Eng Comments 2 - BLD20181405.pdfof Ell-,vo CITY OF EDMONDS PLAN REVIEW COMMENTS 4�3"'A ENGINEERING DIVISION .(425) 771-0220 City Website: www.edmondswa.gov DATE: May 28, 2019 TO: Christine Greene christine@ryanrhodesdesigns.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application #: BLD20181405 Project: Silvia Heldridge - Single Family Residence Project Address: 923 Glen St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. 1st Review — 12/21/18 2nd Review — 5/28/19 GENERAL 1) OK 2) OK 3) OK 4) 5/28/19 — This comment remains due to comments from the stormwater review by the City's Stormwater Engineer. 12/21/18 Comment: If LID is to be installed as a requirement for stormwater mitigation, a Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction, final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 5) OK 6) 5/28/19 — Comment was not addressed. Please add the note below to the Civil Plan Sheets. 12/21/18 Comment: Consistent with Edmonds Community Development Code 18.80.060, driveway slopes shall not exceed 14% slope. Please indicate this requirement on the plans. 7) 5/28/19 — Comment was partially addressed. `b' Below was not addressed. Please revise the plans accordingly. 12/21/18 Comment: Per Snohomish County, it appears that the property adjacent to the south property line is City right-of-way. a. No retaining walls may be permitted within the right-of-way. b. At the location of the walkway and driveway, the area between the edge of asphalt and the property line shall be asphalt. Once on private property the driveway/walkway may be any hard surface. c. Please revise the plans accordingly. d. If you find documentation that states the property to the south is not City right-of- way, please provide the information to the City. 8) OK 9) OK 10) 5/28/19 — Comment was not addressed. 12/21/18 Comment: Show the proposed bollards for utility pole relocation. 11) 5/28/19 — Comment was addressed; however, please add the note below to the plans. 12/21/18 Comment: Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. Where the asphalt is too then to complete a grind and overlay, the contractor will install the patch such that there is a minimum of 2" of base rock and 4" of asphalt. 12) Please note: additional comments not included in this review may be produced after reviewing the next submittal. SHEET C1.00 — Cover & Index 1) 5/28/19 — Comment was partially addressed. Please include phone, cable, and the Fire District One. 12/21/18 Comment: Provide Utility Purveyor information. SHEET C1.01 - Notes 1) OK SHEET 1 OF 1— Topographic Survey No Comments SHEET 2.00 — DEMOLITION AND TESC PLAN TESC 1) OK 2) OK 3) OK Page 2 of 5 DEMO 1) OK 2) 5/28/19 — Comment was addressed; however the note that was added was to remove the water service line and meter entirely. The site needs to have access to water during demo and construction of the new single family residence. If the water line is being removed entirely, please note how this site will have access to water or revise the plans as indicated in the comment below. It was noted on Sheet C3.00 with the AVB; however, it is not typical for the new service line to be added at demo or start of construction due to possible damage to meter/setter and changes in final grade elevations. Therefore, please show the AVB on the existing service line. 12/21/18 Comment: Add a note that an AVB to be installed on the water line (where it is cut and the meter). SHEET 2.01— TESC Details No Comments NEW SHEET 2.02 — TESC Details. No Comments SHEET 3.00 — Utility Plan GENERAL 1) OK WATER 1) OK 2) OK 3) OK 4) OK 5) OK 6) OK SEWER 1) OK 2) OK 3) OK DRY UTILITIES 1) OK SHEET 4.00 — Grading and Drainage Plan GENERAL 1) OK Page 3 of 5 STORM 1) 5/28/19 — Comment was partially addressed. Please fill out the Stormwater Facility portion in the chart. 12/21/18 Comment: Impervious Areas chart: Provide a breakdown for all the impervious surfaces. Project Site Category: (Category 1 or Category 2) Discharge location: (City's MS4 (municipal separate storm sewer system), BNSF Property, Puget Sound through the City's MS4) Type of area Square footage Stormwater Facility Lawn and Landscape Roofs Hard surfaces 25% Retrofit 2) 5/28/19 — Comment was addressed; however, please combine this sheet with the drainage sheet. 12/21/18 Comment: Show where the footing drains will discharge to. 3) OK 4) OK 5) 5/28/19 — Comment was not addressed. 12/21/18 Comment: The City does not allow a direct connection to the City storm main. Please show a catch basin being installed at the connection to the City stormwater main. 6) 5/28/19 — Comment was addressed; however, the rim needs to be provided for CB requested in comment 5 above. 12/21/18 Comment: Provide invert elevations for all pipes at catch basins and manholes. Please note that a minimum of 2' of cover is required for all pipes located under driveable surfaces and 1' of cover under landscape areas. 7) OK 8) OK 9) OK 5/28/19 — Additional comments. 10) The plans state that a pump is to be installed. Please provide details of the pump system consistent with the comments provided by the City's Stormwater Engineer, Zachary Richardson. STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(a edmondswa.gov with any specific questions you may have regarding his comments. Page 4 of 5 NEW SHEET - SHEET 4.01 — Landscape & Drainage Details No Comment NEW SHEET - SHEET 4.02 — Grading Enlargement 1) Pavers are not permitted within the City right of way. Please revise the plans as directed under the general comments #7. NEW SHEET - SHEET 5.00 — Foundation Drainage Plan 1) Please combine this sheet with Sheet 4.00 Grading and Drainage Plan. Page 5 of 5