Loading...
Eng Final Inspection Correction Notice.pdfCITY OF EDMONDS of EDA0 CORRECTION NOTICE ENGINEERING DIVISION CJ N (425) 771-0220 City Website: www.edmondswa.gov ,q 1890 DATE: October 28, 2019 NUMBER: BLD20171071 SITE Rodeey Casper — OWNER: Casper CONTACT: Rodney.Casper@ssamarinepartners.com ADDRESS: 21421 92" d Ave W TYPE OF INSPECTION: FINAL INSPECTION ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ❑ RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. Permanently stabilize exposed soils. The soils are still exposed and there appears to be an erosion issue. 2. Install access for vehicles to the new garage. If a wheel path is intended to be used for the vehicles, the path will need to be clearly defined. 3. Please revise the asbuilt drawing so that it's clear what lines are what. The asbuilt should show the sewer, tightline for the stormwater runoff and the drywell. The asbuilt should include dimensions, pipe material and size. For inspection scheduling call 425-771-0220 x1326. Page 2 of 2