DATE: November 3, 2008
TO: Tony Shapiro
tony@adshapiro.com
FROM: Jeanie McConnell, Engineering Program Manager
RE: Application #: bld20080635
Project: Anderson Office Building
Project Address: 665 Edmonds Way
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Marie Harrison.
City of Edmonds handouts and standard details can be referenced on the City website under
Development Services Department, Engineering Division.
Review 1 September 22, 2008
Review 2 November 3, 2008
GENERAL
11/3/08 Thank you for providing a cost estimate.
1.
Please revise the cost estimate for on-site improvements as follows:
a.Add cost estimate for trash enclosure
b.Add cost estimate for parking lot striping
c.Revise quantity of Type II CBs to two (2).
d.Add 54 Type II MH
e.Revise detention system cost estimate to include a breakdown of pipe size, material
and lineal footage. The plans indicate a detention vault will not be installed at this
site.
f.Add cost estimate for storm tightline. Specify pipe size, material and lineal footage.
g.Add cost estimate for footing drains. Specify pipe size, material and lineal footage.
h.Revise water pipe (domestic & fire) and sewer pipe estimates to include pipe size,
material and lineal footage.
Please revise the cost estimate for off-site (right-of-way) improvements as follows:
a.Revise concrete curb callout to specify concrete curb and gutter.
Edmonds Way-665_bld20080635_Anderson Office_2
Comments e-mailed: September 22, 2008 Page 1 of 3
b.Add cost estimate for the storm connection required at the existing manhole in the
City right-of-way.
c.Revise fire sprinkler service connection to include pipe size, material, lineal footage
and gate valve (if required by OVWSD).
11/3/08 Thank you for submitting a traffic control plan. Please revise the TCP to reflect
2.
the new WSDOT ferry lane striping on Edmonds Way.
- A Haul Route plan has not yet been provided. The response letter states the contractor
will provide. As the haul route for this site is fairly simply, it would probably be easiest to
add the route to the plans at this time. The haul route shall be SR-104 to Hwy 99 or I-5.
Truck traffic on side streets will not be permitted.
9/22/08 comment - Please submit a traffic control and haul route plan for review and approval.
11/3/08 Please find attached plan review comments from Storm Water Engineer Jerry
3.
Shuster.
C1 EXISTING CONDITIONS & TESC PLAN
11/3/08 The existing water service and sanitary sewer lines have not been shown on the
1.
plans. Please show utilities and note TBR. Locations can be redlined on the plans.
9/22/08 comment - Clearly show and label all utilities to be removed.
ok
2.
C2 GRADING, DRAINAGE & UTILITY PLAN
ok
1.
ok
2.
ok
3.
ok
4.
ok
5.
ok
6.
ok
7.
ok
8.
11/3/08 Response letter states OVWSD is currently reviewing the plans and 3 copies will
9.
be provided once approved.
9/22/08 comment - The water system falls under Olympic View Water & Sewer District
jurisdiction. Submit plan copies to OVWSD for approval and provide 3 copies of the approved
plan sheet(s) to the City.
11/3/08 - Please add one additional note that states All work and materials shall be in
10.
accordance with the current edition of WSDOT Standard Specifications and to City of
Edmonds standard specifications. It shall be the sole responsibility of the applicant and
the professional civil engineer to correct any error, omissions, or variation from the above
requirements found in these plans.
Edmonds Way-665_bld20080635_Anderson Office_2 Page 2 of 3
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.