Loading...
Eng Comments 3 - BLD20181405.pdfof Ell-,vo CITY OF EDMONDS PLAN REVIEW COMMENTS 4�3"'A ENGINEERING DIVISION .(425) 771-0220 City Website: www.edmondswa.gov DATE: October 14, 2019 TO: Christine Greene christine@ryanrhodesdesigns.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application 9: BLD20181405 Project: Silvia Heldridge - Single Family Residence Project Address: 923 Glen St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. I" Review—12121118 2nd Review — 5/28/19 3rd Review—10/14/19 GENERAL 1) OK 2) OK 3) OK 4) 10/14/19 - This comment remains due to comments from the stormwater review by the City's Stormwater Engineer. 5/28/19 — This comment remains due to comments from the stormwater review by the City's Stormwater Engineer. 12121118 Comment: If LID is to be installed as a requirement for stormwater mitigation, a Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction, final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 5) OK 6) OK 7) 10/14/19 — Comment was addressed; however, in the legend it states that the Sandset Pavers, Pervious pavers, concrete, and asphalt is to be completed by others. Please remove the `by others' comments. This project should be designed for and constructed as designed under this permit. 5/28/19 — Comment was partially addressed. `b' Below was not addressed. Please revise the plans accordingly. 12121118 Comment: Per Snohomish County, it appears that the property adjacent to the south property line is City right-of-way. a. No retaining walls maybe permitted within the right-of-way. b. At the location of the walkway and driveway, the area between the edge of asphalt and the property line shall be asphalt. Once on private property the driveway/walkway may be any hard surface. c. Please revise the plans accordingly. d. If you find documentation that states the property to the south is not City right-of- way, please provide the information to the City. 8) OK 9) OK 10)10/14/19 — Comment was addressed; however, please label the bollards on the Civils. 5/28/19 — Comment was not addressed. 12121118 Comment: Show the proposed bollards for utility pole relocation. 11) OK 12)10/14/19 - New Comment: Some Civil plan sheets (not all) and the Site Plan show a retaining wall adjacent to the driveway. If there is a wall to be installed, provide top and bottom of wall elevations to verify that there is not a surcharge on the wall. If there is a surcharge on the wall, the wall will need to be engineered. As stated in a previous review, no retaining walls are permitted within the right-of-way. 13)10/14/19 - New Comment: As changes are made to the plan sheet, please do not cloud the Civils. This should only occur after the plans are issued and revisions occur. 14) Please note: additional comments not included in this review may be produced after reviewing the next submittal. SHEET C1.00 — Cover & Index 1) OK SHEET C1.01 - Notes 1) OK SHEET 1 OF 1 — Topographic Survey No Comments SHEET 2.00 — DEMOLITION AND TESC PLAN TESC Page 2 of 4 1) OK 2) OK 3) OK DEMO 1) OK 2) OK SHEET 2.01— TESC Details No Comments NEW SHEET 2.02 — TESC Details. No Comments SHEET 3.00 — Utility Plan GENERAL 1) OK WATER 1) OK 2) OK 3) OK 4) OK 5) OK 6) OK SEWER 1) OK 2) OK 3) OK DRY UTILITIES 1) OK SHEET 4.00 — Grading and Drainage Plan GENERAL 1) OK STORM 1) OK 2) OK 3) OK Page 3 of 4 4) OK 5) OK 6) 10/14/19 — Comment was addressed; however, the rim to invert does not allow for the minimum of 2' of cover under drivable surfaces. Please revise the plans accordingly. 5/28/19 — Comment was addressed; however, the rim needs to be provided for CB requested in comment 5 above. 12121118 Comment: Provide invert elevations for all pipes at catch basins and manholes. Please note that a minimum of 2' of cover is required for all pipes located under driveable surfaces and I 'of cover under landscape areas. 7) OK 8) OK 9) OK 10) 10/14/19 — Comment was addressed; it appears that a pump is no longer going to be installed. However, there are portions of the stormwater system that do not meet the minimum requirements (V cover under landscape areas, 2' of cover under drivable surfaces). Please revise the plans accordingly. 5/28/19 Comment: The plans state that a pump is to be installed. Please provide details of the pump system consistent with the comments provided by the City's Stormwater Engineer, Zachary Richardson. STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(a,edmondswa.gov with any specific questions you may have regarding his comments. NEW SHEET - SHEET 4.01— Landscape & Drainage Details No Comment NEW SHEET - SHEET 4.02 — Grading Enlargement 1) OK NEW SHEET - SHEET 5.00 — Foundation Drainage Plan 1) OK Page 4 of 4