DRAINAGE REPORT.pdfDrainage Report Bill Ritter SP for Vector One, LLC SITE LOCATION: 8364 Olympic View Dr. Edmonds, WA 980260 Tax Parcel: 27041800101000 a Prepared by: Joseph M. Smeby, P.E. Job No: 16-0915 November, 2016 fi 9 dl f,.. Eb WHI-1 APPLICABLz WT.... 'AT ' � C 0 D TABLE OF CONTENTS ITEM PAGE TABLE OF CONTENTS......................................................... ............ ....,............ ........1 LISTOF FIGURES........_............................................. ........ ....................... w 2 1. INTRODUCTION & SITE CLASSIFICATION .................................... ........................ 3 2. PREPARATION OF STORMWATER SITE PLAN ,....,..,.. ............................ 4 3. SWPPP NARRATIVE.,,., ....................... ........ ....... , ............. ,.....................5 RISK ASSESSMENT........ ................. ........,..,.... ,,..,.......,.,.,..,.,... 6 B. SWPPP MINIMUM ELEMENTS...................................................... 7 4. SOURCE CONTROL ..................... ...................... ......... ___ ........................... ,...... 8 5. PRESERVATION OF NATURAL DRAINAGE SYSTEM.,....,, .... ......8 6. ON -SITE STORMWATER MANAGEMENT. ...... 7. RUNOFF TREATMENT__- ........... ....... ............. ............. ,,,.,...... 9 8. FLOW CONTROL.....................................................................................................10 9. WETLANDS PROTECTION......................................................................................11 10. MAINTENANCE AND OPERATIONS MANUAL ........................„....., ,,,,.,.............,..11 11. OFFSITE ANALYSIS AND MITIGATION ..................................... ,,.,.,..,.,.,.,,......... ,..11 12. FINANCIAL LIABILITY .......................... ................. .,., _ .... ... , ........................11 APPENDIX A - STORMWATER CALCS, SOILS, PHOTOS, M&O............ .......... ___ ..... A-1 Bill Ritter SP 16-0915 May 2017 Page 1 LIST OF FIGURES ITEM PAGE FIGURE 1 VICINITY MAP ..................... ....... ........ ........ ..... ...,....-...12 FIGURE 2 EXISTING DRAINAGE BASIN MAP.......................................................13 FIGURE 3 DEVELOPED DRAINAGE BASIN MAP .........,,.,., ,...:..,.14 FIGURE 4 SNOHOMISH COUNTY SOILS MAP,.... ............ ................... .............. „ 15 FIGURE 5 UPSTREAM/DOWNSTREAM TRIBUTARY AREA MAP........................16 Bill Ritter SP May 2017 16-0915 Page 2 1. INTRODUCTION & SITE CLASSIFICATION This document is intended to provide engineering information necessary to support the construction permit application submittal to the City of Edmonds for the three lot short plat proposed on this site. The site covers 1.29 acres, with approximately 14,600 sf allowed to be disturbed. Lot C will not be disturbed as a result 'of this project so the area of - disturbance will be on future lots A & B along with some work within the Olympic View Drive R/W. An existing access is located along the east side of the existing parcel serving the existing SFR on future Lot C along with some adjacent parcels. A new access point will be constructed off of Olympic View Drive in the northwest corner of future Lot A and will serve both Lots A & B. This report is being prepared for the new owners of this project and as a result of the original engineer for this project Eric Tietze having retired since the last submittal to the City. The intent of this report is to provide the necessary project information and confirm the original code and design assumptions provided in Mr. Tietze's report as well as provide the necessary design information for the proposed drainage system. It should be noted that the proposed impervious areas originally included in Mr. Tietze's report have not changed so the calculations and design included in this report are confirming the original design was accurate based on our review of his,design compared to our calculations. Per the City standards in place at the time of the original permit submittal for this project (City of Edmonds Stormwater Code Supplement, April 20, 2010) this project would fall under the Category 2 Small Project requirements based on the proposed impervious surface areas on future Lots A & B. Refer to Section 8 of this report for flow control design details. The proposed SFR project will create 8,050 sf of new impervious surfaces including the future SFRs and driveway/access. Of the total new impervious less than 2,000 sf is PGIS. All the remaining pervious areas will be amended per the City standard. All the NPGIS and PGIS will be mitigated using a small site detention system prior to release from the site. All site runoff will be collected and discharged to the Olympic View Dr. R/W. The site is located at 8364 Olympic View Dr., Edmonds, WA 98020, and in Section 18, Township 27N, Range 4E, Willamette Meridian. See Figure 1 - Vicinity Map. Bill Ritter SP 