Loading...
eng20090426-Edward_Jones 1.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application :Date # BLD 20090426July 10, 2009 Project Name/Address: Edward Jones Investments 313 Main St Sign Contact Person/Address, Fax or E-mail: Pacific Sign Erectors pacificsignerectors@msn.com Reviewer: JoAnne Zulauf Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1) Since installing the signs will nescessitate using the right of way for a period of time, a right of way construction permit will be required. 2) A Street Use permit will be required for the use of the right of way of the sign to be installed and for the awning. Edmonds Community Development Code Chapter 18.70.000 Section B states A Street Use permit is required “to place or maintain in, over or under any public place, right of way, roadway, parking strip, and/or sidewalk, including the air space above them, any temporary or moveable object.” I am attaching a permit applications which must be signed by the business owner, and an example of the insurance certification required from the business owners insurance company. PLEASE NOTE: Insurance certification must cover 300,000 Personal Injury and 100,000 Property Damage. The City of Edmonds must be named as the “additional insured”. Once the application and the insurance certification are received Engineering will approve permits. Please resubmit 3 copies of the traffic control plans to an Engineering Technician. Please contact me at 425-771-0220 ext 1324 or by e-mail at zulauf@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED July 10, 2009