Email from Applicant 12-17-13.pdf
I confirmed with the architect that it was included.
Thanks
On Dec 17, 2013 2:13 PM, "Machuga, Jen" <Jen.Machuga@edmondswa.gov> wrote:
Hi Rob,
th
I am in the process of reviewing your December 12 resubmittal for your proposed residence at 922 Cedar St.
nd
(BLD20131018) and did not find a response to Item #2.a of my November 22 letter (see attached). Could you
please provide confirmation as to whether or not the 6 upper floor cantilever over the garage was included in
the lot coverage calculations.
Thank you,
Jen