16-0915 May 2017 Page 3 2. STORMWATER SITE. PLAN As noted in Section 1 of this report this project is classified as a Category 2 Small Site Project. Therefore, this drainage design has been prepared to address the requirements contained in the City of Edmonds Stormwater Supplement and applicable handouts. The engineering plan set submitted to the City for review along with this report contains the required information.This document is intended to provide the supporting information to justify the sizing of the BMPs and detail how the design of the selected BIVIPS meet the required standards. For this project, no LID techniques were used. Geotechnical studies show that water will not infiltrate into the soils. Therefore, no dispersion or infiltration of runoff will be used. Runoff from the total impervious surfaces will be directed to an on -site detention system. This is done to reduce the peak flow rates and volumes from these surfaces. This is discussed in detail in Section 8 of this report and shown on sheets 5 & 6 of the plan set. Bill Ritter SP . ............ 16-0915 May 2017 Page 4 3. SWPPP NARRATIVE Clearing, grading, and temporary erosion and sediment control plans have been prepared as part of the drainage plan drawings. However, since a construction site is dynamic it will be necessary to reassess the erosion control BMP's during construction and install additional measures when necessary. Proposed temporary measures possible for this project will include the following BMP's: • Installation of stabilized construction entrance. • Retention of Existing Vegetation • Straw mulch, hydroseed or other mulching and planting method to stabilized unworked areas. • Silt fencing if necessary • Inlet protection Permanent measures to reduce or eliminate erosion or water quality degradation will include the following BMP's: • Paving all traffic areas (concrete/asphalt) • Permanent landscaping in pervious areas. • Limiting cut and fill slopes to 2:1 maximum and 3:1 maximum where exposed to standing water. • Routine maintenance and inspection of the grounds and response to developing problems. The listed erosion control BMP's will be engineered for anticipated conditions in compliance with City of Everett and DOE guidelines. With proper installation, maintenance and inspection the proposed BMP's should result in minimal impact to the surrounding environment. The City retains the authority by code to require additional measures should the existing measures prove insufficient. Bill Ritter SP 16-0915 May 2017 Page 5 A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT Area proposed to be cleared/worked: 0.34 acres Average slope for the site: 15% Erosion Hazard of Soil Moderate -High Critical Areas downslope No Site is upstream of an ESA Stream No Based on the above information and the fact that the site will retain so much existing vegetation and construction site runoff will filter through the soil, and that if site conditions warrant, additional BMP's can be implemented as corrective measures the Risk Category for this site is Moderate Risk. B. SWPPP MINIMUM ELEMENTS 1: Mark Clearing Limits The first step in the "Construction Sequence" included on the clearing and grading plan sheets is for the limits of clearing to be flagged and to have construction fencing placed along the limits prior to any other construction activity. 2: Establish Construction Access The SWPPP calls for the proposed construction entrance to be installed as the second step after the staking of clearing limits. A detail is provided on the plans. 3: Control Flow Rates This project will utilize the proposed detention system once it has been constructed. 4: Install Sediment Controls This site and SWPPP proposes to construct/maintain a construction entrance, retained vegetation and silt fencing. These features are intended to minimize the opportunity for sediment to leave the site via stormwater or on vehicles. The construction of these features is one of the first items required in the "Construction Sequence". Mulch will also be used on the exposed soil as necessary to limit erosion. 5: Stabilize Soils The "Construction Sequence" calls for the stabilization of soils that remain unworked for certain lengths of time based on the time of year. Stabilization techniques may include but not limited to mulching, plastic sheeting or hydroseeding, notes have been added to the plan regarding protection for the stock pile area if necessary. A stockpile area has been identified on the SWPPP and is setback a minimum of 20-feet from any down slope property line. 6: Protect Slopes All disturbed slopes on site during construction are required to be protected with mulch or other means as specified in the construction sequence. No concentrated runoff or significant amounts of sheet flow will be directed to new cut or fill slopes during construction. Bill Ritter SP 16-0915 May 2017 Page 6 7: Protect Drain Inlets All new catch basins and yard drains will be'protected with inlet protection as specified on sheet 2 of the engineering plan set. In addition, the nearest downstream catch basins along the west side of 9'h Ave S will receive inlet protection per standard plan E1.8.. 