Loading...
ENG 1, Review Comments.pdfof EDz,o CITY OF EDMONDS PLAN REVIEW COMMENTS ., ENGINEERING DIVISION s9° (425) 771-0220 City Website: www.edmondswa.gov DATE: September 17, 2019 TO: Chris Reinhart chris@scr-arch.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application 4: BLD20190908 Project: Krassner — Remodel and Addition Project Address: 9320 — 2201h St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details with reference numbers, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. GENERAL 1) Please note that all standard details have been updated and have new reference numbers. Review the changes on the city website and update plans with the new details. 2) Submit ROW Permit Application form if needed. 3) Show all private easement information within the plan sets. Note AFN's for existing easements and/or recording documents for proposed easements as applicable. 4) Please remove any notes from the plan sheets that do not pertain to the project (for example, if the project is not proposing to do any underground utility work, please remove those notes, etc.). TESC 1) Please revise the plans to reference the new standard detail for the filter fence, ER-900. 2) Show construction entrance (if needed) on the plans and incorporate and reference new City standard detail ER-901. 3) Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Incorporate and reference New City standard detail ER-902. WATER 1) Show the water service line from the meter to the house. 2) Per the fixture count, a 1" meter will be required with a minimum 1-1/4" service line. Please show the installation of the new meter and service line or show that the existing meter and service line are sufficient. SEWER 1) Per City records, it appears that there is a sewer main that runs from two properties to the east to the west side of your home then heads north to 220th St SW. This sewer main is owned by Olympic View Water and Sewer District (OVWSD). a. Please show the sewer main to the east property line. b. Please provide verification from OVWSD that the line exists as shown and that OVWSD approves of the proposed project. c. Please show the limits of the easement. STORM 1) Please note that there is not credit given for existing impervious areas that are removed. If an area is removed to bare soils (even if replaced in the same location as the existing) the impervious area will be considered new impervious surface area. Please revise the impervious surface calculations accordingly. 2) It appears from aerial photos, there has been work done within the last year that has added impervious areas. Please show these areas as new and include them in your impervious surface area calculations. If the total new impervious area is larger than 2000sgft, the following will need to be added to the plans. a. Impervious Areas chart: Provide a breakdown for all the impervious surfaces. Project Site Category: (Category 1 or Category 2) Discharge location: (City's MS4 (municipal separate storm sewer system), BNSF Property, Puget Sound through the City's MS4) Type of area Square footage Stormwater Facility Lawn and Landscape Roofs Hard surfaces 25% Retrofit b. A stormwater management system will need to be installed per City codes and standards. c. Please note: additional comments not included in this review may be produced after reviewing the next submittal. 3) Show where the footing drains will discharge to. Page 2 of 2