Loading...
Edmonds Way-643_BLD20070863 Dentel.pdf DATE: January 30, 2008 TO: John Dentel Anjo222@msn.com FROM: Jeanie McConnell, Engineering Program Manager RE: Plan Check #: 20070863 Project: Dentel Remodel Project Address: 643 Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. 1.It is understood that the sewer for this site is currently connected to a septic system and with this project you will be making connection to the sanitary sewer system. Please revise the site plan to show the location of the existing septic system and the · proposed sanitary sewer line. The septic system shall be abated upon installation of the sanitary side sewer. · Please provide proof of easement to connect the new sanitary side sewer to the existing · sewer lateral located on the property adjacent to yours. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections.