Loading...
eng20070360.1.pdfHawkins, Jaime From: Hawkins, Jaime Sent: Wednesday, August 22, 2007 12:08 PM To: 'Bobby Brooks' Subject: FW: 98th ave water main replacement Hello Boby, as per our conversation today. Please have your consultant revise sheet 3 and 4 to show the City of Edmonds standard details. Sheet 3: Replace the Trench Restoration detail with E2.3, the Overlay detail for the half street overlay you have shown is acceptable. Sheet 4: Please remove detail 1, 3, and 4 and replace with E1.1, el.2 and E1.3 respectively. Please provide 3 copies of the revision so that I can continue and final the review. Thank you, Jaime Hawkins City of Edmonds Engineering Division -----Original Message ----- From: McConnell, Jeanie Sent: Friday, August 17, 2007 1:56 PM To: Hawkins, Jaime; Sibrel, Ed Cc: 'Bobby Brooks' Subject: FW: 98th ave water main replacement Jaime or Ed, Can you please get back with Bobby on the review of this ROW permit. Thanks, Jeanie -----Original. Message ----- From: Bobby Brooks (mailto:BobbyBpovwater.com] Sent: Monday, August 13, 2007 1:37 PM To: McConnell, Jeanie Subject: 98th ave water main replacement Where are we at with the permit on this job BobbyB I