Loading...
eng2007sp05102.8.30.07.pdf*************** -COMM. JOURNAL- ******************* DATE RUG -30-2007 ***** TIME 12:13 *** P.01 MODE = MEMORY TRANSMISSION STRRT=AUG-30 12:11 END=AUG-30 12:13 FILE NO.= 004 STN NO. COM ABBR NO. STATION NAME/TEL.NO. PAGES DURATION 001 OK a 97752634 005/005 00:01'37" F E1041 Edmonds City of E m cy Development Services Department Build ing-Engineeri ng-Planni ng 1215 th Avenue North •2"d Floor Edmonds, WA 98020 11t Phone: 425.771.0220 Fax: 425.771.0221 COVER wi: o'VAM++dA�.. Date Transmitted: ' Recipient's Il=ax No: No. of Pages: tlnciuding cover p090:y If there are any problems during transmission or documents are received incomplete, please call 425. 771.0220 and ask for: L:Temp/jsna/f6rme/05FAX City of Edmonds 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Comments Plan Check 5-05-102 Date: August 30, 2007 Project Name/Address: R at Short Plat/9114 240"' ST SW Contact Person/Address/Fax: :Tristar Home/Attn: Pat Crosby/ tristarhomeskattglobal.net /fax:425-775-2634~ Reviewer: Jaime Hawkins, Engineering Tech II Division: Engineering The subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. Please resubmit 2 sets of revised drawings for review. 1. Please provide engineering with estimate for onsite and offsite improvements. 2. Please provide review fee of $860.00. 3. Please provide signed Special Inspection Agreement form. Form Provided. 4. Please provide three (3) copies of approved plans signed by Olympic View Water and Sewer District. DATE FAXED/E-MAILED (Attach fax transmittal) PAGE + of S:\ENGR\PRIVATE DEVELOMENT PROJECTS\REVIEW\LAND USEWBDIVISION & REQ'S\PLN200500102 Ryan sp revldoc CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\TEMP\BUILDING\SpecialInspectionAgreementIBC.doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official L:\TEMP\BUILDING\SpecialInspectionAgreementIBC.doc 7/04 Date Date Date Date SPECIAL INSPECTION AND TESTING SCHEDULE PROJECT NAME PROJECT ADDRESS REINFORCED CONCRETE, GUNITE, GROUT AND MORTOR: Concrete Gun'ite Grout Mortar Aagregate Tests Reinforcina Tests ......_. Mix Designs Reinforcina Placement .-............ _............. Batch Plant Inspection Inspect Placinq Cast Samples .................. ....... Pick-up Samples Compression Tests PRECAST/PRESTRESSED CONCRETE: .. Pipes Post -Tens Pre -Tens Claddh_ Aggreqate Tests forcin Tests _..........____ .......... e........-.... Tendon 'Tests Mix Designs Reinforcing Placement Insert Placement Concrete Batching Concrete Placement Instailatlon Inst kion Cast Samples, uIT Pick-uy Sam le Campresslon Tests MASONRY: Special Inspection Stresses Used Preliminary Acceptance Tests (Masonry Units, Wall Prisms) Subsequent Tests (Mortar, Grout, Field Wall Prisms) Placement Inspection of Units FOUNDATION WORK: ................ Soil Bearing Verification Subsurface Drainage Installation .................. Foundation Drainage Installation Temporary Erosion Control Installation Additional Instructions on Other Tests and Inspections: L:\TEMP\BUILDING\SpecialInspectionAgreementIBCl.doc 7/04 BUILDING PERMIT NO. TESTING/INSPECTION AGENCY or SPECIAL INSPECTOR STRUCTURAL STEEL/WELDING: Sample and Test (list specific members below) Shop Material Identification Welding Inspection ❑ Shop ❑ Field Ultrasonic Inspection ❑ Shop ❑ Field _ High -Strength Bolting ❑ Shop ❑ Field Inspection ❑ A325 El IN El El ❑ A490 Metal Deck Welding .... Reinforcing Steel Welding Inspection Metal Stud Welding Inspection Concrete Insert Welding Inspection FIREPROOFING: Placement Inspection Density Tests Thickness Tests Inspect Batching INSULATING CONCRETE: Sample and Test Placement Inspection Unit Weights FILL MATERIAL: _ Acceptance Tests _ Placement Inspection Field Density (Compaction) Proof Rolling Final Site Grading STRUCTURAL WOOD: _ Shear Wall Nailing Inspection _ Inspection of Gludam Fab. Inspection of Truss Joist Fab. Sample and Test Components MISC: _ Final Geotechnical Report Winterization Measures