Loading...
Edmonds Waterfront Restoration Pilot Infiltration Test Technical Memorandum.pdfDraft Technical Memorandum TO: Mr. John Barker, Principal FROM: Annabel Warnell, EIT and Steven R. Wright, PE DATE: May 16, 2018 RE: Supplemental Geotechnical Engineering Services Edmonds Waterfront Restoration Pilot Infiltration Test Investigation Edmonds, Washington Introduction This technical memorandum summarizes the results of supplemental geotechnical engineering services that Landau Associates, Inc. (LAI) provided in support of the Edmonds Waterfront Restoration project, located at 220 Railroad Avenue in Edmonds, Washington (site). The general project location is shown on Figure 1. This technical memorandum has been prepared based on information provided by representatives of Barker Landscape Architects, PS, the Edmonds Senior Center, and the City of Edmonds (City); our review of available subsurface information for the project area; data collected during our field investigation; our familiarity with geologic conditions in the vicinity of the site; and our experience with similar projects. Project Understanding We understand the City plans to restore a portion of the shoreline by removing an existing bulkhead that supports a fill area near the Edmonds Senior Center. The fill area is currently occupied by a parking lot and a section of waterfront walkway. The walkway will be relocated landward to align approximately with the existing walkways on each side of the parking lot, and an upper tidal pocket beach area will be constructed where the existing bulkhead and fill are currently located. Current plans show proposed improvements consisting of the following elements: — two beach access stairways, one located at each end of the new walkway section — reorientation of the parking lot — minor modifications to the water system — a pile -supported bulkhead near the new walkway section — new drainage and bioretention facilities. As currently planned, the proposed bioretention facilities will have a minimum depth of 36 inches and be located along the eastern edge of the project site (i.e., near Railroad Avenue). LANDAU ASSOUATES 130 2nd Avenue South • Edmonds, Washington 98020 • (425) 778-0907 DRAFT Landau Associates Scope of Services LAI was subcontracted by Barker Landscape Architects, PS, who is completing design of the project on behalf of the City, to complete a supplemental subsurface investigation at the site and develop geotechnical conclusions and recommendations regarding the infiltration characteristics of the site soils. The supplemental geotechnical services described herein were provided in general accordance with the scope of services outlined in our proposal for supplemental geotechnical engineering services, dated April 24, 2018. Existing Site Conditions The following sections summarize subsurface conditions observed in the vicinity of the proposed bioretention facilities at the time of our investigation. Interpretations of site conditions are based on our review of available information, as well as the results of our site reconnaissance and subsurface explorations. Subsurface Soil Conditions Subsurface conditions in the vicinity of the proposed bioretention facilities were explored by excavating two test pits (PIT-1 and PIT-2) 6.4 and 6.2 feet (ft) below ground surface (bgs), respectively, on May 2, 2018. The approximate locations of our explorations are shown on Figure 2. Each representative soil type observed in our explorations was described using the soil classification system shown on Figure 3. Figure 4 presents summary logs of the conditions observed during our field investigation. Fill was observed in both test pits beneath existing surface conditions (i.e., up to about 1 ft of topsoil). The upper portion of the fill generally consisted of gravelly sand with silt, trash, and brick debris. The fill transitioned to black and silty for approximately 4 inches at 2.2 and 2.0 ft bgs in test pits PIT-1 and PIT-2, respectively. Beneath this layer, the fill consisted of sand