8: Stabilize Channels and Outlets No new channels or outlets are proposed for this site. 9:- Control Pollutants No outside chemicals are expected to be necessary for the construction of this project. All vehicles working on and around the site would need to meet the State requirements for emissions. 10: Control DeWatering DeWatering is not expected to be necessary for this project. However, the proposed detention system would be available to control the release of any water from construction for disposal. 11: Maintain BMPs The construction supervisor will be responsible for maintaining all BMPs during construction and working with the City to relocate or add BMPs as necessary as site conditions change. 12: Manage the Project It will be the responsibility of the Contractor and Developer to manage this project and coordinate with the City Inspector and Engineer. Inspection and Monitoring: Site inspections shall be done by a person who is knowledgeable in the principles and practices of erosion and sediment control. The person must have skills to first assess the site conditions and construction activities that could impact the quality of stormwater, and second assess the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. Maintaining an Updated Construction SWPPP: The construction SWPPP shall be retained on -site or within reasonable access to the site. The SWPPP shall be modified whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters -of the state. The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems'identified. Revisions to the SWPPP shall be completed within seven days following inspection. Bill Ritter SP 16-0915 May 2017 Page 7 4. WATER POLLUTION SOURCE CONTROL The City of Edmonds Stormwater Supplement and DOE Drainage manual were reviewed to determine if the proposed land -use for this project or construction activities required any site -specific source control BMPs to be constructed. SFR projects are not listed as a proposed use that requires source control. Therefore, no site/development specific source control BMPs are required for this project. 5. PRESERVATION OF NATURAL DRAINAGE SYSTEM The runoff from the on -site basin drains to the north and into the existing RNV. The outfall from the proposed detention system connects to this same downstream conveyance system. 6. ON -SITE STORMWATER MANAGEMENT For this project dispersion and infiltration are not feasible due to site constraints (existing slopes) and soil conditions. 7. RUN-OFF TREATMENT This project proposes to construct less than 5,000 sf of new PGIS and is therefore exempt from this requirement. Bill Ritter SP 16-0915 May 2017 Page 8 8. FLOW CONTROL For this project, using the City of Edmonds Stormwater Supplement, traditional methods were designed. The total new plus replaced impervious surfaces of 8,050 sf will have the runoff mitigated using a detention tank sized using the Western Washington Hydrology Model with the Puget East 36 precipitation data, and Section 5.7 of the Edmonds Stormwater Code Supplement for a Category 2 small site project. Refer to the design discussion below. For this project, the detention system was sized based on the total new impervious surfaces. As noted previously the total roof and driveway area totals 8,050 sf. For the purposes of sizing the detention tank using the Western Washington Hydrology Model and Section 5.7 of the Edmonds Stormwater Code Supplement for a Category 2 small site project. A pipe size of 60" has been selected that will require a total length to be 44' and a bottom orifice size of and an elbow with orifice size 3". Please see the drainage plans for more details. Bill Ritter SP 16-0915 May 2017 Page 9 ' Since the project site is in a creek drainage basin the site is required to meet the following peak flow control standards: 2-year: 0.07 cfs/acre impervious 10-year: 0.14 cfs/acre impervious 100-year: 0.33 cfs/acre impervious Based on these standards the allowable discharge rates for the site based on 0.183 acres of impervious surfaces are: 2-year: 0.013 cfs 10-year: 0.026 cfs 100-year: 0.060 cfs By preparing a site plan that minimized the disturbed area on this site and sets aside a large portion of the existing treed areas in open space easements on the future lots, the overall drainage impacts to the downstream system and surrounding area can be reduced,. Therefore, this design has been laid out to minimized the disturbance to the existing area while protecting the existing neighboring properties from flooding or erosive impacts. Bill Ritter SP 16-0915 May 2017 Page 10 9: WETLANDS PROTECTION