Loading...
ENG Comments 2.pdfof Ell-'Vo CITY OF EDMONDS PLAN REVIEW COMMENTS 4�3"'A ENGINEERING DIVISION .(425) 771-0220 City Website: www.edmondswa.gov DATE: June 15, 2018 TO: Deane Nault deanenault@gmail.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application 4: BLD20180533 Project: Swimming Pool Project Address: 919 Sprague St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. 5/3/18 — I" Review Comments 6/15/18 — 2nd Review Comments 1) OK 2) 6/15/18 — Comment was addressed; however, the surface water runoff from the pool must discharge to the onsite stormwater management system. The Site Plan proposed to sheet flow the surface water runoff to the ground; however, it cannot be guaranteed that the runoff will reach the storm system; therefore, the surface water runoff from the pool decking shall be directly connected to the stormwater management system. Please revise the plans accordingly (make sure to include invert elevations (so that pipe slope and cover can be verified), pipe material, and size). 5/3/18 Comment: It appears that there was a conversation that the surface water runoff from the decking of the pool was to discharge to the stormwater facility. Please show this on the plans. 3) OK 4) OK 5) OK 6) OK Page 2 of 2