Loading...
Edmonds Village retail 2.docx MEMORANDUM January 20, 2017 TO: Ware Malcomb FROM: Steve Fisher, City of Edmonds Public Works, 425-771-0235 RE: Plan review for required trash enclosures BLD20161520 – Edmonds Village – new retail building, 22019 Highway 99 The proposed site plan shows that the two trash enclosures are now relocated from the original previous plan. Both structures are still orientated ideally and have the required minimum width openings, along with the direct truck approach distance. Since the relocation actually affords bit more space than the original spots, the minimum depth 10’ minimum of each enclosure needs to increase to , inside dimension. This allows for more maneuverability of stationary containers and a safer service scenario.