This project will not impact any wetland on or directly downstream- of the site. 10: OPERATIONS AND MAINTENANCE MANUAL The Property Owner will be responsible for maintaining the stormwater and landscaping facilities within this development. Included in this manual are checklists for each feature specific to this project. Copies should be made of the checklists as necessary during routine inspections and required maintenance. Specific problems can -be recorded along with the appropriate action taken. These checklists are a guide for inspections and maintenance. The frequency of the inspections/maintenance is identified in the left-hand column with the following abbreviations: A = Annual (March or April preferred) M = Monthly S = After Major Storms (Use 1-inch in 24 hours as a guideline) Routine inspections and maintenance will improve the long-term performance of the stormwater facilities. If at any time, you are unsure if a problem exists or how to address a specific problem, contact a Professional Engineer. Refer to Appendix A for a list of each facility to be maintained and the appropriate maintenance checklist. 11. OFFSITE ANALYSIS AND MITIGATION During the site review and downstream site visit for this project it was determined that the properties to the west of this site contain existing SFRs and it is not viable draining in that direction. After further soil analysis, it was also determined that on -site infiltration is not feasible. Therefore, it has been determined that discharging to the drainage system within 9t' Ave. S. was the best option for this project. The existing drainage system within the R.O.W. consists of a 12" concrete storm system that drains from south to north within the Shell Creek basin. There were no indications from the site observations that any capacity issues exist within this system. The conveyance system was followed to the north for approximately % mile. Therefore, this project's downstream system is completely contained within an engineered pipe conveyance system which was not observed to have any drainage problems. 12. FINANCIAL LIABILITY Since this is a single-family residential project and it does not fall within a Critical Area, per the City of Edmonds Stormwater Supplement no bonds or other financial guarantees are required. A KC engineering cost estimate worksheet is being provided to the City for Construction bonds. Bill Ritter SP 16-0915 May 2017 Page 11 APPENDIX A STORMWATER CALCULATIONS R&D Masonry 16-1005 Nov. 2016 Page -14 l0 0, �# � gvk��M, General Model Information Project Name: - LOt A-B-36 Site Name: Carl -Ritter SP Site Address: 8364 Olympic View Drive City: Edmonds Report Date: 5/24/2017 MGS Region: Puget East Data Start: 1901/10/1 Data End: 2058/09/30 Timestep: 15 Minute DOT Data Number03 Version Date: 2016/02/25 Version: 4.2.12 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POC1: 50 Year LOt A-B-36 5/24/2017 2:13:22 PM Page 2 Landuse Basin Data Predeveloped Land Use Basin 1 Bypass: No GroundWater: No Pervious Land Use acre C, Forest, Mod 0.33 Pervious Total 0.33 Impervious Land Use acre Impervious Total 0 Basin Total 0.33 Element Flows To: Surface Interflow Groundwater LOt A-B-36 5/24/2017 2:13:22 PM Page 3 Mitigated Land Use Basin 1 Bypass: No GroundWater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre ROOF TOPS FLAT 0.138 DRIVEWAYS MOD 0.046 Impervious Total 0.184 Basin Total 0.184 Element Flows To: Surface Tank 1 Interflow Tank 1 Groundwater LOt A-B-36 5/24/2017 2:13:22 PM Page 4 Routing Elements Predeveloped Routing LOt A-B-36 5/24/2017 2:13:22 PM Page 5 Mitigated Routing Tank 1 Dimensions Depth: Tank Type: Diameter: Length: Discharge Structure Riser Height: Riser Diameter: Orifice 1 Diameter: Orifice 2 Diameter: Element Flows To: Outlet 1 5 ft. Circular 5 ft. 44 ft. 4.9 ft. 8 in. 0.5 in 3 in. Outlet 2 Tank Hydraulic Table Stage(feet) 0.0000 0.0556 0.1111 0.1667 0.2222 0.2778 0.3333 0.3889 0.4444 0.5000 0.5556 0.6111 0.6667 0.7222 0.7778 0.8333 0.8889 0.9444 1.0000 1.0556 1.1111 1.1667 1.2222 1.2778 1.3333 1.3889 1.4444 1.5000 1.5556 1.6111 1.6667 1.7222 1.7778 1.8333 1.8889 1.9444 2.0000 Area(ac 0.000 0.001 0.001 0.001 0.002 0.002 0.002 0.002 0.002 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 Elevation:0 ft. Elevation:4.57 ft. Volume(ac-ft.) