Loading...
eng20090114-Comcast.doc City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application : Date # ENG20090114 April 30, 2009 th Project Name/Address: Comcast/Sefnco Fiber Install 21600 76 Ave W Contact Person/Address, Fax or E-mail: Clint Sweetser/Sefnco 253-405-5202 Reviewer: JoAnne Zulauf Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: thth 1)Traffic control plan submitted for 76 Ave W does not show area of work. 76 Ave W. is a four lane road with a lot of traffic. Please submit complete traffic control plan showing all cones, signs and work area. thth 2)Traffic control plan submitted for intersection of 216 St SW and 80 Ave W shows area of work on SE th corner. Construction plans show work on NE corner of intersection. Also it shows 80 with a center ththth turn lane. 80 Ave W is a two lane road. 216 and 80 are relatively low traffic roads so only two flaggers needed at most during hours of school traffic. Please resubmit a corrected traffic control plan showing appropriate traffic control devices for this intersection. Please resubmit 3 copies of the traffic control plans to an Engineering Technician. Please contact me at 425-771-0220 ext 1324 or by e-mail at zulauf@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 5/6/08 PAGE(s)