eng20070360.1.pdfHawkins, Jaime
From:
Hawkins, Jaime
Sent:
Wednesday, August 22, 2007 12:08 PM
To:
'Bobby Brooks'
Subject:
FW: 98th ave water main replacement
Hello Boby, as per our conversation today. Please have your consultant revise sheet
3 and 4 to show the
City of Edmonds standard details.
Sheet 3: Replace the Trench Restoration detail with E2.3, the Overlay detail for the
half street overlay
you have shown is acceptable.
Sheet 4: Please remove detail 1, 3, and 4 and replace with E1.1, el.2 and E1.3
respectively.
Please provide 3 copies of the revision so that I can continue and final the review.
Thank you,
Jaime Hawkins
City of Edmonds
Engineering Division
-----Original Message -----
From: McConnell, Jeanie
Sent: Friday, August 17, 2007 1:56 PM
To: Hawkins, Jaime; Sibrel, Ed
Cc: 'Bobby Brooks'
Subject: FW: 98th ave water main replacement
Jaime or Ed,
Can you please get back with Bobby on the review of this ROW permit.
Thanks,
Jeanie
-----Original. Message -----
From: Bobby Brooks (mailto:BobbyBpovwater.com]
Sent: Monday, August 13, 2007 1:37 PM
To: McConnell, Jeanie
Subject: 98th ave water main replacement
Where are we at with the permit on this job BobbyB
I