Emerson Site Hydraulic Analysis Comments.doc Emerson Site Hydraulic Analysis Comments 1. Need to follow the ECDC and the DOE 1992 Stormwater Management Manual for Western Washington when designing the detention system for the Emerson lot. All development sites less than one acre that discharge directly or indirectly to 2. a stream shall be required to limit the peak rate of runoff to the predeveloped condition two-year, 24-hour design storm, while maintaining the predeveloped condition peak runoff rate for the 10-year, 24-hour and 100-year, 24-hour storms. 3. Need predevelopment conditions peak flows and hydrographs for the 2-year, 24-hour design storm, 10-year, 24-hour design storm, and 100-year, 24 hour design storm. The predevelopment condition for all cases other than open water bodies shall be considered meadows or young second growth forest. 4. Need development conditions peak flows and hydrographs for the 2-year, 24-hour design storm, 10-year, 24-hour design storm, and 100-year, 24 hour design storm. 5. R/D facility needs to be designed with multiple orifices to maintain the predeveloped condition for the 2-yr, 10-yr, and 100-yr, 24-hr storms.