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.001 0.001 0.001 0.001 0.002 0.002 0.002 0.002 0.002 0.003 0.003 0.003 0.003 0.004 0.004 0.004 0.004 0.005 0.005 0.005 0.005 0.006 0.006 0.006 0:006 0.007 0.007 Discharge(cfs) 0.000 0.001 0.002 0.002 0.003 0.003 0.003 0.004 0.004 0.004 0.005 0.005 0.005 0.005 0.006 0.006 0.006 0.006 0.006 0.007 0.007 0.007 0.007 0.007 0.007 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.009 0.009 0.009 0.009 0.009 Infilt(cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 LOt A-B-36 5/24/2017 2:13:22 PM Page 6 2.0556 0.005 0.007 0.009 0.000 2.1111 0.005 0.008 0.009 0.000 2.1667 0.005 0.008 0.010 0.000 2.2222 0.005 0.008 0.010 0.000 2.2778 0.005 0.008 0.010 0.000 2.3333 0.005 0.009 0.010 0.000 2.3889 0.005 0.009 0.010 0.000 2.4444 0.005 0.009 0.010 0.000 2.5000 0.005 0.009 0.010 0.000 2.5556 0.005 0.010 0.010 0.000 2.6111 0.005 0.010 0.011 0.000 2.6667 0.005 0.010 0.011 0.000 2.7222 0.005 0.011 0.011 0.000 2.7778 0.005 0.011 0.011 0.000 2.8333 0.005 0.011 0.011 0.000 2.8889 U05 0.011 0.011 0.000 2.9444 0.005 0.012 0.011 0.000 3.0000 0.004 0.012 0.011 0.000 3.0556 0.004 0.012 0.011 0.000 3.1111 0.004 0.013 0.012 0.000 3.1667 0.004 0.013 0.012 0.000 3.2222 0.004 0.013 0.012 0.000 3.2778 0.004 0.013 0.012 0.000 3.33.33 0.004 0.014 0.012 0.000 3.3889 0.004 0.014 0.012 0.000 3.4444 0.004 0.014 0.012 0.000 3.5000 0.004 0.014 0.012 0.000 3.5556 U04 0.015 0.012 0.000 3.6111 0.004 0.015 0.012 0.000 3.6667 0.004 0.015 0.013 0.000 3.7222 0.004 0.015 0.013 0.000 3.7778 0.004 0.016 0.013 0.000 3.8333 U04 0.016 0.013 0.000 3.8889 0.004 0.016 0.013 0.000 3.9444 0.004 0.016 0.013 0.000 4.0000 0.004 0.017 0.013 0.000 4.0556 0.004 0.017 0.013 0.000 4.1111 0.003 0.017 0.013 0.000 4.1667 UO3 0.017 0.013 0.000 4.2222 UO3 0.017 0.013 0.000 4.2778 0.003 0.018 0.014 0.000 4.3333 0.003 0.018 0.014 0.000 4.3889 UO3 0.018 0.014 0.000 4.4444 0.003 0.018 0.014 0.000 4.5000 0.003 0.018 0.014 0.000 4.5556 0.002 0.019 0.014 0.000 4.6111 0.002 0.019 0.064 0.000 4.6667 0.002 0.019 0.090 0.000 4.7222 0..002 0.019 0.110 0.000 4.7778 0,002 0.019 0.126 0.000 4.8333 0.001 0.019 0.140 0.000 4.8889 0.001 0.019 0.152 0.000 4.9444 0.001 0.019 0.230 0.000 5.0000 0.000 0.019 0.394 0.000 5.0556 0.000 0.000 0.590 0.000 LOt A-B-36 5/24/2017 2:13:22 PM Page 7 An, 4�sis Results w► POC M ff Par -caret Tam® F:n®aci®o-sg + Predeveloped Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.33 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0 Total Impervious Area: 0.184 —A ... x Mitigated Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.0056 5 year 0.00869 10 year 0.010367 25 year 0.012072 50 year 0.013085 100 year 0.013918 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.011859 5 year 0.018361 10 year 0.024328 25 year 0.034264 50 year 0.043787 100 year 0.055504 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1902 0.008 0.012 1903 0.003 0.010 1904 0.005 0.012 1905 0.003 0.011 1906 0.001 0.010 1907 0.009 0.014 1908 0.006 0.011 1909 0.006 0.011 1910 0.010- 0.013 1911 0.005 0.011 .—..,....9G.......... .--- ...... a..... mm . SpA R5 9�!N.6; anon. LOt A-B-36 5/24/2017 2:13:22 PM Page 8 1912 0.017 0.013 1913 0.008 0.011 1914 0.002 0.012 1915 0.003 0.009 1916 0.005 0.011 1917 0.002 0.011 1918 0.005 0.012 1919 0.004 0.010 1920 0.005 0.011 1921 0.005 0.010 1922 0.006 0.012 1923 0.004 0.012 1924 0.003 0.010 1925 0.003 0.009 1926 0.005 0.011 1927 0.006 0.011 1928 0.004 0.011 1929 0.009 0.013 1930 0,005 0.012 1931 0.005 0.011 1932 0.004 0.011 1933 0.005 0.010 1934 0.012 0.014 1935 0.005 0.010. 1936 0.007 0.012 1937 0.006 0.013 1938 0.006 0.011 1939 0.000 0.010 1940 0.005 0.012 1941 0.005 0.010 1942 0.007 0.013 1943 0.002 0.011 1944 0.006 0.081 1945 0,005 0.012 1946 0.005 0.010 1947 0.003 0.011 1948 0.011 0.027 1949 0.009 0.051 1950 0.005 0.010 1951 0,006 0.010 1952 0.016 0.064 1953 0,015 0.071 1954 OM5 0.011 1955 0.004 0.010 1956 0.003 0.008 1957 0.006 0.011 1958 0.015 0.034 1959 0.009 0.011 1960 0.003 0.009 1961 0.010 0.022 1962 OM5 0.012 1963 O A02 0.009 1964 0.004 0.011 1965 0.011 0.021 1966 0,.002 0.010 1967 0.004 0.010 1968 0.006 0.012 1969 0,004 0.011 LOt A-B-36 5/24/2017 2:14:42 PM Page 9 1970 0.006 0.012 1971 0.012 0.027 1972 0.008 0.014 1973 0.009 0.013 1974 0.005 0.011 1975 0.013 0.035 1976 0.006 0.013 1977 0.004 0.009 1978 0.011 0.014 1979 0.003 0.010 1980 0.006 0.010 1981 0.005 0.011 1982 0.004 0.009 1983 0.009 0.013 1984 0.002 0.011 1985 0.005 0.012 1986 0.004 0.010 1987 0.009 0.020 1988 0.007 0.012 1989 0.005 0.011 1990 0.007 0.012 1991 0.005 0.012 1992 0.008 0.012 1993 0.006 0.012 1994 0.011 0.014 1995 0.003 0.009 1996 0.013 0.013 1997 0.006 0.011 1998 0.006 0.013 1999 0.000 0.010 2000 0.004 0.011 2001 0.003 0.010 2002 0.008 0.011 2003 0.006 0.012 2004 0.006 0.012 2005 0.008 0.011 2006 0.004 0.009 2007 0.004 0.013 2008 0.006 0.010 2009 0.004 0.011 2010 0.003 0.014 2011 0.004 0.009 2012 0.005 0.043 2013 0.004 0.010 2014 0.003 0.010 2015 0.011 0.012 2016 0.002 0.009 2017 0.009 0.088 2018 0.016 0.048 2019 0.017 0.077 2020 0.005 0.010 2021 0.008 0.013 2022 0.003 0.010 2023 0.006 0.011 2024 0.013 0.013 2025 0.005 0.010 2026 0.009 0.012 2027 0.004 0.011 LOt A-B-36 5/24/2017 2:14:42 PM Page 10 2028 0.002 0.009 2029 0.006 0.011 2030 0.012 0.027 2031 0.003 0.009 2032 0.003 0.009 2033 0.003 0.009 2034 0.003 0.011 2035 0.014 0.055 2036 0.007 0,012 2037 0.001 0.010 2038 0.007 0.014 2039 0.001 0..010 2040 0.003 0.012 2041 0.004 0.011 2042 0.014 0.056 2043 0.006 0.012 2044 0.009 0.013 2045 0.005 0.010 2046 