Loading...
Eng Comments 3.pdf DATE: July 10, 2008 TO: Mike Adams TGB Architects madams@tgbarchitects.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application #: bld20080065 Project: CRE Properties Office/Warehouse th Project Address: 21020 70 Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Theresa Umbaugh. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. Review 1 – April 7, 2008 Review 2 – June 2, 2008 Review 3 – July 10, 2008 C3.1 – GRADING & DRAINAGE PLAN 1.ok 2.ok 3.4/7/08 - Is there an existing drainage easement along the north property line? 6/2/08 - A new drainage easement has been recorded against the property, but the proposed · building encroaches into the easement area. The easement area must be reduced or the building location revised accordingly. 7/10/08 - Please clarify the response comment: “The easement in question is a side · sewer easement recorded for the purpose of sewer drainage for the new proposed building that was to drain to the north . . .” The easement I am referring to was recorded in 2008 under AFN 200804090363. The plans show 12” HDPE storm pipe proposed within this easement. That portion of the existing storm pipe, serving as the storm drainage system for the property to the north, is to be abandoned where it runs under the proposed building. The storm system is to CRE Warehouse – bld20080065 be re-routed through this new drainage easement. It does not appear to me as though this easement can be relinquished. Please respond to my comment of 6/2/08. 4.ok 5.ok 6.ok 7.ok 8.ok C51. – TRAFFIC CONTROL PLAN 1.ok 2.ok 3.ok 4.ok th 5.4/7/08 - Please revise the traffic control plan to include set up for sewer crossing in 70 Ave W. a.Show work area th b.A lane closure will be required. Entire closure of 70 Ave W will not be permitted. c.Show placement of cones and additional signage required for lane closure. 6/2/08- The traffic control plan was not revised to include this information. · 7/10/08 – Please refer to the City’s traffic control handout #E81 for sample lane closure · traffic control plans. The plans submitted still do not show traffic control set up for the lane closures that will be required for the sewer crossing. A1.00 – ARCHITECTURAL SITE PLAN 1.Show all easements, existing and proposed, encumbering the property. Please refer to comment C3.1 - #3 above. · 2.ok A1.10 – LANDSCAPE PLAN 1.ok Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Page 2 of 2