with varying gravel content in a medium dense and moist condition that was observed to the maximum depths of our test pits. Groundwater Conditions At the time of our May 2018 supplemental field investigation, groundwater seepage was observed in test pit PIT-1 at 6.4 ft bgs. Groundwater was not observed in test pit PIT-2. The groundwater conditions reported herein and on the test pit logs are for the specific locations and date indicated and may not be indicative of other locations and/or times. Groundwater conditions will vary depending on local subsurface conditions, weather conditions, and other factors, with maximum groundwater levels generally occurring during late winter and early spring. Supplemental Geotechnical Engineering Services May 16, 2018 Edmonds Waterfront Restoration 2 DRAFT Landau Associates Infiltration Testing Two small-scale pilot infiltration tests (PITs) were performed in test pits PIT-1 and PIT-2 in general accordance with Appendix B of the 2017 Edmonds Community Development Code. The bottom surface area of each PIT was approximately 24 square feet. The general procedure for conducting each PIT involved: — excavating the test pit to the anticipated base depth of the proposed bioretention facility (PIT-1 and PIT-2 were performed at depths of 3.4 and 3.2 ft bgs, respectively) — installing a vertical measuring rod marked in 1/10-ft increments near the center of the test pit — adding water to the test pit to establish a water depth of approximately 1 ft — maintaining water in the test pit for a "pre-soak period" to saturate the anticipated receptor soils of the bioretention facility — installing a pressure transducer at the base of the test pit to continuously record water levels — adjusting the flow rate to maintain a stabilize water level in the test pit — turning off the inflow of water and recording the depth of water in the test pit over time with the pressure transducer and measuring rod — excavating an additional 3 ft below the PIT base to observe if water had mounded on hydraulic restrictive layers or continued to flow deep into the subsurface. The results of our infiltration testing are summarized in the following section of this technical memorandum. Conclusions and Recommendations In order to estimate long-term (design) infiltration rates, correction factors in Table B.1 of the 2017 ECDC were applied to the measured (field) infiltration rates to account for site variability and number of tests conducted (CFv = 0.33), the test method used (CFt = 0.5), and the degree of influent control to prevent siltation and bio-buildup (CFm = 0.9). A value of CFm = 0.9 assumes that maintenance to remove sediment build-up will be conducted on the facilities when performance drops to 90 percent of the intended design. If this is inconsistent with the planned maintenance schedule for the proposed facilities, the recommended design infiltration rates presented below should be reduced. Table 1 summarizes the results of our PIT investigation. Based on the conditions observed in our explorations, the results of our field investigation, and applicable correction factors provided by the 2017 ECDC, we recommend assuming design infiltration rates of 0.3 and 2.0 inches per hour at the approximate locations of PIT-1 and PIT-2, respectively, for soils at the anticipated base depth of the proposed bioretention facilities. Groundwater seepage was observed in PIT-1 at 6.3 ft bgs. No other hydraulic restricting layers were observed in our explorations. Supplemental Geotechnical Engineering Services May 16, 2018 Edmonds Waterfront Restoration 3 DRAFT Landau Associates Table 1. Summary of Pilot Infiltration Test Results PIT Designation PIT-1 PIT-2 in/hr = inches per hour PIT = Pilot infiltration test Field Infiltration Rate (in/hr) 2.0 14.0 Use of This Technical Memorandum Recommended Design Infiltration Rate (in/hr) 0.3 MCI Landau Associates, Inc. prepared this technical memorandum for the exclusive use of Barker Landscape Architects, PS, the Edmonds Senior Center, and the City of