, Our exploration indicates that, from a geotechnical standpoint, the subject property is suitable for the proposed subdivision of the property and the presumed future development, provided the risks discussed are accepted and the recommendations contained herein are properly followed. The near surface, native Vashon advance outwash sediments will be capable of providing support for future structures. Since there are no current development plans for the new lot being created, the following recommendations should be considered preliminary and any future development plans should be reviewed by South Fork Geosciences prior to construction. South 4 SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023 Fork Geosciences is available for further consultation with respect to specific design items, if needed. Site Preparation and Site Grading It is likely that structural fill soils will be required to establish grades for the project. Any fill soil placed beneath a foundation, retaining wall, or driveway/parking area must be constructed as a structural fill. In areas that will provide structural support, any existing fill soils or loose soils should be removed and replaced with structural fill as described below, or the fill soils should be mitigated as described in later sections for specific applications. Structural fill is defined as non-organic soil, placed in maximum 8 -inch loose lifts, with each lift being compacted to at least 95 percent of the maximum dry density, using the modified Proctor test (ASTM: D1557) as the standard. Prior to placing any structural fill the exposed soils must either be undisturbed or be compacted to a dense, non -yielding condition and be approved for structural fill placement. In the case of utility trench filling, the backfill should be placed and compacted in accordance with the applicable City of Edmonds or utility franchise standards. If fill soil will be imported to the site, it should be free of organics and other deleterious material. Mineral soils with more than 5 percent fines are considered to be moisture sensitive. The use of moisture sensitive soils should be confined to dry weather conditions. The moisture condition of the imported soil should be within a few percent of the optimum moisture content of the soil. Soils that are too dry or too wet of the optimum moisture content to achieve suitable compaction will need to be moisture conditioned prior to final compaction. The Vashon advance outwash sediments are not moisture sensitive, but due to the relatively dry soil conditions observed, these soils may require the addition of water to be placed as structural fill. In the case that moisture sensitive soils are used in structural fills, this type of work should be limited to the summer months and good weather conditions. Placement and compaction of the structural fill should be monitored by a competent field technician. In situ density testing should be performed during fill placement to verify proper compaction of the fill soil. A sample of the planned structural fill soil will need to be available at least 48 hours prior to fill placement for laboratory analysis. Temporary cut slopes may be necessary to allow the installation of the foundations and for utility installation. Temporary cut slopes should be limited to 1H:1V (Horizontal:Vertical) in the existing fill soils and %2H:1 V in the Vashon advance outwash sediments. Stability of the cut slopes is the responsibility of the on-site contractor and a safe work environment should be maintained at all times. A trench shield or trench box should be used to install all utilities over 4 feet in depth or the sides of trenches and excavations should be sloped back per OSHA/WISHA standards. SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023 Foundations Spread footings may be used for building support when founded on medium dense native soils or approved structural fill soils. To limit differential settlements between footings that bear on both structural fill and medium dense to dense native soils, we recommend that an allowable bearing pressure of 2,000 pounds per square foot (psf) be utilized for design purposes, including both dead and live loads. An increase of one-third may be used for short-term wind or seismic loading. Perimeter footings should be buried at least 18 inches into the surrounding soil for frost protection; interior footings require only 12 inches burial. However, all footings must penetrate to the prescribed bearing stratum, and no footing should be founded in or above loose, organic, or existing fill soils. It should be noted that the area bounded by lines extending downward at 1 H: IV from any footing must not intersect another footing or intersect a filled area that has not been compacted to at least 95 percent of ASTM:D 1557. In addition, a 1.5H:1 V line extending down from any footing must not daylight because sloughing or raveling may eventually undermine the footing. Thus, footings should not be placed near the edge of steps or near vertical cuts in the bearing soils. Anticipated settlements of footings founded on the medium dense native soils or approved rock trenches should be less than 1 inch. Loose or disturbed