Edmonds Way-665_bld20080635_Anderson Office_storm_2.pdf DATE: October 23, 2008 TO: File FROM: Jerry Shuster, P.E., Stormwater Engineering Program Manager RE: Application #: bld20080635 Project: Andersen Office Building Project Address: 665 Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Stormwater Review 1 – September 25, 2008 Items reviewed: Drainage report dated June 10, 2008 · Plan sheets C1-C3 · Stormwater Review 2 – October 23, 2008, 2008 Items reviewed: Drainage report dated June 10, 2008, revised October 3, 20008 · Plan sheets C1-C3 dated October 7, 2008 · Stormwater Pollution Prevention Plan dated June 13, 2008. · - Most items in the comments dated September 25, 2008 have been addressed 10/23/2008 except for the following that were detailed in the “Stormwater Management Review Checklist”: Item 1(C) – Page 2, last paragraph of the Drainage Report states that "The major · conveyance has a potential head water depth of 15.0 ft." Provide more explanation of this statement and how backwater effects may affect project drainage, if any. Item 3(A) – Stormwater Pipe materials not specified on sheet C2 · 10/23/2008 - The bulleted items in page 3 of the Stormwater Pollution Prevention Plan need to be updated to match the revived valued in the most recent Drainage Report . 9/25/2008 - The major items regarding site drainage that require revising include: the predevelopment site assumptions used in the model, the precipitation values used in the model, and the piping plan for roof water. In the erosion and sediment control plan, several steps in the construction sequence need to be added as well as relocation of the silt fence (or the limits of clearing). These items and minor revisions are detailed in the enclosed checklists. Bld20080635_Anderson Office Building_storm Page 2 of 2