Edmonds for specific application to the Edmonds Waterfront Restoration project in Edmonds, Washington. Use of this technical memorandum by others or for another project is at the user's sole risk. Within the limitations of scope, schedule, and budget, our services have been conducted in accordance with generally accepted practices of the geotechnical engineering profession; no other warranty, express or implied, is made. We trust this technical memorandum provides you with sufficient information to proceed with the design of the project. If you have questions or require clarification on any of the items discussed above, please call the undersigned at (425) 778-0907. LANDAU ASSOCIATES, INC. Annabel Warnell, EIT Senior Staff EIT Steven R. Wright, PE Principal AMW/SZW/rgm [\\ED MDATA01\PROJECTS\1738\001\R\PITTEC MEMO\EDMONDS WATERFRONT RESTORATION PILOT INFILTRATION TEST TECHNICAL M EMORANDUM.DOCXi Supplemental Geotechnical Engineering Services May 16, 2018 Edmonds Waterfront Restoration 4 DRAFT Landau Associates Attachments: Figure 1. Vicinity Map Figure 2. Site and Exploration Plan Figure 3. Soil Classification System and Key Figure 4. Logs of Test Pits (PIT-1 and PIT-2) Supplemental Geotechnical Engineering Services May 16, 2018 Edmonds Waterfront Restoration 5 Puget Sound Project Location FA �1 N 0 0.5 1 Miles Data Source: Esri 2012 Edmonds Waterfront Restoration LANDAU Edmonds, Washington ASSOCIATES PF/ spers St s� ■ 11■■ =IMi 220th StSW — J =__ I�I ' �ANIL` Esperance 232nd St C day rSeattle Spokane Tacoma Ilympia W a s h i ngton Vicinity Map Figure 1 I 0 0 wMa Edmonds Senior Center Legend PIT-1 ® Approximate Pilot Infiltration Test Location and Designation 0 40 80 Scale in Feet Source: Goo le Earth Pro, 2018 Edmonds Waterfront Restoration Edmonds, Washington Figure Site and Exploration Plan 2 MAJOR DIVISIONS Soil Classification System Uscs GRAPHIC LETTER SYMBOL SYMBOL"I' TYPICAL DESCRIPTIONS (2)(3) GRAVEL AND CLEAN GRAVEL o ° o ° IQ GW Well -graded gravel; graveVsand mixture(s); little or no fines 0 GRAVELLY SOIL (Little or no fines) Poorly graded gravel; graveVsand mixture(s); little or no fines D o ° ° ° 0, GP 0 �> (More than Silty gravel; graveVsand/siltmixture(s) GRAVEL WITH FINES GM ZE Z coarse fraction retained (Appreciable amount of ° Q 0 N on No. 4 sieve) fines) GC Clayey gravel; gravel/sand/clay mixture(s) d LO z° SAND AND CLEAN SAND SW Well -graded sand; gravelly sand; little or no fines Cl) t t SANDY SOIL (Little or no fines) Poorly graded sand; gravelly sand; little or no fines SP Q 0`o SAND WITH FINES SM m OU (More than 50%of Silty sand; sand/silt mixture(s) @ coarse fraction passed (Appreciable amount of SC through No. 4 sieve) fines) Clayey sand; sand/clay mixture(s) p ML Inor anic silt and veryfine sand; rock flour; silty or clayey fine sand or clayey silt with slight plasticity t SILT AND CLAY CL U) 0 w N Inorganic clay of low to medium plasticity; gravelly clay; sandy y'w 0 o m a) (Liquid limit less than 50) clay; silty clay; lean clay QL Z o E >N N Organic silt; organic, silty clay of low plasticity (a r " (D MH Inorganic silt; micaceous or diatomaceous fine sand mN (D0.- SILT AND CLAY ul co0 CH Inorganic clay of high plasticity; fat clay Z E LL (Liquid limit greater than 50) Organic clay of medium to high plasticity; organic silt OH HIGHLY ORGANIC SOIL PT Peat; humus; swamp soil with high organic content GRAPHIC LETTER OTHER MATERIALS SYMBOL SYMBOL TYPICAL DESCRIPTIONS PAVEMENT ' ".: AC or PC Asphalt concrete pavement or Portland cement pavement ROCK RK Rock (See Rock Classification) WOOD i7o WD Wood, lumber, wood chips DEBRIS DB Construction debris, garbage Notes: 1. USCS letter symbols correspond to symbols used by the Unified Soil Classification System and ASTM classification methods. Dual letter symbols (e.g., SP-SM for sand or gravel) indicate soil with an estimated 5-15% fines. Multiple letter symbols (e.g., ML/CL) indicate borderline or multiple soil classifications. 