surface soils, excessive moisture present or poor foundation subgrade preparation could result in larger settlements. South Fork Geosciences should perform a foundation bearing evaluation prior to concrete placement to verify that the design bearing capacity of the soil has been attained. A foundation bearing evaluation will likely be required by the City of Edmonds Building Department as a condition of the building permit. Perimeter footing drains should be provided as discussed under the section titled Drainage Considerations. Lateral loads can be resisted by friction between the foundation and the supporting soils, and/or by passive earth pressure acting on the buried portions of the foundations. The spread footings must be backfilled with structural fill compacted to a dense, non -yielding condition to achieve the passive resistance provided below. The structural fill must extend horizontally outward from the embedded portion of the foundation a distance equal to at least three times the embedment depth over which the passive resistance is applied. We recommend the following design parameters. ® Passive equivalent fluid = 300 pcf Coefficient of friction = 0.30 The above values are allowable and include a factor of safety of at least 1.5. Lateral Earth Pressure Cast -in-place, concrete foundation walls or retaining walls should be designed to resist "at -rest" lateral soil pressure conditions if the concrete walls will not be free to yield laterally at the top. Restrained walls should be designed to resist an "at -rest" equivalent fluid pressure of 55 pounds per cubic foot (pcf). Concrete walls that are free to yield laterally at the top of the wall may be designed 6 SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023 using an active soil pressure of 35 pcf. Surcharges from sloping backfill conditions or adjacent structural loads should be added to the above lateral soil pressures. Full height drainage of foundation walls will need to be installed to prevent hydrostatic pressures from acting on the walls. Detaining Walls We presume that future development may require retaining walls to provide grade separation. South Fork Geosciences should review all proposed retaining walls prior to construction. Floor Support We anticipate that a single-family home built on the new lot would utilize slab -on -grade floors or a combination of slab -on -grade floors and structural/crawlspace floors. Slab -on -grade concrete floors should be cast atop a prepared subgrade of structural fill soil compacted to a minimum of 90 percent of the modified Proctor maximum dry density. A capillary break with a minimum thickness of 4 inches should be placed atop the prepared subgrade. The capillary break material should be a gap graded material consisting of pea gravel, 3/4 -inch washed drain rock, or clean crushed rock with less than 5 percent fines (material passing the No.200 sieve). The capillary break will reduce the potential for moisture wicking through the floor slab. A 10 -mil thick plastic vapor barrier should also be placed atop the capillary break material. All concrete placement should follow the guidelines set forth by the American Concrete Institute (ACI). In areas that structural/crawl space -type floors are used, provisions should be made to slope internal crawlspace areas to lows that may be drained to the footing drain system around the perimeter of the foundation to prevent the accumulation of standing water within the crawlspace areas. The soil surface should be covered with a minimum I0 -mil thick moisture barrier. Drainage Considerations A perimeter foundation drain should be established to protect the floor slab and internal crawlspace areas from ground water intrusion. The level of the foundation drain should be set at, or slightly below, the base of the footing elevation. The drain should consist of 4 -inch diameter, rigid, perforated, PVC drain pipe and should be set to allow for gravity discharge. The drainpipe should be surrounded by a minimum of 6 inches of pea gravel or washed drain rock. Roof drains should not tie into the footing drain but should be collected in a separate, tightline drain. The drain lines should be set to discharge via gravity to a dispersion or infiltration area or to an approved stormwater drainage. In addition, all footing stem walls that enclose conditioned space should be lined with a 12 -inch - thick (minimum) washed gravel blanket provided over the height of the wall that ties into the footing drain. The washed gravel blanket should be ended one foot below the desired ground surface and the top of the gravel should be covered with filter fabric. The remaining one foot should be filled with compacted soil to reduce the amount of surface water entering the wall and footing drain system. 