Email-RE_ Meadowview Estates As-Built Review-04.19.2016.pdf
From:McConnell, Jeanie
To:"Ian Faulds"
Cc:"Steve Anderson"
Subject:RE: Meadowview Estates As-Built Review
Date:Tuesday, April 19, 2016 4:25:17 PM
Ian,
One other thing I should have noted was the proposed property lines on the east side of Lots 3 & 4
have shifted from the original design. Can you please adjust the asbuilt drawing to be consistent
with the revised property lines?
Thank you,
Jeanie
From: McConnell, Jeanie
Sent: Tuesday, April 19, 2016 4:19 PM
To: 'Ian Faulds'
Cc: Steve Anderson
Subject: RE: Meadowview Estates As-Built Review
I did not see any specific redline notes from our inspectors plan set to pass along.
Regards,
Jeanie
From: Ian Faulds \[mailto:ifaulds@ldccorp.com\]
Sent: Tuesday, April 19, 2016 4:15 PM
To: McConnell, Jeanie
Cc: Steve Anderson
Subject: RE: Meadowview Estates As-Built Review
Hello Jeanie,
Great thank you for your review. Will there be any redlines that need to be picked up from the City
as part of this review?
We will make these updates and get the plans back to you as soon as possible.
Thank you,
Ian Faulds
Planning Technician
LDC, Inc
The Civil Engineering Group
T 425.806.1869 Ext.135
C 775.842.4755
14201 NE 200th St, Ste 100
Woodinville, WA 98072
www.LDCcorp.com
ifaulds@ldccorp.com
"EngineeringABOVE the Standard"
From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\]
Sent: Tuesday, April 19, 2016 4:11 PM
To: Ian Faulds <ifaulds@ldccorp.com>
Subject: RE: Meadowview Estates As-Built Review
Hi Ian,
I’ve reviewed the asbuilt drawings, and request the following changes:
Sheet RD-01
1)Show pipe diameter, material, and depth of water service lines.
2)Clearly show which meter serves which property. Also, it is my understanding that stubs were
not provided to every lot due to meter being located at the property line. Please revise
accordingly.
3)Show pipe diameter, material, and depth of sanitary sewer lines. Clearly show transition from
force line to gravity line and provide measurements for where this transition occurs.
4)Show location of dry utilities
Thank you,
Jeanie
From: Ian Faulds \[mailto:ifaulds@ldccorp.com\]
Sent: Monday, April 18, 2016 12:02 PM
To: McConnell, Jeanie
Subject: Meadowview Estates As-Built Review
Hello Jeanie,
Just checking in on the status of the Meadowview Estates as-builts you are reviewing
(PLN20140015).
Please let us know if we can help in any way.
Thank you,
Ian Faulds
Planning Technician
LDC, Inc
The Civil Engineering Group
T 425.806.1869 Ext.135
C 775.842.4755
14201 NE 200th St, Ste 100
Woodinville, WA 98072
www.LDCcorp.com
ifaulds@ldccorp.com
"EngineeringABOVE the Standard"