Eng Final Inspection Correction Notice.pdfCITY OF EDMONDS
of EDA0 CORRECTION NOTICE
ENGINEERING DIVISION
CJ N
(425) 771-0220
City Website: www.edmondswa.gov
,q 1890
DATE: October 28, 2019 NUMBER: BLD20171071
SITE Rodeey Casper —
OWNER: Casper CONTACT: Rodney.Casper@ssamarinepartners.com
ADDRESS: 21421 92" d Ave W
TYPE OF
INSPECTION: FINAL INSPECTION
❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED
❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR
ON SITE
® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE
APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED.
❑ RECALL FOR INSPECTION
❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST.
❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR
1. Permanently stabilize exposed soils. The soils are still exposed and there appears to be an
erosion issue.
2. Install access for vehicles to the new garage. If a wheel path is intended to be used for the
vehicles, the path will need to be clearly defined.
3. Please revise the asbuilt drawing so that it's clear what lines are what. The asbuilt should show
the sewer, tightline for the stormwater runoff and the drywell. The asbuilt should include
dimensions, pipe material and size.
For inspection scheduling call 425-771-0220 x1326.
Page 2 of 2