EdmondsEyeREV1.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: October 2, 2008
TO: Chris Amonson
e-mail: Chris Amonson \[CAmonson@TGBArchitects.com\]
FROM: Ann Bullis, Building Official
RE: Revision to Permit #2007-1214
Project: Edmonds Eye Surgery
th
Project Address: 21911 76 Ave W #203
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a Permit Coordinator.
1.Medical Gas Room:
a.The 1-hour fire barrier walls of the medical gas room must extend to the underside of
the roof sheathing (IFC 3006.2 and IBC 706). Provide a section detail showing the
walls extending to the underside of the roof sheathing.
b.Revise door schedule to show the door as 60 minute rated (IFC 3006.2)
c.Revise door hardware schedule to show smoke gaskets and a self-closing device for
the med gas room door.
d.Mechanical ventilation (supply and exhaust) is required at the minimum rate of 1
cfm/sf of the area of the room.
2.Provide plumbing and mechanical revisions for the clothes washer and dryer, including DWV
and water piping changes, as well as venting of the dryer to the outside. Provide manufacturerÂ’s
information for dryer if the vent length exceeds 15 feet.
3.Revise mechanical plans to reflect floor plan changes.