0.006 0.011 2047 0.004 0.010 2048 0.005 0.013 2049 0.005 0.012 2050 0.003 0.011 2051 0.006 0.014 2052 0.003 0.012 2053 0.006 0.011 2054 0.008 0.014 2055 0.002 0.009 2056 0.002 0.010 2057 0.004 0.010 2058 0.004 0.010 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0169 0.0880 2 0.0169 0.0809 3 0.0164 0.0775 4 0.0155 0.0712 5 0.0153 0.0644 6 0.0146 0.0564 7 0.0142 0.0545 8 0.0136 0.0510 9 0.0132 0.0480 10 0.0128 0.0433 11 0.0127 0.0352 12 0.0123 0.0343 13 0.0121 0.0275 14 0.0120 0.0272 15 0.0114 0.0269 16 0.0114 0.0217 17 0.0113 0.0212 18 0.0111 0.0205 19 0.0111 0.0144 20 0.0096 0.0144 21 0.0095 0.0142 22 0.0094 0.0141 23 0.0093 0.0140 LOt A-B-36 5/24/2017 2:14:42 PM Page 11 24 0.0091 0.0138 25 0.0091 0.0136 26 0.0090 0.0135 27 0.0089 0.0135 28 0.0088 0.0135 29 0.0087 0.0134 30 0.0086 0.0134 31 0.0086 0.0132 32 0.0084 0.0131 33 0.0079 0.0131 34 0.0078 0.0130 35 0.0078 0.0130 36 0.0078 0.0130 37 0.0077 0.0130 38 0.0076 0.0129 39 0.0075 0.0128 40 0.0073 0.0127 41 0.0073 0.0127 42 0.0071 0.0126 43 0.0070 0.0125 44 0.0069 0.0124 45 0.0067 0.0123 46 0.0065 0.0123 47 0.0064 0.0122 48 0.0064 0.0122 49 0.0064 0.0122 50 0.0063 0.0121 51 0.0063 0.0121 52 0.0062 0.0121 53 0.0062 0.0121 54 0.0062 0.0121 55 0.0061 0.0120 56 0.0061 0.0120 57 0.0061 0.0120 58 0.0061 0.0119 59 0.0060 0.0119 60 0.0060 0.0119 61 0.0060 0.0119 62 0.0059 0.0118 63 0.0059 0.0118 64 0.0058 0.0117 5 0.0057 0.0117 66 0.0057 0.0116 67 0.0057 0.0116 68 0.0056 0.0115 69 0.0055 0.0115 70 0.0055 0.0115 71 0.0054 0.0115 72 0.0054 0.0115 73 0.0054 0.0114 74 0.0054 0.0114 75 0.0054 0.0114 76 0.0054 0.0114 77 0.0054 0.0113 78 0.0053 0.0113 79 0.0053 0.0112 80 0.0052 0.0112 81 0.0051 0.0112 LOt A-B-36 5/24/2017 2:14:42 PM Page 12 82 0.0051 0.0112 83 0.0051 0.0111 84 0.0051 0.0111 85 0.0051 0.0111 86 0.0050 0.0110 87 0.0050 0.0110 88 0.0050 0.0110 89 0.0050 0.0110 90 0.0049 0.0110 91 0.0049 0.0109 92 0.0049 0.0109 93 0.0049 0.0109 94 0.0049 0.0109 95 0.0048 0.0109 96 0.0046 0.0109 97 0.0045 0.0108 98 0.0045 0.0108 99 0.0045 0.0108 100 0.0044 0.0108 101 0.0044 0.0107 102 0.0044 0.0107 103 0.0044 0.0107 104 0.0043 0.0106 105. 0.0042 0.0106 106 0.0042 0.0106 107 0.0041 0.0106 108 0.0040 0.0105 109 0.0040 0.0105 110 0.0040 0.0104 111 0.0040 0.0104 112 0.0040 0.0104 113 0.0039 0.0104 114 0.0039 0.0103 115 0.0038 0.0103 116 0.0037 0.0103 117 0.0037 0.0103 118 0.0037 0.0103 119 0.0037 0.0103 120 0.0036 0.0103 121 0.0036 0.0102 122 0.0034 0.0102 123 0.0034 0.0102 124 0.0034 0.0102 125 0.0034 0.0101 126 0.0033 0.0101 127 0.0032 0.0101 128 0.0032 0.0100 129 0.0031 0.0100 130 0.0030 0.0100 131 0.0030 0.0099 132 0.0029 0.0099 133 0.0029 0.0099 134 0.0028 0.0098 135 0.0027 0.0098 136 0.0027 0.0098 137 0.0027 0.0097 138 0.0027 0.0096 139 0.0027 0.0096 LOt A-B-36 5/24/2017 2:14:42 PM Page 13 140 0.0027 0.0095 141 0.0026 0.0095 142 0.0026 0.0095 143 0.0025 0.0095 144 0.0024 0.0094 145 0.0023 0.0094 146 0.0023 0.0094 147 0.0022 0.0093 148 0.0022 0.0092 149 0.0020 0.0091 150 0.0020 0.0091 151 0.0019 0.0089 152 0.0015 0.0088 153 0.0014 0.0088 154 0.0013 0.0086 155 0.0006 0.0086 156 0.0004 0.0086 157 0.0003 0.0083 LOt A-B-36 5/24/2017 2:14:42 PM Page 14 Duration Flows Flow(cfs) Predev Mit Percentage Pass/Fail 0.0028 53256 533602 1001 Fail 0.0029 49033 519894 1060 Fail 0.0030 45152 506077 1120 Fail 0.0031 41772 492645 1179 Fail 0.0032 38645 479212 1240 Fail 0.0033 35816 465175 1298 Fail 0.0034 33228 451357 1358 Fail 0.0035 30911 438035 1417 Fail 0.0036 28863 424382 1470 Fail 0.0037 26925 410620 1525 Fail 0.0038 25180 397353 1578 Fail 0.0039 23435 384141 1639 Fail 0.0040 21871 371039 1696 Fail 0.0042 20336 358102 1760 Fail 0.0043 18921 345220 1824 Fail 0.0044 17666 332338 1881 Fail 0.0045 16493 319732 1938 Fail 0.0046 15453 307290 1988 Fail 0.0047 14445 294739 2040 Fail 0.0048 13504 282848 2094 Fail 0.0049 12601 271067 2151 Fail 0.0050 11792 259507 2200 Fail 0.0051 11060 248277 2244 Fail 0.0052 10416 237211 2277 Fail 0.0053 9837 226422 2301 Fail 0.0054 9309 215907 2319 Fail 0.0055 8781 205668 2342 Fail 0.0056 8291 195704 2360 Fail 0.0057 7850 185905 2368 Fail 0.0058 7399 176546 2386 Fail 0.0059 7035 167408 2379 Fail 0.0060 6667 158655 2379 Fail 0.0061 6342 150397 2371 Fail 0.0062 6034 142580 2362 Fail 0.0063 5742 134873 2348 Fail 0.0064 5474 127606 2331 Fail 0.0065 5217 120615 2311 Fail 0.0066 4988 114064 2286 Fail 0.0067 4756 107678 2264 Fail 0.0069 4538 101458 2235 Fail 0.0070 4334 95512 2203 Fail 0.0071 4124 89677 2174 Fail 0.0072 3938 84282 2140 Fail 0.0073 3772 79162 2098 Fail 0.0074 3631 74208 2043 Fail 0.0075 3491 69584 1993 Fail 0.0076 3368 65124 1933 Fail 0.0077 3255 60886 1870 Fail 0.0078 3145 56922 1809 Fail 0.0079 3054 53250 1743 Fail, 0.0080 2965 49738 1677 Fail 0.0081 2876 46457 1615 Fail 0.0082 2779 43258 1556 Fail 0.0083 2681 40236 1500 Fail LOt A-B-36 5/24/2017 2:14:42 PM Page 15 0.0084 2585 37324 1443 Fail 0.0085 2491 34709 1393 Fail 0.0086 2391 32188 1346 Fail 0.0087 2278 