Loading...
Email-RE_ Meadowview Estates As-Built Review-04.19.2016.pdf From:McConnell, Jeanie To:"Ian Faulds" Cc:"Steve Anderson" Subject:RE: Meadowview Estates As-Built Review Date:Tuesday, April 19, 2016 4:25:17 PM Ian, One other thing I should have noted was the proposed property lines on the east side of Lots 3 & 4 have shifted from the original design. Can you please adjust the asbuilt drawing to be consistent with the revised property lines? Thank you, Jeanie From: McConnell, Jeanie Sent: Tuesday, April 19, 2016 4:19 PM To: 'Ian Faulds' Cc: Steve Anderson Subject: RE: Meadowview Estates As-Built Review I did not see any specific redline notes from our inspectors plan set to pass along. Regards, Jeanie From: Ian Faulds \[mailto:ifaulds@ldccorp.com\] Sent: Tuesday, April 19, 2016 4:15 PM To: McConnell, Jeanie Cc: Steve Anderson Subject: RE: Meadowview Estates As-Built Review Hello Jeanie, Great thank you for your review. Will there be any redlines that need to be picked up from the City as part of this review? We will make these updates and get the plans back to you as soon as possible. Thank you, Ian Faulds Planning Technician LDC, Inc The Civil Engineering Group T 425.806.1869 Ext.135 C 775.842.4755 14201 NE 200th St, Ste 100 Woodinville, WA 98072 www.LDCcorp.com ifaulds@ldccorp.com "EngineeringABOVE the Standard" From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\] Sent: Tuesday, April 19, 2016 4:11 PM To: Ian Faulds <ifaulds@ldccorp.com> Subject: RE: Meadowview Estates As-Built Review Hi Ian, I’ve reviewed the asbuilt drawings, and request the following changes: Sheet RD-01 1)Show pipe diameter, material, and depth of water service lines. 2)Clearly show which meter serves which property. Also, it is my understanding that stubs were not provided to every lot due to meter being located at the property line. Please revise accordingly. 3)Show pipe diameter, material, and depth of sanitary sewer lines. Clearly show transition from force line to gravity line and provide measurements for where this transition occurs. 4)Show location of dry utilities Thank you, Jeanie From: Ian Faulds \[mailto:ifaulds@ldccorp.com\] Sent: Monday, April 18, 2016 12:02 PM To: McConnell, Jeanie Subject: Meadowview Estates As-Built Review Hello Jeanie, Just checking in on the status of the Meadowview Estates as-builts you are reviewing (PLN20140015). Please let us know if we can help in any way. Thank you, Ian Faulds Planning Technician LDC, Inc The Civil Engineering Group T 425.806.1869 Ext.135 C 775.842.4755 14201 NE 200th St, Ste 100 Woodinville, WA 98072 www.LDCcorp.com ifaulds@ldccorp.com "EngineeringABOVE the Standard"