18105 Sunset Way
August 12, 2015
Edmonds, WA 98026-5331 tonys@adshapiro.com 425.778.5400
Jennifer Lambert��is
Engineering Division
City ofEdmonds VIA Hand delivered�
Subject: Response to Engineering Comment letter, 2015-06-30
Project: Permit No: BLD2015-0639 Pruett Residence Remodel
Ms. Lambert:
The numbers below correlate with your comments of the above date:
General:
1. Separate plan sheet has been generated separating engineering/planning documentation from
building, Sheet A102.
2. Rockery at the east PL are shown, detail 3/ A102.
Storm A102
1. Impervious surface chart has been revised.
Engineering Plan Review Comments, sheet A102
2. Existing roof area has been removed from the chart. Only new roof area has been listed.
3. New concrete slab which replaces some existing area, is shown on the plan, detail 3/A102.
4. Site plan of existing conditions clearly shows the existing area which existed prior to 1976, detail
4/A102.
5. Site Plan New Total Impervious Area clearly shows the total impervious surface for the
completed project, detail 4/,102.
6. Primary site plan, 3/A102 shows fencing, driveway, garage and 6 parking stalls.
7. Travel path for ADU occupant is shown on the site plan 3/A102, 236 sf.
Utilities:
1. Utilities are shown on the drawing primary site plan 3/A102. No storm sewer exists on the site.
Respectfully:
A.D. Shapiro Ar iffe—tts, PS
Aapiro, AIA, NCARB
Principal