Loading...
Edmonds Planning Comment Sheet (BLD-2008-0257).xls Commuter Rail Tukwila Station Project (236) - 30% Design Plans Andrea ClinkscalesProject Name: Edmonds Station (209)Review Period: ends November 17th, 2009 Project Development Coordinator (206) 398-5327 Reference Reviewer NameSht/PgReviewer's CommentDesigner's ResponseDesigner Number Mike Clugston - Edmonds Please include site plan drawings for the northern half Planning Divisionof the site to show bus improvements, etc. Mike Clugston - Edmonds Please indicate dual planter baskets on all 6 light poles Sheets 51-53, Planning Divisionwith proposed single baskets - result of Edmonds 56 Station Art Coordination meeting, 10/20/09 Mike Clugston - Edmonds Please include a full spec for the proposed Sternberg Sheet 81/85 Planning Divisionfixtures and poles (S1 and S2) and show the spec'ed light and pole in the detail on Sheet 85 Mike Clugston - Edmonds Per 11/6 email from Dave Emory at Lightrix to Noel Sheet 81 Planning DivisionMiller re: the use of LED lights - please indicate 4500K LEDs on the Sternberg specs Mike Clugston - Edmonds Please indicate additional saw cuts adjacent to lift Sheet 17, 76 Planning Divisionstation #3 to provide additional areas for landscaping around lift station - City of Edmonds to install additional landscaping per attached revisions on Sheet 76 Mike Clugston - Edmonds Please remove the Red Maple from the planting area Sheet 78 Planning Divisionbetween Railroad and Main and the tracks Mike Clugston - Edmonds Please indicate the curb pull back on the western side Sheet 19, 32 Planning Divisionof Railroad at Main to allow for the installation of the Standing Wave sculpture that was discussed by the Edmonds Station Art Coord. meeting on 10/20/09 Mike Clugston - Edmonds Please indicate the placement of the Standing Wave Sheet 19, 32 Planning Divisionsculpture in the area between Railroad and Main Streets and the tracks (discussed at Art Coord. meeting on 10/20/09) Mike Clugston - Edmonds Section 2.1 of the draft Sound Transit/City of Edmonds Sheet 56 Planning DivisionDevelopment Agreement for Edmonds Commuter Rail Station states that the Edmonds Station Project "includes: railing and fencing incorporating artistic elements." Please provide 6 examples of possible railing art that could be included throughout the platform fencing Edmonds Planning Comment Sheet (BLD-2008-0257)1 of 2 Commuter Rail Tukwila Station Project (236) - 30% Design Plans Andrea ClinkscalesProject Name: Edmonds Station (209)Review Period: ends November 17th, 2009 Project Development Coordinator (206) 398-5327 Reference Reviewer NameSht/PgReviewer's CommentDesigner's ResponseDesigner Number Mike Clugston - Edmonds Replace proposed Shore Pines with either Picea Sheet 77, 78 Planning DivisionOrientalis "Skyland's" (Skyland Oriential Spruce) or and 79 Picea pungens 'Hoopsii' (Hoopsii Colorado Blue Spruce) Mike Clugston - Edmonds An extensive amount of decidous shrubs are proposed Sheet 77, 78 Planning Divisionwithin the landscape areas. Replace a certain and 79 percentage of White Rockrose plants with similarly shaped and sized evergreen shrubs. Call Stephen to discuss. Edmonds Planning Comment Sheet (BLD-2008-0257)2 of 2