29832 1309 Fail 0.0088 2181 27690 1269 Fail 0.0089 2080 25780 1239 Fail 0.0090 1997 24002 1201 Fail 0.0091 1927 22411 1162 Fail 0.0092 1864 20870 1119 Fail 0.0093 1790 19466 1087 Fail 0.0094 1718 18145 1056 Fail 0.0096 1664 16878 1014 Fail 0.0097 1595 15772 988 Fail 0.0098 1536 14748 960 Fail 0.0099 1479 13735 928 Fail 0.0100 1417 12777 901 Fail 0.0101 1361 11929 876 Fail 0.0102 1304 11109 851 Fail 0.0103 1242 10278 827 Fail 0.0104 1188 9617 809 Fail 0.0105 1147 9006 785 Fail 0.0106 1100 8368 760 Fail 0.0107 1047 7817 746 Fail 0.0108 1002 7322 730 Fail 0.0109 954 6782 710 Fail 0.0110 917 6347 692 Fail 0.0111 877 5874 669 Fail 0.0112 835 5476 655 Fail 0.0113 791 5096 644 Fail 0.0114 755 4700 622 Fail 0.0115 710 4401 619 Fail 0.0116 666 4076 612 Fail 0.0117 627 3797 605 Fail 0.0118 595 3515 590 Fail 0.0119 555 3214 579 Fail 0.0120 518 2960 571 Fail 0.0122 461 2696 584 Fail 0.0123 423 2517 595 Fail 0.0124 394 2358 598 Fail 0.0125 360 2197 610 Fail 0.0126 336 2056 611 Fail 0.0127 306 1903 621 Fail 0.0128 286 1743 609 Fail 0.0129 265 1626 613 Fail 0.0130 247 1482 600 Fail 0.0131 234 1327 567 Fail The development has an increase in flow durations from 1 /2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. LOt A-B-36 5/24/2017 2:14:42 PM Page 16 Water Quality Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. LOt A-B-36 5/24/2017 2:14:42 PM Page 17 Tank I POC Total Volume InfilOaled Compfiance vAth LID Mandaid 8% of 2 -yr In 50% 2-yr Used lor TotalVolunne Volurne Infiltrallon Treatment 9 Needs Through Volume Treatmenl Fa0% (awe -A) (ac-ftt (ac-ft) ME Cumulafive Percent �Vbturne Volume vlffWafion Infiltrated CredHl DIPIA Water Duality Pement Comment Water Quailly Treated BIG Ounabon Analysis Reis ult Failed LOt A-B-36 5/24/2017 2:14:42 PM Page 18 Model Default Modifications Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. IMPLND Changes No IMPLND changes have been made. LOt A-B-36 5/24/2017 2:15:05 PM Page 19 Appendix Predeveloped Schematic Basin �I i �1.33ac LOt A-B-36 5/24/2017 2:15:05 PM Page 20 Mitigated Schematic ank T LOt A-B-36 5/24/2017 2:15:05 PM Page 21 No. 3 — Closed Detention Systems (Tanks/Vaults) Maintenance Defect Conditions When Maintenance is Needed Results Expected Component When Maintenance Is Performed Storage Area Plugged Air Vents One-half of the cross section of a vent is Vents open and blocked at any point or the vent is damaged. functioning'. Debris and Sediment Accumulated sediment depth exceeds 10% All sediment and of the diameter of the storage area for 1/2 debris removed from length of storage vault or any point depth storage area. exceeds 15% of diameter. (Example: 72-inch storage tank would require cleaning when sediment reaches depth, of 7 inches for more than 1/2 length of tank.) Joints Between Any openings or voids allowing material to All joint between Tank/Pipe Section be transported into facility. tank/pipe sections (Will require engineering analysis to are sealed. determine structural stability). Tank Pipe Bent Out Any part of tank/pipe is bent out of shape Tank/pipe repaired or of Shape more than 10% of its design shape. (Review replaced to design. required by engineer to determine structural stability). Vault Structure Cracks wider than 1/2-inch and any Vault replaced or Includes Cracks in evidence of soil particles entering the repaired to design Wall, Bottom, structure through the cracks, or specifications and is Damage to Frame maintenance/inspection personnel structurally sound. and/or Top Slab determines that the vault is not structurally sound. Cracks wider than 1/2-inch at the joint of any No cracks more than inlet/outlet pipe or any evidence of soil 1/4-inch wide at the particles entering the vault through the walls. joint of the inlet/outlet pipe. Manhole Cover Not in Place Cover is missing or only partially in place. Manhole is closed. Any open manhole requires maintenance. Locking Mechanism Mechanism cannot be opened by one Mechanism opens Not Working maintenance person with proper tools. Bolts with proper tools. into frame have less than 1/2 inch of thread (may not apply to self-locking lids). Cover Difficult to One maintenance person cannot remove lid Cover can be Remove after applying normal lifting pressure. Intent removed and is to keep cover from sealing off access to reinstalled by one maintenance. maintenance person. Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, Ladder meets design misalignment, not securely attached to standards. Allows structure wall, rust, or cracks. maintenance person safe access. Catch Basins See "Catch Basins" See "Catch Basins". (No. 5). See "Catch Basins" (No. 5) 1 1 (No. 5). Volume V — Runoff Treatment BMPs — December 2014 4-36 No. 4 — Control Structure/Flow Restrictor Maintenance Defect Condition When Maintenance is Needed results Expected Component When Maintenance Is Performed General Trash and Debris Material exceeds 25% of sump depth or 1 Control structure (Includes Sediment) foot below orifice plate. orifice is not blocked. All trash and debris removed. Structural Damage Structure is not securely attached to Structure securely manhole wall. attached to wall and outlet pipe. Structure in correct Structure is not in upright position (allow up to 10% from plumb). position. Connections to outlet Connections to outlet pipe are not watertight and show signs of rust. pipe are water tight; structure repaired or replaced and works as designed. Any holes --other than designed holes --in the Structure has no structure. holes other than designed holes. Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing. Gate is watertight and works as designed. Gate cannot be moved up and down by one Gate moves up and maintenance person. down easily and is watertight. Chain is in place and Chain/rod leading to gate is missing or damaged. works as designed. Gate is repaired or Gate is rusted over 50% of its surface area. replaced to meet design standards. Orifice Plate Damaged or Missing Control device is not working properly due to Plate is in place and missing, out of place, or bent orifice plate. works as designed. Obstructions Any trash, debris, sediment, or vegetation Plate is free of all blocking the plate. obstructions and works as designed. Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of all potential of blocking) the overflow pipe. obstructions and works as designed. Manhole See "Closed See "Closed Detention Systems" (No. 3). See "Closed Detention Systems" Detention Systems" (No. 3). (No. 3). Catch Basin See "Catch Basins" See "Catch Basins" (No. 5). See "Catch Basins" (No. 5). (No. 5). Volume V — Runoff Treatment BMPs — December 2014 4-37 No. 5 — Catch Basins Maintenance Defect conditions When Maintenance Is Needed Results Expected When Component Maintenance is performed General Trash & Trash or debris which is located immediately No Trash or debris located Debris in front of the catch basin opening or is immediately in front of blocking inletting capacity of the basin by catch basin or on grate more than 10%. opening. No trash or debris in the Trash or debris (in the basin) that exceeds 60 percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Inlet and outlet pipes free Trash or debris in any inlet or outlet pipe blocking more than 1/3 of its height. of trash or debris. No dead animals or Dead animals or vegetation that could generate odors that could cause complaints vegetation present within or dangerous gases (e.g., methane). the catch basin. Sediment Sediment (in the basin) that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes Damage to inches or cracks wider than 1/4 inch and cracks. Frame and/or (Intent is to make sure no material is running Top Slab into basin). Frame is sitting flush on Frame not sitting flush on top slab, i.e., separation of more than 3/4 inch of the frame the riser rings or top slab from the top slab. Frame not securely and firmly attached. attached Fractures or Maintenance person judges that structure is Basin replaced or repaired Cracks in unsound. to design standards. Basin Walls/ Bottom Pipe is regrouted and Grout fillet has separated or cracked wider than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Misalignment function, or design problem. Basin replaced or repaired to design standards. Vegetation Vegetation growing across and blocking more than 10% of the basin opening, No vegetation blocking opening to basin. Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution [ I Volume V — Runoff Treatment BMPs — December 2014 4-38 No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance Is Needed Results Expected When Component Maintena►ipe is performed Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid Cover can be removed by to Remove after applying normal lifting pressure. one maintenance person. (Intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate opening Grate with opening wider than 7/8 inch.. Grate opening meets (If Applicable) Unsafe design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s) of the Grate is in place and Missing. L grate. meets design standards. No. 6 — Debris Barriers (e.g., Trash Racks) Maintenance Components General Defect Trash and Debris Condition When Maintenance is Needed Trash or debris that is plugging more than 20% of the openings in the barrier. Results Expected When Maintenance is Performed Barrier cleared to design flow capacity. Metal Damaged/ Bars are bent out of shape more than 3 Bars in place with no bends more Missing inches. than 3/4 inch. Bars. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% Barrier replaced or repaired to deterioration to any part of barrier. design standards. Inlet/Outlet Debris barrier missing or not attached to Barrier firmly attached to pipe Pipe pipe Volume V — Runoff Treatment BMPs — December 2014 4-39