2. Soil descriptions are based on the general approach presented in the Standard Practice for Description and Identification of Soils (Visual -Manual Procedure), outlined in ASTM D 2488. Where laboratory index testing has been conducted, soil classifications are based on the Standard Test Method for Classification of Soils for Engineering Purposes, as outlined in ASTM D 2487. 3. Soil description terminology is based on visual estimates (in the absence of laboratory test data) of the percentages of each soil type and is defined as follows: Primary Constituent: > 50% - "GRAVEL," "SAND," "SILT," "CLAY," etc. Secondary Constituents: > 30% and < 50% - "very gravelly," "very sandy," "very silty," etc. > 15% and < 30% - "gravelly," "sandy," "silty," etc. Additional Constituents: > 5% and < 15% - "with gravel," "with sand," "with silt," etc. < 5% - "with trace gravel," "with trace sand," "with trace silt," etc., or not noted. 4. Soil density or consistency descriptions are based on judgement using a combination of sampler penetration blow counts, drilling or excavating conditions, field tests, and laboratory tests, as appropriate. Drilling and Sampling Key Field and Lab Test Data SAMPLER TYPE SAMPLE NUMBER & INTERVAL Code Description a 3.25-inch O.D., 2.42-inch I.D. Split Spoon b 2.00-inch O.D., 1.50-inch I.D. Split Spoon c Shelby Tube d Grab Sample e Single -Tube Core Barrel f Double -Tube Core Barrel g 2.50-inch O.D., 2.00-inch I.D. WSDOT h 3.00-inch O.D., 2.375-inch I.D. Mod. California i Other - See text if applicable 1 300-lb Hammer, 30-inch Drop 2 140-lb Hammer, 30-inch Drop 3 Pushed 4 Vibr000re (Rotosonic/Geoprobe) 5 Other - See text if aoolicable Code PP = 1.0 Sample Identification Number TV = 0.5 PID = 100 Recovery Depth Interval W = 10 1�J 4 Sample Depth Interval D = 120 -200 = 60 J Portion of Sample Retained GS for Archive or Analysis AL GT CA Groundwater V Approximate water level at time of drilling (ATD) ♦ Approximate water level at time other than ATD Description Pocket Penetrometer, tsf Torvane, tsf Photoionization Detector VOC screening, ppm Moisture Content, % Dry Density, pcf Material smaller than No. 200 sieve, % Grain Size - See separate figure for data Atterberg Limits - See separate figure for data Other Geotechnical Testing Chemical Analysis Edmonds Waterfront Figure 1ALANDAU Restoration Soil Classification System and Key ASSOCIATES Edmonds, Washington c� 0 a 0) W r 0 0 PIT-1 SAMPLE DATA SOIL PROFILE GROUNDWATER 75 Excavation Method: Rubber -tired Backhoe a o Z @ H :° rn � Ground Elevation (fty Not Measured � a m a o r u Excavated By: City of Edmonds m ca a CL U `� Logged By: AMW w rn 06 U) H Z) — 0 SM Ivy over brown, silty, gravelly, fine to coarse - SAND with organics (loose, moist) - (TOPSOIL) SP- - SM Gray -brown, gravelly, fine to coarse SAND with —2 silt and brick debris (medium dense, moist) _ S-1 = d SM (FILL) / _ SP \ -Grades to light brown / /^ - S-2= d \ Black, silty, fine to coarse SAND with gravel / —4 \(medium dense, moist) / ------------------- - Gray -brown, fine to coarse SAND with gravel - (medium dense, moist) - -PIT performed at 3.4 ft bgs —6 S-3 d -Grades to gray Y � Groundwater Seepage at 6.4 Test Pit Completed 05/02/18 - Total Depth of Test Pit = 6.4 ft. PIT-2 SAMPLE DATA SOIL GROUNDWATER a '5 Excavation Method: R i d er-tBackhoe o Z @ :° U) T Ground Elevation (ft): Not Measured a m a o .2U) Excavated By: City of Edmonds CL M_ ca a o w U) 06 U)� c� Z)Logged �� 0 SM Ivy over brown, silty, fine to coarse SAND with grave nd organics (loose, moist) SP (TOPSOIL) Groundwater not encountered. Brown, gravelly, fine to coarse SAND with trash 2 (medium dense, moist) SK \ \ (FILL) SP J / S-1 I d Black, silty, fine to coarse SAND with gravel and / brick debris (medium dense, moist) / \------------------ 4 Light brown, gravelly, fine to coarse SAND (medium dense, moist) -Grades to gray -PIT performed at 3.2 ft bgs g S-2 d Test Pit Completed 05/02/18 Total Depth of Test Pit = 6.2 ft. 8 Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Edmonds Waterfront Figure 1ALANDAU Restoration Log of Test Pits /� ASSOCIATES Edmonds, Washington `