Loading...
Edmonds Way-665_bld20080635_Anderson Office_3.pdf DATE: December 19, 2008 TO: Tony Shapiro tony@adshapiro.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application #: bld20080635 Project: Anderson Office Building Project Address: 665 Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. Review 1 – September 22, 2008 Review 2 – November 3, 2008 Review 3 – December 19, 2008 GENERAL 12/19/08 – Response letter state the cost estimate needs to be revised by the contractor. A 1. revised cost estimate was not submitted. Please submit so inspection fees and bond amount can be determined. 11/3/08 – Thank you for providing a cost estimate. Please revise the cost estimate for on-site improvements as follows: a.Add cost estimate for trash enclosure b.Add cost estimate for parking lot striping c.Revise quantity of Type II CB’s to two (2). d.Add 54” Type II MH e.Revise detention system cost estimate to include a breakdown of pipe size, material and lineal footage. The plans indicate a detention vault will not be installed at this site. f.Add cost estimate for storm tightline. Specify pipe size, material and lineal footage. g.Add cost estimate for footing drains. Specify pipe size, material and lineal footage. h.Revise water pipe (domestic & fire) and sewer pipe estimates to include pipe size, material and lineal footage. Please revise the cost estimate for off-site (right-of-way) improvements as follows: Edmonds Way-665_bld20080635_Anderson Office_3 Comments e-mailed: December 19, 2008 Page 1 of 2 a.Revise concrete curb callout to specify concrete curb and gutter. b.Add cost estimate for the storm connection required at the existing manhole in the City right-of-way. c.Revise fire sprinkler service connection to include pipe size, material, lineal footage and gate valve (if required by OVWSD). ok 2. ok 3. C2 – GRADING, DRAINAGE & UTILITY PLAN ok 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. ok 8. 12/19/08 – Copies have not yet been submitted to the City. Please provide. 9. 11/3/08 – Response letter states OVWSD is currently reviewing the plans and 3 copies will be provided once approved. 9/22/08 comment - The water system falls under Olympic View Water & Sewer District jurisdiction. Submit plan copies to OVWSD for approval and provide 3 copies of the approved plan sheet(s) to the City. ok 10. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Edmonds Way-665_bld20080635_Anderson Office_3 Page 2 of 2