email zubair.rtf
bld20080651-Zubair
-1.doc (50 K...
From:
Zulauf, JoAnne
Sent:
Wednesday, February 18, 2009 2:55 PM
To:
'roger@pattenarch.com'
Subject:
FW: Eng Comments Zubair
Mr. Patten,
I am sending this email to follow up on the phone message I left for you earlier today. I discussed your
project with our Storm Engineer to confirm that my request for impervious surface calculations was
appropriate since I know that a large part of the paving was replacement of existing impervious surfaces.
He agreed that the calculations are necessary. As the total impervious is well over 2000sf (the pavers
alone are close to 2000sf), it is important that we know where the undetained water is going so we can be
sure that there are no problems in the future. I recall that when I spoke to the owner once on site and
another time in our office I did explain that these calculations as well as drainage information would be
required on his site plan. The owner had also mentioned that a drainage system had been placed under
the pavers in the backyard patio area. This also should be shown on the site plan; a detail of the system
and lines showing where the drainage is being diverted. We had discussed adding a drywell in the front
yard as well. If that has been added, please show on the site plan and show what being drained into it.
Please also indicate on the site plan the location of any catch basins in front of the property.
If you have any further questions, please let me know.
Thank you,
JoAnne Zulauf
-----Original Message-----
From: Zulauf, JoAnne
Sent: Thursday, February 12, 2009 9:39 AM
To: 'roger@pattenarch.com'
Subject: Eng Comments Zubair
Please see attached comments;
JoAnne Zulauf
Engineering Technician
City of Edmonds
(425) 771-0220 x1324
zulauf@ci.edmonds.wa.us