7 SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023 Site Drainage We have not reviewed any plans for stormwater disposal at this time. The native, Vashon advance outwash sediments are well suited for infiltration methods due to their relatively coarse grain size distribution and lack of fine sediments. With the relatively large lot size and the gently sloping area on the western portion of the property, we presume that infiltration methods such as a series of drywells or infiltration trenches in the native sediments will be used to dispose of stormwater generated from the site. Based on our visual assessment of the native Vashon advance outwash soils, we believe that the soil would be classified as "sand" in the USDA Soil Textural Triangle. South Fork Geosciences is available for additional consultation with respect to site drainage, if necessary. MIM Our findings and recommendations provided in this report were prepared in accordance with generally accepted principles of engineering geology and geotechnical engineering as practiced in the Puget Sound area at the time this report was submitted. We make no other warranty, either expressed or implied. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. We are available to provide additional design recommendations and consultation throughout the development of this project. Since there are no current development plans, the recommendations in this report should be considered preliminary. South Fork Geosciences should be contacted to review any architectural or grading plans and to provide additional geotechnical information and input prior to construction. We are also available to provide construction monitoring services during construction for earthwork quality control and to help ensure that the recommendations in this report are properly implemented. We have enjoyed working with you and we are confident that this report will aid in the design of your project. If there are any questions, please contact us at (425) 8312023. Sincerely, O� VV C1 & 0 N '".mol Andrew L. Clan on Andrew L. Glandon, LEG, CPESC Geologist / Owner South Fork Geosciences 60P, b, Jamey S. Battermann, PE Geotechnical Engineer 8 SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023 Attachments: Vicinity Map Site and Exploration Plan Exploration Pit Logs References: Minard, James P., "Geologic map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington" U.S. Geological Survey, Miscellaneous Field Studies Map MF- 1541, scale 1:24,000, 1983 Edmonds Municipal Code �ll(C�:// v ✓ �.���kunua; In�.fi rr�r, ..aulucu LLdi ,I k . City of Edmonds Maps United States Department ofAgricultureNatural Resources Conservation Service, Illi,�I'F,��vW/lw�1l^.R1lG`,k4k',�;�/ (1nC CA'16�4.4k4V�i Snohomish County Assessor Property Account Summary 03J7 ,w, ll"3,.�s�t�/s���r: �b � ,E`.' � Gi�tE.[.,,�:�.� 7:67. r 00d")d USGS Quaternary Faults Web Mapping Application Johnson, S.Y., Blakely, R.J., Brocher, T.M., Sherrod, B.L., Kelsey, H.M., and Lidke, D.J., compilers, 2004, Fault number 572, Southern Whidbey Island fault zone, in Quaternary fault and fold database of the United States: U.S. Geological Survey website, ¢flr//6.,�6'fV�rClcb[ rr� sup,.g,aar�/CIBp�,fal`�iE,/�����I�IIE�k, accessed 01/10/2014 03:28 PM "Subsurface Exploration, Geologic Hazards, and Geotechnical Engineering Report, Johnson Residence, Parcel # 00434600007901, 9527 190th Place SW, Edmonds, Washington" South Fork Geosciences, Project #12058, January, 14, 2014 9 SOUT1-I FOLK GE_OSCIENCES, (DC7 BOX 1275, NOR -H -I BEND, WA 913045, (425) 831-2023 SOUTH FORK GEOSCIENCES PO Box 1275 NORTH BEND, WA 98045 (425) 831 -2023 AGLANDON@)C-OMCAST.NET Vicinity Map Mione Short Plat, '11019 Olympic View Drive, Edmonds, WA Project #140,12 41JON t� awfol) 2 Qj u 0 V) Wool 10- Date: -0-2014 Depth Number: HB -1 0 Sod (0-2") Vashon Advance Outwash loose to medium dense, moist, black brown to light brown, fine to medium SAND with gravel 1 and silt (SP -SM) becomes medium dense @ 1.5ft 2 d dense, moist, tan -light brown, fine to medium SAND with gravel, trace silt (SP) 3 Total Depth = 3.Oft, Refusal due to gravels No seepage observed No caving observed 4 5 6 7 BoringHand Auger Log The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation and judgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. Project # 14012 rR .1 Box 1275 NORTH BEND, WA 904 PHONE:•, Date: ®2-®9 Depth ft Number: HB -2 0 Forest Duff/Topsoil (0-4") Vashon Advance Outwash loose to medium dense, moist, light brown to brown, fine to medium SAND with gravel and 1 silt (SP -SM) 2 1 1roots present to 2ft, medium dense @ 2ft 3 1 medium dense to dense, moist, gray -light brown, fine to medium SAND with gravel, trace silt (SP) Total Depth = 3.5ft, Refusal due to gravels No seepage observed 4 A No caving observed 5 6 7 The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation and judgment, and where noted, by engineering analysis and Laboratory testing. The conditions shown may not be representative of conditions at other times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. Project # 14012 P• Box .o`:BEND, WA 9804. Depth 0 I 2 3 rd 5 D 7 1 .. 917MV93TIKIM Number: - Vashon Advance Outwash medium dense to dense, moist, gray -light brown, fine to medium SAND with gravel, trace silt (SP) Total Depth = 1.0ft No seepage observed No caving observed Located in road cut exposure -confirmed cut into native sediments Approximately 4 to 5 feet below base of wood fence The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation and judgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. Project # 14012 Box 1275 PHONE:NORTH BEND, WA 98045